Article

Bluetooth Load-Cell-Based Support-Monitoring System for Safety Management at a Construction Site

1
Safety Inspection for Infrastructure Laboratory (SIIL), Advanced Institute of Convergence Technology (AICT), 145 Gwanggyo-ro, Yeongtong-gu, Suwon-si 16229, Gyeonggi-do, Korea
2
Research & Development Institute, LOTTE Engineering & Construction, 38, Naruteo-ro 10-gil, Seocho-gu, Seoul 06515, Korea
*
Author to whom correspondence should be addressed.
Submission received: 18 March 2022 / Revised: 10 May 2022 / Accepted: 11 May 2022 / Published: 23 May 2022
(This article belongs to the Section Physical Sensors)

Abstract

:
At construction sites, temporary facilities have caused continuous collapse accidents, causing damage to human life. If the concrete placing height is high and the worker is pushed into one place at the time of placing, the working load may be exceeded and a collapse accident may occur. In order to solve this problem, in this research, we developed a monitoring load-measurement program based on a Bluetooth wireless load cell (load-cell sensor) so that the load can be converted to digital and the numerical value can be confirmed by the pressure sensor. The load cell using Bluetooth was designed and manufactured according to the support. Then, the performance was verified through 3D finite element analysis by modeling and experimental tests. In addition, we constructed a system to generate notifications and warnings step by step when the load is close to a dangerous load, confirmed the load distribution pattern by position, and established a method to confirm real-time data numerically and graphically. Finally, we evaluated the practical application of the load-monitoring system using field-test data using a wireless load-cell.

1. Introduction

When injecting concrete, only temporary structures need to support the concrete’s own weight and impact load. However, due to deterioration of temporary materials and improper installation, the structure may become unstable, and the concrete casting site may collapse. In addition, even if the safety factor of various temporary structures is taken into consideration at the time of design and the safety factor is reviewed, it is not possible to completely control the load change due to various variables during concrete placement. Sensor-based measurement and monitoring systems are needed at construction sites to detect formwork and structural deformation and prepare for collapse. In the existing construction method, a method of assigning a site manager to perform visual measurement at the time of concrete placement is adopted, but the view is that it is insufficient as a risk countermeasure method for the risk of collapse. Therefore, in this research, we developed wireless sensor load-monitoring technology that can quickly grasp the entire process and construction status and applied it to the site to improve the safety of construction.
Large and small collapse accidents have occurred at construction sites, and casualties are increasing. According to construction accident statistics, accident rates in all industries are declining continuously, but accident rates in the construction industry are on the rise [1].
Referring to Table 1, the number of disasters in the construction industry—which peaked in 2012—seemed to be decreasing, but it showed a trend of increasing year by year [1].
In addition, according to Korea’s construction accident statistics, the accident rate of all industries continues to decrease, as shown in Figure 1, while the accident rate of the construction industry is on the rise. Despite efforts to reduce these accidents, many deaths occur every year [2].
In particular, according to the working-level guidelines published by the Ministry of Employment and Labor, 22.8% (488 out of 2134) died from serious accidents based on scaffolding work over the past five years.
The most common cause of these accidents is the lack of or improper installation of temporary fixtures and system supports. In particular, the result of system-support installation is often different from the original plan due to the lack of manpower of safety managers and cost reduction of construction materials. In addition, compared to permanent facilities, it is judged that the investment and interest in on-site structural safety review, material quality inspection, installation supervision, and worker safety equipment are insufficient [3,4,5,6].
However, the most dangerous thing is that sudden collapse accidents cannot be prevented because there is no intuitive way to know which loads are at risk of collapse.
Therefore, in the initial design and planning stage, all potential dangers should be identified, and preventive measures should be taken. However, the safety planning used in the construction industry has certain shortcomings. Construction safety plans are often carried out separately from the initial planning [7]. Therefore, in many construction projects, safety experts do not actively participate in the creation or revision of the construction plans, and their roles are limited to the inspection of construction sites. The safety analysis of a construction site depends greatly on the manual work of individual safety managers or supervisors in identifying potential safety risks. However, manual safety inspections are generally labor intensive, and thus are prone to errors owing to the complex and changing characteristics of construction projects. Moreover, designers have paid limited attention to safety because they often fail to understand how safety is affected by on-site work [8].
Today, electrical-load transducers are widely used in various fields. The development of this type of transducer began about 40 years ago, when it was limited to load control of 10 tons or more and began to be used as a partially improved mechanical device. After decades of research and problem solving, it was developed until the use of precision transducers with an accuracy of less than 0.02% of maximum load became common.
Previous studies have demonstrated higher safety management through the use of a performance certification system and proper management of the construction materials, as well as construction-site monitoring through the installation of an inclinometer used to control the safety of the support pillars using information technology [9,10,11,12,13]. Other studies have conducted remote measurements through the development of wireless custom load-cells [14,15].
In addition, studies on the safety management of construction sites have also been conducted. The safety information that is generally used at construction sites does not reflect the factors related to the actual work environment; hence, it becomes more difficult to identify potential safety threats and provide the correct information to the right people at the right time [16]. Moreover, about 80% of all accidents occurring at construction sites are caused by dangerous actions of workers, and most deaths are caused by workers falling from high places or being hit by moving objects or construction equipment [17].
Methods for controlling and managing the behaviors of workers in the field, where it is becoming increasingly more difficult to secure the safety of the personnel, have been studied [18,19]. In contrast to such research trends, this study is aimed at promoting the rapid response to an impending collapse using an alarm or alert that does not interfere with the construction by developing a safety system that can be directly installed at a construction site [20,21].
In this study, focusing on the most dangerous accidents that occur at actual construction sites, i.e., collapses, a custom load-cell was developed using Bluetooth, along with a design to combine it with a prefabricated shoring system under rough conditions found at existing construction sites. This study is also aimed at investigating a system that can manage safety and prevent accidents through real-time Bluetooth load-monitoring using a product developed by Buildit, Inc. (Plaistow, NH, USA).

