Next Article in Journal
Strategies for Climate-Smart Forest Management in Austria
Next Article in Special Issue
Instantaneous Cutting Force Variability in Chainsaws
Previous Article in Journal
Influential Actors’ Perceptions of Facilitators and Instruments for Solving Future Forest Land-Use Disputes in Europe
Previous Article in Special Issue
Determining Noise and Vibration Exposure in Conifer Cross-Cutting Operations by Using Li-Ion Batteries and Electric Chainsaws
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Productivity, Costs, and Selected Environmental Impacts of Remote-Controlled Mini Forestry Crawlers

1
Chair of forest operations, Albert-Ludwigs-University Freiburg, Werthmannstraße 6, 79085 Freiburg, Germany
2
UMR SILVA, AgroParisTech/Université de Lorraine/INRA, 14 rue Girardet, 54042 Nancy, France
*
Author to whom correspondence should be addressed.
Submission received: 30 August 2018 / Revised: 17 September 2018 / Accepted: 19 September 2018 / Published: 21 September 2018
(This article belongs to the Special Issue Forest Operations: Planning, Innovation and Sustainability)

Abstract

:
An effective way to reduce off-road traffic in forests is to implement greater distances between skid trails. However, this implies that trees beyond the boom reach of the harvester need to be felled motor manually before being winched to the skid trail, for example using a remote-controlled mini forestry crawler (MFC). They are only a few local studies which have evaluated the performance of such MFCs. The use of MFCs for wood extraction operations in mixed soft- and hardwood stands is presented in this study conducted in Southwestern Germany. The aim of this study was to analyze the productivity, costs, and selected environmental impacts of mini forestry crawlers during winching operations through a time study. Using statistical regression, time consumption was analyzed in order to determine significant explanatory variables. Environmental impacts were evaluated using the life cycle assessment (LCA) methodology with Umberto software. The mean net cycle time was 4.82 min and the net productivity rate was 7.77 m3 by productive machine hour (PMH0). Explanatory variables which significantly affected the net cycle time were the winched volume, the number of trees per load, and winching distance. Environmental analysis showed that inputs of fossil energy were mostly due to diesel and lubricant consumption. Raw materials for machine manufacture and maintenance showed the highest impact in human toxicity potential category. The MFCs showed good environmental performances, but the harvesting system should become more productive in order to be more cost effective.

1. Introduction

The mechanization of wood harvesting operations has become increasingly popular over the last decades in order to satisfy timber demand, to enhance productivity and cost effectiveness, to reduce occupational health and safety risks, and to lessen stand damage [1,2,3]. This mechanization has led to higher off-road traffic levels [3], which may damage forest soils through compaction, rutting, and soil displacement. In order to maintain both stability and productivity of forest stands, disturbances of forest soils by forest operations should be minimized [4].
In the federal state of Baden-Württemberg (BW) located in Southwestern Germany, the state forestry department (Forst BW) supports the reduction of extensive off-road traffic, and therefore, a distance of at least 40 m between parallel skid trails is promoted for areas with sensitive soils or inclinations above 30% [5]. In addition to reducing disturbed areas, such a distance between the skid trails is also in accordance to the German Forest Stewardship Council (FSC)-certification standard 3.0 [6]. In FSC-certified forests, no more than 10% of the area of managed forests should be used as skid trails, a criterion that is met by setting the distance between parallel skid trails to at least 40 m. This may have led to increased skid trail intervals also in private-owned forests. A survey on forest operations in Southwestern BW showed that the distance between skid trails was 40 m, in 83% of the recorded felling operations regardless of the forest ownership [7]. These conditions often lead to motor-manual felling and mechanized winching operations. Remote-controlled mini forestry crawlers (MFCs) (Figure 1) might be a suitable option to support sustainable forest operations.
The advantage of these MFCs is mainly the low weight between 1.4 to 2.8 t which corresponds to a low ground pressure ranging between 0.16 and 0.30 kg/cm2. Moreover, they have a gravity center located at only 60 cm above ground, a high climbing capacity on slopes with an inclination up to 60%, are highly maneuverable and versatile in use, can easily be transported in a car trailer, and have a cost price between €48,000 and 98,000 for an engine ranging from 35 to 65 HP [8,9,10,11,12,13,14,15,16]. Currently, there are at least eight different models available on the market from different brands [11] and foresters as well as operators are seeming to gain interest in this technology.
Over the last years, performance indicators focused on energetic inputs and greenhouse gas (GHG) emissions of forest operations have become a popular evaluation criterion to ensure and enhance the environmental performance of operations. Studies have shown that over 85% of the energy inputs were caused by fuel consumption of machines [17]. Therefore, it is crucial to analyze not only the machine productivity, but also related potential environmental impacts. To the best of our found knowledge, no peer-reviewed publication in English language has yet addressed the productivity, costs, and associated environmental impacts of MFCs.
The change of forest types towards higher proportions of broadleaved trees may increase wood extraction time. Broadleaved species usually exhibit larger branches and more complex crown structures. Consequently, it could be expected that the winching of broadleaved trees would take more time than that of a conifer trees, all other things being considered. Moreover, slope inclination, the distance to the skid trail, and the volume being winched can all be considered as constraints. Consequently, it was hypothesized that they would all negatively affect the time consumption of a winching cycle. More precisely, the objectives of this study were:
  • to carry out a time study in order to gain knowledge on the different work elements and their time consumption and thus to calculate productivity and costs,
  • to estimate by regression the relationships between operational parameters and time consumption, and
  • to evaluate the machine performance in terms of common environmental impacts: global warming potential (GWP), acidification potential (AP), eutrophication potential (EP) and human toxicity potential (HTP).