Design Framework

Figure 2 shows the system-support monitoring process. During the preparatory step of step 1, you will review the system support installation drawing and the planned location of the wireless load-cell, and programmatically number the mapping and system support locations. Then, register as an administrator of the monitoring system and enter the site name and its section. The installation step in step 2 installs the onsite Bluetooth AP and surveillance beacon. Check the sensor installation abnormality at the site before placing, and if there is an abnormality, you will need to reinstall the load monitoring. In the monitoring step of step 3, system-support load-monitoring is performed when there is no abnormality in the sensor installation. When an abnormal load is detected, a warning sound is heard at the site, and when the color of the warning light changes from green to yellow to red, the worker interrupts the work and understands the cause. Due to the conservative approach of the gradual load value, even if the warning light turns red, it does not indicate the hypothetical structural collapse, and the operator is instructed to interrupt the work and disperse the load.

2. Methodology

2.1. Load-Cell Principle

A load cell is a transducer that measures physical quantities such as force or load by converting them into electric signals. Objects undergo deformation in proportion to the force or load applied to them, and the amount of deformation per unit length is called strain. Strain is characterized by a linear change in proportion to the force or load applied. Strain measurements are required based on engineering needs, and the sensor developed for such purpose is called a strain gauge. A strain gauge is based on the principle in which the electric resistance of an object depends on the change of its length and cross-sectional area. In other words, load cells convert a physical deformation occurring at the sensing element of the elastic strain member, which generates a structurally stable deformation allowing a force or load to change in terms of electric resistance, and then convert it into a precise electric signal through the configuration of an electric circuit called a Wheatstone bridge [22].

2.2. Strain Gauge-Based Load-Cell

A strain gauge uses the property of a metal or semiconductor that changes its resistance owing to a deformation that occurs when stress is applied. The resistance (R) of a metal conductor is expressed as follows:
R = ρ L A
where ρ is the specific resistance of the resistance wire and A and L are the cross-sectional area and length of the metal conductor, respectively.
For the gauge in a load cell, a wire gauge, a film gauge, or a foil gauge is used. A foil gauge is made of copper and nickel alloy. It is typically fabricated by processing a thin film with a thickness of 5–10 μm and attaching it with polyimide to a base using an adhesive followed by exposure and an etching process. The load cell is fabricated by processing an elastic strain member and attaching four strain gauges to a part where the largest strain occurs to measure the applied load based on a change in strain.
A change in the resistance of the strain gauge is directly related to the strain, according to the following equation:
Δ R R = K × ϵ
where R is the resistance (Ω) before the occurrence of a strain, Δ R is the change in resistance (Ω) when a load is applied, K is a proportional integer (gauge rate of approximately 2), and ϵ is the strain (ΔL/L).
When a force is applied to the load cell, the resistance of the attached gauge is changed. This change in resistance is proportional to the applied force. Because the change in the resistance of the gauge is extremely small, the load cell is generally wired using the Wheatstone bridge circuit shown below.
The Wheatstone bridge shown in Figure 3 is an electric circuit that detects slight changes in resistance. The change in resistance by strain is also converted using this circuit. The Wheatstone bridge is made up of four resistances. The gauges of R 1 through R 4 are attached as shown in the figure, and the output voltage before a load (force) is applied according to the electric flow can be expressed as follows:
V o u t = R 1 R 3 R 2 R 4 R 1 + R 2 R 3 + R 4 V i n
where V o u t is the load-cell output voltage and V i n is the load-cell driving voltage.
When the resistance change occurs as + Δ R 1 , Δ R 2 , + Δ R 3 , and Δ R 4 due to the strain applied to each gauge of the Wheatstone bridge ( R 1 through R 4 ) , the output voltage of the load cell is generated as the following expression:
Δ V o u t = R 1 R 2 R 1 + R 2 2 Δ R 1 R 1 + Δ R 2 R 2 V i n + R 3 R 4 R 3 + R 4 2 Δ R 3 R 3 + Δ R 4 R 4 V i n
where if R 1 = R 2 = R 3 = R 4 = R , we obtain the following:
Δ V o u t = Δ R R V i n
From (2), the following relationship is established: Δ R R = K × ϵ . Hence,
Δ V o u t = K × ϵ × V i n
Equation (6) shows that the output voltage ( V o u t ) is proportional to the strain (ϵ) [23].