2. Material and Methods

2.1. Study Sites

This research focused on wood harvesting that included motor-manual felling and winching operations as offered by commercial operators. The study site was located in the federal state of BW (Southwest Germany), more specifically in the region of the lake Constance (47°52′06.9″ N/9°01′01.4″ E), which is between 500 and 600 m above sea level. European beech (Fagus sylvatica L.) was the dominant tree species in the mixed stands with proportions of 53%. In addition to beech, the forests contain mainly Norway spruce (Picea abies H. Karst) with a proportion of 25%, Silver fir (Abies alba Mill.) (3%), Douglas fir (Pseudotsuga menziesii Franco) (6%), Scots pine (Pinus sylvestris L.) (4%), European larch (Larix decidua Mill.) (3%), and different broadleaved species (6%), mostly oaks (Quercus robur L. and Quercus petraea Liebl.), as individuals or smaller groups. The study was carried out between December 2017 and January 2018.
The height and diameter at breast height (DBH) of 34 beech and 18 coniferous trees (16 spruce and 2 silver fir trees) were measured in order to fit a local height-diameter equation. For beech trees, the DBH ranged from 8 to 43 cm, with a mean of 21.2 cm and a standard deviation of 7.5 cm. For conifers, mean DBH was 24.3 cm with a standard deviation of 4.0 cm. The resulting equation was then used to predict the height of all harvested trees. All other broadleaved trees that were not beech (n = 3) were estimated using the equation of beech. Tree volume was estimated using the volume equation provided in Deleuze et al. [18]:
  VTot = f h × c 2 4 π ( 1 1.3 h ) 2  
where VTot is total aboveground tree volume, f is the form factor depending on the tree species, h is the tree height, and c is the circumference at breast height. A form factor of 0.515 was used for beech and 0.496 for conifers [18].