2.3. Design of Elastic Strain Member Using ANSYS Simulation Program

As can be seen from the above principle of a load cell, an elastic strain member that generates a structurally stable deformation in response to the applied force or load is required. Thus, to determine a load under the risk of collapse, we selected a compression-type load-cell shape as the basic frame as shown in Figure 4 for the elastic strain member receiving a compressive load.
As mentioned earlier, figures. In Figure 4, only the compressive load region was modeled to determine the safety factor of the elastically deformable member to prevent permanent deformation under a load of 5 tons. The inner diameter of the cylinder is fixed at 34 mm. Equation (7) determines the safety factor required for maximum stress and yield strength. The safety factor was determined by obtaining simulation values through finite element analysis using the ANSYS simulation program as shown in Figure 5 and Table 2. The safety factor can be determined according to the material and load condition [23], this study choose the safety factor as 1.5 due to the material is well-known steel and the load and stress can be easily determined. Therefore, a wall thickness of 5 mm was chosen.
S = Y i e l d   S t r e n g t h M a x   S t r e s s
Here, the yield strength is 250 MPa.

3. Hardware of the System

3.1. Load-Cell Shape

The size of the elastic strain member and the space used to embed the Bluetooth module printed circuit board (PCB) were obtained by referring to Figure 6a. In addition, the part marked in Figure 6b (red box) was raised by 2 mm so that the load of the strain gauge would fully enter the center part. The elastic strain member was fabricated using SS400, which has a similar yield strength to the structural steel applied in the simulation, as shown in Figure 7.
Figure 8 shows the rubber casing designed for waterproofing to prevent deformation by contaminants and external shock. It was designed to be fixed and prevent eccentricity by combining the protruding parts on the top of the rubber casing with the square holes of the Jack base. Furthermore, grooves were made on the inside of the casing for integration with the elastic strain member to prevent abnormalities in the load measurements.

3.2. Fabrication of Bluetooth-Based Wireless Load-Cell Prototype

The Bluetooth-based wireless load-cell shown in Figure 9 is composed of an elastic strain member, a strain gauge, and a PCB. The changes in the load to the load cell make the strain changes in the elastic strain member and the strain gauge, which is attached to the elastic member, measure the change of strain.
In Figure 9, EXC± is a temperature compensation dummy, the voltage difference of which is sensed using SIG±. Because the change in voltage difference by weight is extremely small (approximately 0.007 V), the voltage difference of SIG± is amplified to 600 times the existing value using an AMP and the voltage is delivered to the ADC (14-bit) of the SoC (System on Chip).
As shown in the circuit diagram in Figure 10, the sensing value is delivered from the pressure sensor to the nRF52833 SoC embedded with a Bluetooth function. These sensing data are transmitted through the circuit using a Bluetooth Advertising Packet.
A Bluetooth Advertising Packet has an advantage in that communication at a similar level can be achieved at a much lower power than with a conventional method using the Bluetooth Low Energy (BLE) protocol from Bluetooth 4.0 released in 2010. We selected an Advertising Packet because it can transmit data without Bluetooth pairing and can prolong the battery life.
If you check the full data sheet of NRF52833, we provide 14-bit adc. In addition, the amp that provides 600 times gain is Texas Instruments’ INA333, which is a device that provides Low Quiescent Current: 50 μA, up to 1000 times gain. As an energy breakdown, 10 ms (about 15.9 mA) is used every 200 ms through strain-gauge measurement, NRF52833 ADC, 5 V burst regulating, and AMP power supply. BLE every 200 ms, data advertising (80 μA).
Timer, Interrupt and Pin Control 20 μA, (16 × 0.005) + (0.1 × 0.195) × 5 = consumes approximately 500 μAh AA batteries in parallel connection to approximate””ly 4800 mAh (6000 mAh, but excluding 20% due to discharge rate) 500 μAh × 24 × 365 = 4380 mAh, usable for 1 year.
When extending the battery life, it is possible to extend the test by lowering the measurement voltage of the strain gage being measured to 5 V with the step-up regulator and lowering the measurement time of 5 ms further.
Since the battery is non-replaceable, the battery can last longer without replacement after system installation. When applied, it is theoretically possible to operate with 3 AA batteries, and it is possible to measure once every 2 s and without replacing the batteries for more than a year by setting the communication cycle.
Afterwards, it was found that the transmission range of the antenna for transmitting the internal strain gauge value was short due to the outer wall of the elastically deformable member. In order to prevent the load reception interference of the elastically deformable member, as shown in Figure 11, a drill hole was drilled in the outer wall to install the film antenna, and the waterproof finish was treated with silicone to complete the prototype of the wireless Bluetooth load-cell, as shown in Figure 12.

3.3. Development of IoT AP and Prototype Achieving Bluetooth Signal Reception and LTE Communication

The gateway, which is responsible for receiving Bluetooth signals and conducting LTE communication, refers to the software enabling communication between different types of networks by appropriately converting the different communication protocols.
We apply a wireless BLE TO LTE gateway, which converts the BLE protocol of Bluetooth into MQTT, HTTP, or HTTPS using the parts shown in Figure 13, along with an LTE USIM instead of Wi-Fi and Ethernet.
This makes it possible to supply a higher voltage and battery capacity than a basic 3.7 V AA battery while minimizing the gateway shape. In addition, the portability and communication aspect of the gateway is improved by using the charging function using a lithium-ion battery.
Lithium-ion polymer batteries are lithium-ion secondary batteries that use a polymer-based electrolyte. The explosive electrolyte of a lithium-ion battery has been changed to a solid electrolyte (polymer). Although the ionic conductivity, temperature characteristics, and lifespan are lower than those of liquid electrolytes, they have advantages such as safety, miniaturization, and the possibility of producing desired shapes. Additionally, these batteries can be produced in curved or thin forms for application in mobile devices such as smartphones and laptops. Therefore, we have chosen a lithium-ion polymer battery with high compatibility.
As shown in Figure 14, the condition of the gateway can be checked using three LEDs. The blue LED illuminates during normal operation, and the red LED illuminates when the power supply is defective or when a dangerous error occurs. In addition, the blue LED blinks repeatedly during normal data communication and the red LED illuminates when the data transmission has an error. The red LED also illuminates when the connection to the config prefabricated shoring system monitoring cloud is abnormal, the LTE communication signal is weak, or a USIM recognition error occurs.
Furthermore, a nano USIM was used, which was registered with a telecommunications company in advance after mold injection and outer-shape fabrication. After the USIM was recognized, the communication strength and registration status were checked through the base station, and the status was displayed through the LED indicators. The outer shape was produced by injection through molding. The LED indicator part was laser cut after being painted gray for visibility, and the case was painted white.
In addition, a method for instantly notifying the on-site workers using a buzzer installed at the site was necessary. Thus, as shown in Figure 15, a buzzer was connected to the gateway and the firmware was set to sound the buzzer in the event of danger.

3.4. Experiment on Prototype Performance Using UTM

In order to verify the performance of the prototype and to calibrate a number of additional prototypes, compression experiments were performed using a universal testing machine (UTM) as shown in Figure 16. This experiment compares the value of the output voltage when the load is increased. In this experiment, loads from 0.2 tons to 5 tons were individually applied based on the load of the prefabricated support system.
As shown in Table 3, the initial output voltage varied by device owing to the different overall initial values, and the increased value also varied even when the same compression load was applied.
The data of some parts marked by the red circles in Figure 17 were relatively non-uniform under light loads until 1 ton was applied; however, after 1 ton, the load increased linearly as the load entered the dangerous zone. This indicates a strong influence of buckling owing to the small thickness of the inner diameter.
As a result of this influence, an average accuracy of 0.25% was obtained.
Although there has minor errors over that range (0 to 1 and over 4 tonf), but it can be ignored because the load which acts to the system support is up to 1 tonf and under 4 tonf. So, an additional action was taken because it could be adjusted through firmware calibration.

3.5. Remote Load-Monitoring Program for a Prefabricated Shoring System

The personal server was opened by entering the assigned ID, and the locations where the sensors were installed were marked on the drawing for efficient monitoring. In this manner, the system was developed to enable the overall monitoring on the screen and the storage of massive data that are recorded every second.
Through the prefabricated shoring system load-monitoring program, the designated administrator can collect the data of the Bluetooth wireless load-cell received at the AP. The drawings are uploaded as shown in Figure 18, and the data of each load cell can be displayed in real time on the program by setting the installed locations through a drag and drop, as shown in Figure 19.
The current status, including safety, warning, and danger alerts, can be displayed using the range set as the maximum load of the prefabricated shoring system with the data obtained from structural calculations at the time of the site design. The safety load (1–2 tons) was set to be displayed in green, the warning load (2–3 ton) in orange, and the dangerous load (3–5 tons) in red.
After completing the installation and settings, the required data—including real-time load data, abnormal load alert pushes, and abnormal load alert history—can be displayed on the program.
As shown in Figure 20, when an abnormal situation occurs, the logs are recorded. Because the app push messages of administrators and the logs of the program are stored, the cause can be analyzed in the event of an accident, and immediate responses to dangerous situations are made possible.

4. Final Validation through On-Site Testing

4.1. Modeling Analysis of System Support

Figure 21 details the beam section’s joists, yokes, and system support. In order to secure structural safety when pouring concrete, it is appropriate to calculate the joist, yoke, and system-support interval according to the beam size (1000 × 1500) so that the site safety manager can check the installation interval between the joists, yoke, and system support. As shown in Figure 22, modeling review was conducted for concrete-distributed pouring and concentrated pouring. As shown in Figure 22a, in the case of distributed pouring, concentrated stress does not occur in the system support. As shown in Figure 22b, it was confirmed that the vertical load rises rapidly during concrete pouring, and concentrated stress is generated in the system support, which can lead to the collapse of the temporary facility.
Figure 21 details the beam section’s joists, yokes and system support. In order to se-cure structural safety when pouring concrete, it is appropriate to calculate the joist, yoke, and system support interval according to the beam size (1000 × 1500) so that the site safety manager can check the installation interval between the joists. yoke and system support. As shown in Figure 22, modeling review was conducted for concrete distributed pouring and concentrated pouring. As shown in Figure 22a, in the case of distributed pouring, concentrated stress does not occur in the system support, As shown in Figure 22b, it was confirmed that the vertical load rises rapidly during concrete pouring, and concentrated stress is generated in the system support, which can lead to the collapse of the temporary facility.