2.2. System Description, Work Organization, and Data Collection

A two-person team felled the trees motor-manually then winched the whole trees to the skid trails using the MFC. Motor-manual felling was done using a chainsaw (i) for the trees beyond the boom reach of the harvester, (ii) for the trees with DBH that exceeded the maximum felling diameter of the harvester head, and (iii) for the broadleaved trees with widespread crown and thick branches which could cause problems during the harvester processing. During winching, the logs were moved from the felling site to the skid trails, where the harvester could process them except for trees with widespread crown and thick branches, which were processed motor manually. Each task was entrusted to one experienced worker: one felled the trees using the chainsaw, while the second operated the MFC. Although the overall production system included both workers as they worked as a pair, the time consumption was recorded for the MFC operator only. After the trees were winched, a harvester felled and processed the trees within the boom reach and processed the bunched trees. Finally, the extraction was done by a forwarder. The wood harvesting system according to the German Center for Forest Work and Technology (KWF) [19] is shown in Figure 2. Besides winching, the MFC was also used to assist with pulling hung-up trees during the felling.
The system boundaries were set to those of the winching operation and the functional unit (FU) used in the analyses was the cubic meter over bark (m3) of fresh wood, as it is the most common FU in forestry [20]. A work cycle consisted of extracting one or more trees in a single winching from the felling site to the skid trails. The following work elements were observed in each work cycle and considered as mandatory: pulling out the cable (pulling), chocking, winching, and unchocking. All other work tasks did not necessarily occur in each cycle and were therefore considered as optional tasks: setting up the machine, travelling and positioning the machine on the skid trail (positioning), chocking again the cable because it was not properly fixed (rechocking), waiting for the felling (feller), consulting the feller (consultation), personal delays, machine delays, cleaning the skid trails, and operating the chainsaw (chainsaw). In some cases, the MFC operator used a second chainsaw, mostly to support the feller. Nevertheless, net productive working time was included as all mandatory tasks as well positioning, rechocking, feller, consultation, cleaning, and chainsaw. The two workers as a system were considered, and therefore the following work elements were considered as productive work time: feller, consultation, chainsaw. Cleaning the skid trail was part of the work order, and as a consequence it was also accounted as productive work time.
All of the work elements were observed during the time study. For the analysis, the optional tasks “feller”, “consultation”, “cleaning” and “chainsaw” were grouped under the label “other work elements”. Likewise, personal and machine delays were grouped under the label “delays”.
Time consumptions were observed for two teams working with the same machine in two felling blocks. The felling blocks were within the same forest district.
Along with the time consumption in 1/100 min, cable pulling/winching distance, number of trees, tree DBH and slope inclination were recorded. Pulling/winching distance was measured using a laser measuring device (DISTO pro, Leica Geosystems AG, Heerbrugg, Switzerland), DBH was measured using a caliper and slope inclination was estimated using a clinometer (PM-5, Suunto, Vantaa, Finland). Slope inclination was categorized into flat ground or slight slopes (≤10%) [21], medium slopes (10–45%) and steep slopes (≥45%) [5]. Pulling direction was downwards and winching was done uphill.
The MFC was constructed by a German manufacturer (F. Müller Fahrzeugbau GmbH & Co KG, Eslohe-Bremke), being powered by a 25 kW diesel engine and weighing 1900 kg for 1750 mm in width and 2400 mm in length. The MFC was driven on the skid trails only and never entered in the stands. It was equipped with a winch having a nominal traction force of 50 kN and a 10 mm-diameter and 70 m-long rope. Moreover, the machine was equipped with a front blade and a second winch at the machine tail as integrated tethering winch. Information about machine characteristics is available from the manufacturer [15].

2.3. Economic Analysis

Machine costs were estimated using the method developed by the European Cooperation in Science and Technology Action FP0902 [22]. The Microsoft Excel-based spreadsheet model was developed by Ackerman et al. [22] to establish a common framework for machine cost calculation in the forest biomass procurement chain. Using this framework, the costs were calculated based on fixed costs, variable costs, and operator costs [22]. Input data (Table 1) were obtained from personal communication with machine user for service life, annual use, insurance costs, repair and maintenance costs [23] and from literature [11,22,24,25]. A salvage value of 10% was recommended by Ackermann et al. [22] as a rule of thumb because there is a lack of studies dealing with salvage values of machines [22]. Labor costs and social charges (non-wage labor costs) are closely related and they were obtained from KWF [24] for German conditions (2016).
Total system costs including harvester and forwarder were calculated with the HeProMo productivity calculation tool from the Swiss Federal Institute for Forest, Snow, and Landscape Research [26]. Harvester and forwarder costs were assumed to be 155 €/h and 95 €/h, respectively. Input parameters for the total system cost analysis were set to DBH 30 cm, 69% broadleaved trees, normal stem form, up to 50% winched timber (to the skid trail), two assortments with a length of 4 m, 250 m forest roads, and 400 m skid trails. For the sake of comparison, a fully mechanized forest operation (i.e., harvester and forwarder in stands with skid trail distance of 20 m) were simulated without winching, but with total skid trail distance of 800 m were assumed.