4.2. Test Results and Discussion

The field verification of the wireless load measurement monitoring system was applied and evaluated in the field where the system support was used, as shown in Figure 23. In order to observe the load change, concrete was poured on the upper part of the system support and the load change pattern by position was investigated in the installation section. The casting time took about 3 h and 30 min in total.
Since LTE reception was not possible at the underground site, we connected the AP in series with the laptop computer so that the gateway could monitor the signals sent to and received from the Bluetooth beacon. Figure 24 shows the real-time load-monitoring screen.
Figure 25 shows the color change of each device according to the load change as the concrete placement progresses. In each area, after pouring concrete, 3–4 workers will work to fill every corner with a vibrator. During this process, it was confirmed that at the beginning of the first injection, a red mark (dangerous load) appeared on one load cell when workers leaned against and piled up concrete high. However, it was confirmed that the concrete turned yellowish green because the concrete spread evenly around it. (The range of the color stage is set a little conservatively, so just because the red mark is displayed does not mean that it will collapse immediately.)
After the experiment, a large amount of data transmitted from the Bluetooth beacon was graphed using MATLAB as shown in Table 4. As shown in Figure 26, the values on the X-axis represent time and the values on the Y-axis represent the output voltage. As shown in the figure, the amount of change over time in the graph was confirmed by dividing the left (morning) part and the right (afternoon).
In Figure 26, the red box shows the significantly increased range. It can be seen that the output voltage value increases in the order of zone 1, zone 2, and zone 3 according to the injection direction. However, in the case of SS-05, SS-08, and SS-13 in Figure 26, the graph was not displayed properly due to buckling and eccentricity.
Through these field experiments, it was confirmed that when the poured concrete was flattened with a vibrator and a large amount was poured into every corner, the load-cell load value at that location changed and the load value increased or decreased.
The graph in Figure 27 shows that the value of Zone 1, the first concrete injection zone, has increased significantly. Referring to Figure 28, it can be seen that the load is slightly reduced by load balancing by using the vibrator for leveling work with a tightly packed concrete. In the graph in Figure 29, you can see that the load gradually increases as the concrete placement work moves to Zone 2. Figure 30 also shows that the load on the top slab of the column affects the load cells placed around it by casting. The columns between the zones, and the load, will increase slightly compared to the surroundings. The graphs in Figure 31 and Figure 32 show that the load gradually increases as the concrete injection operation moves from Zone 2 to Zone 3.

5. Conclusions

In this study, a Bluetooth load-cell-based safety management support-monitoring system was established. Both hardware and software approaches have been implemented. The remote load-monitoring program intuitively shows the level of danger, and when a dangerous load is detected at the construction site, it immediately sounds a buzzer to help with emergency evacuation. It is meaningful in securing the safety of workers by preventing the repeated and minor collapse accidents of foundation construction. The main tasks of this study are as follows:
  • Developed wirelessly, so that it does not interfere with the construction site, and a custom Bluetooth load-cell has been developed.
  • A load was applied to the prototype with UTM, and an experiment was performed to confirm the operation and to calibrate.
  • In the first UTM experiment, the accuracy was very low with an average value of 0.25%, so to correct this, the firmware of each prototype was modified and the experiment was conducted again to develop the finished product.
  • We developed an AP that can transmit and receive data from the load cell and software that can intuitively view data. The user can control the range of safety, warning, and danger in the system setting and set the position of the product in the form of Drag&Drop according to the drawing.
  • A field experiment with the completed Bluetooth load-cell was conducted in Dongtan, Korea, and the overall data showed validity according to the applied load. However, there was an eccentricity between the load cell and the prefabricated shoring system due to the incorrect location because of the poor conditions of the temporary facility and radio-wave interference caused by temporary iron poles at the site. Moreover, the load-bearing part of the elastic body was thin and prone to buckling. These led to a slight error in the data.
Through this, it has been proven that the monitoring system can be used in the construction field. We will proceed with improving the accuracy by modifying the design of the elastic body so it can be applied to other types of supports in our future research. We hope that it contributes to the opportunity for a safety inspection to realize real-time monitoring by using wireless sensor networks for the Internet of Things era.

Author Contributions

H.K. methodology, data collection and analysis, and manuscript writing; S.P. (Sehwan Park), M.Y., H.S. and S.P. (Soonjeon Park) support, data collection, and experimental support; J.K. methodology, data collection, analysis and experimental support; All authors have read and agreed to the published version of the manuscript.

Funding

This research funded by the National Research Foundation of Korea (NRF) research funding (No. NRF-2020R1C1C1004437), the project titled “De-velopment of Disaster Control and Aging Management Method for Port Infrastruc-ture (20210603)”, funded by the Ministry of Oceans and Fisheries, Korea and R&D program (20017423) funded by Ministry of the Interior and Safety, Korea.

Acknowledgments

This work was conducted with the support of the National Research Foundation of Korea (NRF) research funding (No. NRF-2020R1C1C1004437), the project titled “Development of Disaster Control and Aging Management Method for Port Infrastructure (20210603)”, funded by the Ministry of Oceans and Fisheries, Korea and R&D program (20017423)funded by Ministry of the Interior and Safety, Korea.

Conflicts of Interest

The authors declared no conflict of interest.

References

  1. Large Accident Case Book. Available online: https://www.kosha.or.kr/kosha/data/disasterCasebook_B.do?mode=view&articleNo=420065&article.offset=0&articleLimit=10 (accessed on 9 March 2021).
  2. Park, K.; Im, S.; Kim, S.; Koo, K. A Study on Institutional Improvement for Application of Smart Construction Technology. J. Korea Inst. Constr. Saf. 2020, 3, 9–17. [Google Scholar]
  3. Kang, S.W.; Lee, J.H.; Park, S.H.; Kang, H.R.; Lee, K.S.; Kim, B.J.; Shin, Y.S. Perception Difference Analysis between Manager and Field Worker about the Form work Collapse Accident. J. Korea Acad.-Ind. Coop. Soc. 2021, 22, 179–189. [Google Scholar]
  4. Park, J.Y.; Kim, G.H. Importance Analysis of Major Factors in Formwork Collapse Accident. J. Korea Inst. Build. Constr. 2021, 21, 249–256. [Google Scholar]
  5. Prak, H.P. A Fundamental Study for Analyzing the Cause of Construction-critical Disaster. Proc. Acad. Present. Korean Inst. Archit. 2018, 38, 707. [Google Scholar]
  6. Kim, G.H.; Bu, Y.S. Accident Factors and Improvement Plans for Temporary Equipment Installation. Korea Inst. Constr. Eng. Manag. 2019, 20, 32–37. [Google Scholar]
  7. Bansal, V.K. Application of Geographic Information Systems in Construction Safety Planning. Int. J. Proj. Manag 2011, 29, 66–77. [Google Scholar] [CrossRef]
  8. Zhang, S.; Teizer, J.; Lee, J.-K.; Eastman, C.M.; Venugopal, M. Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules. Autom. Constr. 2013, 29, 183–195. [Google Scholar] [CrossRef]
  9. Jeon, K.D.; Shin, S.J. Proposal for safety management of form-shore structure construction using IT technology. J. Inst. Internet Broadcasting Commun. 2020, 20, 93–99. [Google Scholar]
  10. RezaAhmadi, H.; Mahdavi, N.; Bayat, M. A novel damage identification method based on short time Fourier transform and a new efficient index. Inst. Struct. Eng. IStructE 2021, 33, 3605–3614. [Google Scholar]
  11. Ni, N. Safety Monitoring and Evaluation of Construction Projects Based on Multi-Sensor Fusion. Instrum. Mes. Métrologie 2020, 19, 431–441. [Google Scholar] [CrossRef]
  12. Colak, I.; Garip, I.; Sagiroglu, S.; Bayhan, S. Remote monitoring of the load characteristics of synchronous generators. In Proceedings of the 2011 International Conference on Power Engineering, Energy and Electrical Drives, Malaga, Spain, 11–13 May 2011; pp. 1–4. [Google Scholar]
  13. Awolusi, I.; Nnaji, C.; Marks, E.; Hallowell, M. Enhancing Construction Safety Monitoring through the Application of Internet of Things and Wearable Sensing Devices: A Review. Comput. Civil Eng. 2019, 2019, 530–538. [Google Scholar]
  14. Kim, Y.; Park, J.S.; Oh, B.K.; Cho, T.; Kim, J.M.; Kim, S.H.; Park, H.S. Practical Wire-Less Safety Monitoring System of Long-Span Girders Subjected to Construction Loading a Building Under Construction. Meas. J. Int. Meas. Confed. 2019, 146, 524–536. [Google Scholar] [CrossRef]
  15. Kotta, H.Z.; Rantelobo, K.; Tena, S.; Klau, G. Wireless Sensor Network for Landslide Monitoring in Nusa Tenggara Timur. TELKOMNIKA Indones. J. Electr. Eng 2010, 9, 9–18. [Google Scholar] [CrossRef] [Green Version]
  16. Golparvar-Fard, M.; Peña-Mora, F.; Arboleda, C.A.; Lee, S. Visualization of Construction Progress Monitoring with 4-D Simulation Model Overlaid on Time-Lapsed Photographs. J. Comput. Civ. Eng. 2009, 23, 391–404. [Google Scholar] [CrossRef] [Green Version]
  17. Liu, W.; Meng, Q.; Li, Z.; Hu, X. Applications of Computer Vision in Monitoring the Unsafe Behavior of Construction Workers: Current Status and Challenges. Buildings 2021, 11, 409. [Google Scholar] [CrossRef]
  18. Zhou, Z.; Irizarry, J.; Li, Q. Applying Advanced Technology to Improve Safety Management in the Construction Industry: A Literature Review. Constr. Manag. Econ. 2013, 31, 606–622. [Google Scholar] [CrossRef]
  19. Chung, W.W.S.; Tariq, S.; Mohandes, S.R.; Zayed, T. IoT-Based Application for Construction Site Safety Monitoring. Int. J. Constr. Manag. 2020, 1–17. [Google Scholar] [CrossRef]
  20. Naticchia, B.; Vaccarini, M.; Carbonari, A. A Monitoring System for Real-Time Interference Control on Large Construction Sites. Autom. Constr. 2013, 29, 148–160. [Google Scholar] [CrossRef]
  21. Rahulkrishna, P.; Eshwari, R.; Harsha, N.S.; Hegde, R. Design and Development of Remote Load Monitoring Suitable for Non-Residential Loads Through Wireless Data Transmission. In Proceedings of the 2016 IEEE Distributed Computing, VLSI, Electrical Circuits and Robotics (DISCOVER), Mangalore, India, 13–14 August 2016; pp. 35–40. [Google Scholar]
  22. Van Putten, A.F.P. A constant voltage constant current wheatstone bridge configuration. Sens. Actuators 1988, 13, 103–115. [Google Scholar] [CrossRef]