2.4. Environmental Analysis

The modeling software Umberto (v. 5.6) [27] was used to assess the cumulative energy demand (CED) of fossil energy and selected environmental impacts associated to the manufacture and the use of the MFC. Calculations were conducted in accordance with the methods of life cycle assessment (LCA), which are described in detail in the ISO 14000 [28] series standards [29]. Emission data were obtained from the Ecoinvent database [30] which is implemented into Umberto software. In this study, the environmental impact categories GWP, AP, EP, and HTP were assessed. The GWP is impacted mainly by the emission of greenhouse gases, and was calculated for a time frame of 100 years. The AP indexes nutrient losses in ecosystems, and thus, it stands for the contribution to decrease of the pH value in the environment. Eutrophication originates mainly from nitrogen and phosphorus in sewage outlets and fertilizers. The HTP is an index that reflects the potential harm of a unit of chemical released into the environment. The GWP, AP, EP and HTP are reported in CO2-eq., SO2-eq., PO43−-eq. and 11.4-dichlorobenzene (1.4-DCB)-eq., respectively.
The life cycle inventory was organized in three steps: (i) the raw materials of one MFC, (ii) the energy inputs required for machine manufacture and assembling, and (iii) the machine use (diesel and lubricants consumption).
Data regarding the mass of the different raw materials were obtained in a personal communication from a manufacturer of another type of MFC (Table 2). Most data were obtained in kg excepting the electric cables and hydraulic pipes which were given in m. For electric cables a weight of 0.22 kg/m and a composition of 35% copper to 65% polyvinylchloride (PVC) were assumed. Hydraulic pipes were assumed to have 0.64 kg/m in weight and material composition of 90% rubber to 10% steel. The motor was assumed to be manufactured out of cast iron. For the battery a lead-acid battery composed of 75% secondary lead and 25% polypropylene (PP) was assumed [31]. Crawler tracks are made from rubber and are steel reinforced: the assumption was 75% rubber and 25% steel.
During manufacturing and assembling stages both electric and heat energy are required. As no data were available for MFC the data from Athanassiadis et al. [31], who reported values for the construction of a forwarder, were used. Energy sources required for machine manufacture were assumed to be electricity, oil, coal, natural gas, liquefied petroleum gas (LPG), district heat, and diesel; whereas for machine assembling, electricity, district heat, and diesel were required (Table 3) [31]. A repair factor of 30% was assumed along the entire lifetime [32], as well as the transportation of the machine from the manufacturing to the operator´s place (460 km). Inputs were estimated for the number of hours of use during the present study in relation to the total hours scheduled for the life cycle of the machine. Hydraulic oil consumption was assumed to be 2.8% and engine oil 0.75% of diesel consumption, according to data that are typical for small forwarders in Ireland [29].

2.5. Statistics

Regression analysis was used to estimate the effect of load volume, pulling/winching distance, number of trees, terrain slope, and tree species on the time required to perform a complete work cycle. During preliminary trials, violations of the assumption of normality were observed and consequently, time data were mathematically log-transformed [33], i.e., y = ln(t + 1) where t is the time. The back transformation of log-transformed prediction to the original scale is biased [34], and therefore, the correction factor based on the residual variance and the degrees of freedom provided in Végiard and Ung [35] were used. During the regression analysis, the effect of the team was also considered as a random effect using a mixed-model approach. The reader is referred to Pinheiro and Bates [36] for further details about this approach. The relevance of the random effect was tested through a likelihood ratio test as suggested in Pinheiro and Bates [36] (p. 83).
Moreover, as optional tasks were not done in every cycle, the effect of potential explanatory variables on whether the work element will be conducted within the cycle was tested. This was done using a generalized linear model (glm function in R) for each optional task.