  23. Iorga, C.; Desrochers, A.; Smeesters, C. Engineering design from a safety perspective. In Proceedings of the Canadian Engineering Education Association (CEEA), Winnipeg, MB, USA, 17–20 June 2021. [Google Scholar] [CrossRef]
Figure 1. Accident rate and number of deaths in construction [2].
Figure 1. Accident rate and number of deaths in construction [2].
Sensors 22 03955 g001
Figure 2. System support monitoring process.
Figure 2. System support monitoring process.
Sensors 22 03955 g002
Figure 3. Wheatstone bridge circuit.
Figure 3. Wheatstone bridge circuit.
Sensors 22 03955 g003
Figure 4. Commercial compression-type load-cells.
Figure 4. Commercial compression-type load-cells.
Sensors 22 03955 g004
Figure 5. Finite element analysis of the ANSYS program.
Figure 5. Finite element analysis of the ANSYS program.
Sensors 22 03955 g005
Figure 6. Scaffolding to which the prototype applies and drawings of the prototype. (a) Design of elastic strain member and Jack base: (bottom of system support/Jack base); (b) design of the elastic strain member.
Figure 6. Scaffolding to which the prototype applies and drawings of the prototype. (a) Design of elastic strain member and Jack base: (bottom of system support/Jack base); (b) design of the elastic strain member.
Sensors 22 03955 g006aSensors 22 03955 g006b
Figure 7. Prototype of elastic strain member.
Figure 7. Prototype of elastic strain member.
Sensors 22 03955 g007
Figure 8. Load cell rubber casing design.
Figure 8. Load cell rubber casing design.
Sensors 22 03955 g008
Figure 9. PCB Design and Circuit and Strain Gauge Attachment Directions(1: Horizontal, 2: Vertical, 3: Horizontal, 4: Vertical).
Figure 9. PCB Design and Circuit and Strain Gauge Attachment Directions(1: Horizontal, 2: Vertical, 3: Horizontal, 4: Vertical).
Sensors 22 03955 g009
Figure 10. PCB design and circuit diagram.
Figure 10. PCB design and circuit diagram.
Sensors 22 03955 g010
Figure 11. Installation of film antenna.
Figure 11. Installation of film antenna.
Sensors 22 03955 g011
Figure 12. Wireless Bluetooth load-cell prototype and rubber casing.
Figure 12. Wireless Bluetooth load-cell prototype and rubber casing.
Sensors 22 03955 g012
Figure 13. Gateway PCB and lithium battery.
Figure 13. Gateway PCB and lithium battery.
Sensors 22 03955 g013
Figure 14. IoT AP prototype with the ability of LTE communication.
Figure 14. IoT AP prototype with the ability of LTE communication.
Sensors 22 03955 g014
Figure 15. Gateway connected with an alert buzzer.
Figure 15. Gateway connected with an alert buzzer.
Sensors 22 03955 g015
Figure 16. Load-cell compressive load experiment using UTM.
Figure 16. Load-cell compressive load experiment using UTM.
Sensors 22 03955 g016
Figure 17. Graph of the data of the compressive load-cell experiment using UTM.
Figure 17. Graph of the data of the compressive load-cell experiment using UTM.
Sensors 22 03955 g017aSensors 22 03955 g017bSensors 22 03955 g017c
Figure 18. Uploading of the construction drawings.
Figure 18. Uploading of the construction drawings.
Sensors 22 03955 g018
Figure 19. Setting the locations of devices using drag and drop.
Figure 19. Setting the locations of devices using drag and drop.
Sensors 22 03955 g019
Figure 20. Monitoring screens (a) Notification push; (b) categorization of notification history; (c) viewing notification history.
Figure 20. Monitoring screens (a) Notification push; (b) categorization of notification history; (c) viewing notification history.
Sensors 22 03955 g020
Figure 21. Slab, beam pouring section detail view. (a) Detailed view of slab-pouring section; (b) detailed view of beam-pouring section.
Figure 21. Slab, beam pouring section detail view. (a) Detailed view of slab-pouring section; (b) detailed view of beam-pouring section.
Sensors 22 03955 g021
Figure 22. Distributed pour and concentrated pour 3D modeling review. (a) Distributed pour-stress state; (b) pour-stress state.
Figure 22. Distributed pour and concentrated pour 3D modeling review. (a) Distributed pour-stress state; (b) pour-stress state.
Sensors 22 03955 g022aSensors 22 03955 g022b
Figure 23. Field application of the Bluetooth load measurement monitoring system.
Figure 23. Field application of the Bluetooth load measurement monitoring system.
Sensors 22 03955 g023
Figure 24. Load-monitoring screen (11:30).
Figure 24. Load-monitoring screen (11:30).
Sensors 22 03955 g024
Figure 25. Load-monitoring screen (15:00).
Figure 25. Load-monitoring screen (15:00).
Sensors 22 03955 g025
Figure 26. Monitoring data graphs for 11:30–15:00.
Figure 26. Monitoring data graphs for 11:30–15:00.
Sensors 22 03955 g026aSensors 22 03955 g026bSensors 22 03955 g026c