3. Results

3.1. Time Consumption and Productivity

A total of 150.3 m3 or 320 pieces were winched in 241 cycles (Table 4). The average number of pieces per load was 1.3 and mean load volume was 1.6 m3. A total of 1507.37 minutes (min) were recorded. After removing delays caused by the study design and breaks 1377 min were analyzed, which corresponded to the scheduled machine hours (SMHs). Time corresponding to the productive machine hour (PMH0) was 1161 min, resulting in a machine utilization rate of 84%. The overall gross productivity, based on SMHs, led to a productivity rate of 6.55 m3/h. When considering the productive work time (PMH0), the overall net productivity was 7.77 m3/h.
When looking at the net cycle time, the working elements with the highest time consumption were the winching with 1.31 min per cycle (27.2%), followed by the waiting for the feller (14.6%), the pulling (13.0%) and the positioning (11.8%). On average, the total chocking time took 0.70 min per cycle (14.6%), standing for 0.35 min for the first chocking, and 0.35 for the rechocking work elements (Table 5).
A total time of 22.1% was found to correspond to the interaction between the two workers which occurred when: (i) an MFC operator had to wait for the feller, (ii) communication and consultation between them were conducted, and (iii) an MFC operator used a second chainsaw (located in the MFC), and thus took over the work of the chainsaw operator. In the structure of other tasks, which accounted for 26% of the net cycle time, 55.7% of the time was spent for waiting for the feller, 26.2% for consulting with the feller, 11.8% for handling a chainsaw, and 6.3% for cleaning the skid trails from branches.
The statistical analysis showed that the likelihood ratio test was non-significant (p = 0.4943), indicating that either the team random effect was nonexistent or the sample size was too small to estimate the variance of this random effect. Consequently, the data from both teams were analyzed without distinction and the linear model was selected (Equation (2)) to predict winching cycle time. In the final model, the statistically significant explanatory variables were the winched volume (V), the number of trees in the load (N°), and winching distance (Dist). Tree species and slope inclination were not found to be significant with p-values of 0.057 and 0.273, respectively. The regression which showed a R2 = 0.39 is presented in Equation (2).
y = e 0.921 + 0.218 × V + 0.018 × Dist + 0.185 × N ° + 0.399 2 2 + 1
where y is time consumption in min, V is winched volume, Dist is pulling/winching distance and N° is number of trees winched. Note that the factor 0.3992/2 is actually the correction factor for the back transformation.
When including delays up to 15 min in the productive work time, which is a common practice in most central European countries to describe system performance [37], PMH15 had a cycle time of 5.35 min and an output of 6.99 m3/PMH15. Looking more specifically into the delays, 67.7% of the interruptions were caused by personal delays, and 32.3% by machine delays. Mean delay time per cycle was 0.34 ± 1.33 which represents 6.4% of total PMH15 cycle time.
For the optional tasks, significant effects were only found in the work tasks of rechocking and delays. For rechocking, the number of trees per load as well as the winching distance significantly (p < 0.005) increased the occurrence of rechocking. Winching distance significantly (p < 0.005) increased the occurrence of a delay during the cycle.

3.2. Costs

According to the COST Action FP0902 model for calculation of forest operation costs [22], net costs (excluding profit margin) for the two-person-team for felling and winching to the skid trail was estimated at 99.43 €/PMH0 for an expected working life span of 8000 h. That resulted in 12.80 €/m3 for PMH0 (7.77 m3/h), split into fixed costs (1.12 €/m3), variable costs (2.48 €/m3), and operators costs (9.20 €/m3).
According to HeProMo calculations, the total system costs per PMH15 was 30.31 €/m3 divided in costs for winching (13.93 €/m3), harvesting and processing (8.58 €/m3), and forwarding (7.80 €/m3). Compared to a conventional system with 20 m-distances between skid trails, the system was 7.70 €/m3 more expensive. In the conventional system (harvester-forwarder) costs were 10.90 €/m3 for the harvester and 11.71 €/m3 for the forwarder.

3.3. Energy Consumption and Environmental Impacts

The consumption of fossil energy was estimated at 15.8 MJ/m3. The CED in the life cycle of an MFC are mainly due to the consumption of diesel (74.5%) and lubricants (3.9%) during the machine use. The production of the machine´s raw materials represented 6.4% and the energy for machine manufacture and maintenance 10.4% of CED.
Potential environmental impacts in respected categories were evaluated at 0.321 kg CO2-eq./m3 in GWP100, 1.64 × 10−3 kg SO2-eq./m3 in AP, 6.31 × 10−4 kg PO4-eq./m3 in EP and 0.201 kg 1.4-DCB-eq./m3 in the HTP. Diesel consumption during machine use was the most impacting in both categories GWP (with 40.7%) and AP (with 61.8%), whereas in the HTP steel was the most impacting (64.4%) and in EP electricity (41.7%) (Figure 3).
When looking at GWP (Figure 4), the most impacting factor was the diesel consumption for machine use (40.7%), followed by electricity (20.6%) and district heat (11.5%) input during machine manufacture, assembling, and maintenance.
The combined impact of steel, electricity, and diesel consumption during machine use accounted for 72.0%, 75.8%, 81.4%, and 85.6% in GWP, AP, EP, and HTP, respectively.