Figure 27. Sum of 3D graph values for data from 11:30–12:00.
Figure 27. Sum of 3D graph values for data from 11:30–12:00.
Sensors 22 03955 g027
Figure 28. Sum of 3D graph values for data from 11:40–13:30.
Figure 28. Sum of 3D graph values for data from 11:40–13:30.
Sensors 22 03955 g028
Figure 29. Sum of 3D graph values for data from 12:00–13:30.
Figure 29. Sum of 3D graph values for data from 12:00–13:30.
Sensors 22 03955 g029
Figure 30. Sum of 3D graph values for data from 13:00–14:00.
Figure 30. Sum of 3D graph values for data from 13:00–14:00.
Sensors 22 03955 g030
Figure 31. Sum of 3D graph values for data from 13:30~14:30.
Figure 31. Sum of 3D graph values for data from 13:30~14:30.
Sensors 22 03955 g031
Figure 32. Sum of 3D graph values for data from 14:00~15:00.
Figure 32. Sum of 3D graph values for data from 14:00~15:00.
Sensors 22 03955 g032
Table 1. Major accidents by year.
Table 1. Major accidents by year.
ManufacturingConstruction IndustryService IndustryETC
Total1171883917
2009111522
2010101752
2011122090
2012213061
2013161923
2014111322
201571632
2016141732
201772133
201882040
Table 2. Result of safety factor calculation using ANSYS program.
Table 2. Result of safety factor calculation using ANSYS program.
Wall Thickness (mm)Strain (mm/mm)Stress (MPa)Safety Factor
21.7572 × 10−3351.390.71
31.1205 × 10−3224.101.12
48.7396 × 10−4174.791.43
57.2949 × 10−4145.901.71
65.9500 × 10−4119.002.10
Table 3. Data from compressive load experiment using UTM.
Table 3. Data from compressive load experiment using UTM.
Load Cell0.2 T0.4 T0.6 T0.8 T1 T2 T3 T4 T5 T
SS-019335939394619656992111,24212,64213,97115,219
SS-02134412911350155918223071416352016513
SS-03833908982111713122687407154606887
SS-04437042734257432044875587685782189583
SS-055146518052365430570069277947894210,055
SS-066000596259425983612672568483963710,604
SS-07255631813280339035544745550064077641
SS-08646964256449649367458165968711,26612,863
SS-09535651305087508551055236634172148206
SS-10243925872703305534334992629374768628
SS-118889886788598887910410,42811,75913,05814,364
SS-128187828084338725902710,34411,47812,55213,684
SS-138889671030104011782282338344685525
SS-14665865886533661067958065944210,75012,013
SS-15174717281704168818643116435755846770
SS-16711275348232914371777840943011,1790
SS-17189318861943211222923251438455236670
SS-1882128212828483438507985011,21812,52511,963
SS-19706578008495915974288731993411,18012,424
SS-205987607661336172629875688736990311,073
SS-21140314401461163519193384483262547611
SS-22326933313419362039075288655077328881
SS-23595959345904602561817295868310,24811,911
SS-24168316921723191921583200407848715731
SS-25267026362612265928474060543068088140
SS-26625062256270625564077596892410,29711,686
SS-273058314232343364366355027464936311,176
SS-285557561156365738589672928631992311,140
SS-29360335483495346636314645587371208741
SS-303849386439154033420756017156873110,289
(SS: System Support/unit: outvoltage).
Table 4. Data on remote load-monitoring measurements.
Table 4. Data on remote load-monitoring measurements.
Load Cell11:4012:0012:3013:0013:3014:0014:3015:00
SS-0111731174132717541738173317241715
SS-0210891090142916001665167916861696
SS-0310421043108711081117111511111108
SS-0412671274143419772021202420172003
SS-05709714733764789796803808
SS-0813261330129512321218122912561275
SS-1114161422150815771783180118071810
SS-129719719729811206120612081204
SS-1410671075117812081280134413371335
SS-1685585785184193498910211029
SS-1715291520154116551893222122142206
SS-18837834832834954108810871086
SS-2218921888188518841880202923792583
SS-2318601863186218631872189420602230
SS-24705700687666884111611561153
SS-2511051106110811171121112512131244
SS-2615551560156315611567157816882118
SS-2715421550156115741596164319131922
SS-2813571352134113311327137517071749
SS-3018461842184218551908212123092327
(unit: outvoltage).
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Kim, H.; Park, S.; Yeom, M.; Shim, H.; Park, S.; Kim, J. Bluetooth Load-Cell-Based Support-Monitoring System for Safety Management at a Construction Site. Sensors 2022, 22, 3955. https://0-doi-org.brum.beds.ac.uk/10.3390/s22103955

AMA Style

Kim H, Park S, Yeom M, Shim H, Park S, Kim J. Bluetooth Load-Cell-Based Support-Monitoring System for Safety Management at a Construction Site. Sensors. 2022; 22(10):3955. https://0-doi-org.brum.beds.ac.uk/10.3390/s22103955

Chicago/Turabian Style

Kim, Haksun, Sehwan Park, Minkyo Yeom, Hakbo Shim, Soonjeon Park, and Junkyeong Kim. 2022. "Bluetooth Load-Cell-Based Support-Monitoring System for Safety Management at a Construction Site" Sensors 22, no. 10: 3955. https://0-doi-org.brum.beds.ac.uk/10.3390/s22103955

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.