4. Discussion

4.1. Time Consumption and Productivity

In this study, two different teams in two felling blocks were monitored in order to estimate the productivity, the energy input, and selected environmental impacts of winching operations with an MFC. No significant random effect on the team in terms of time consumption were found in this study. Either this random effect was non-existent or the sample size was too small to estimate its variance. However, this could also be due to the fact that both teams were skilled.
The explanatory variables VTot, number of trees and winching distance were found to have a significant effect on the duration of the cycle time. These results were in accordance with those of previous studies [38,39]. It means that productivity is negatively impacted by the winching distance. On the contrary, increasing the volume (either due to size of the tree or by increasing the number of stems) resulted in growth of productivity. Nevertheless, load is limited by the weight of MFC (1900 kg) and the nominal traction force of the winch (50 kN). The effect on productivity was completely in line with the so-called “piece-volume-law”, which states that increasing piece size typically results in increased production and which is described by different authors [40,41].
Tree species had no significant effect on winching time consumption with MFC. This finding is in accordance with those from simulations in the USA where skidding time was not affected by the species mix [38] even if the management was different from that of this study. Nevertheless, hardwood trees often exhibit complex and variable crown architectures [42] and wood density of beech is higher than wood density of spruce [43]. Due to tree form and wood density, an effect of tree species on time and productivity was expected. According to a German survey, forest machine operators think hardwoods negatively impact productivity [7]. However, it must be stressed that the p-value was 0.057, and thus, if increasing sample size it is probable that tree species would have an effect. Especially when adding data from older stands with greater DBHs and volume per tree, a tree species effect may occur as wider crowns develop, resulting in higher masses to be moved for broadleaved trees. Indeed, it could be difficult to separate the effect of tree species because of the small volumes winched. Further investigations and, in particular for final felling operations, would be helpful to complement the productivity model, in order to reach higher variability of the volumes.
The second explanatory variable which was not significant in the survey was the slope inclination. It is likely due to winching direction and slope gradient affect time consumption in the case of manual cable pulling [44]. Nevertheless, the analysis showed significant explanatory variables and interesting findings for optional tasks. As the times spent for waiting the feller or for consulting with the feller were roughly 20% of the total cycle time, increasing the productivity seems to be feasible with a better time management. However, pulling out a steel cable is a highly physical work [45], and the waiting time gives the opportunity to rest for the MFC operator. Productivity increment could also be achieved by finding ways to exclude the occurrence of rechocking operations. The number of trees loaded and the winching distance increased the occurrence of rechocking. To this end, a better positioning of the MFC could reduce the number of obstacles (stumps, trees, rocks) along the winching path, which were the reasons for rechocking. Other observed reason of rechocking was that the hook was not properly fixed and slided off the stems, which mainly occurred when the load contained more than one tree. An option to overcome this could be to equip the cable with two chockers.
The productivity results of the present study were compared to data reported by previous observations. The only data on productivity of MFC were described by ForstBW during the KWF-Tagung in Roding, Germany (2016). Mean productivity was 14.5 m3/h with values ranging from 7.0 to 21.4 m3/h [9], and it was probably related to a different stand structure and silvicultural treatment as the mean DBH was 30 cm and the mean volume per tree was of 1.0 m3.
Another German study compared bunching productivity of horses and tractors. Among its findings, the productivity was estimated at 5.02 m3/h compared to 6.24 m3/h for tractors in conditions of a payload of 0.34 m3 and a distance up to 16 m [46], being lower than the reported herein. Zečić et al. [47] reported a productivity rate of 21.59 m3/day for skidding uphill with a tractor with mean loads of 0.76 m3 over a distance of 25 m in thinning beech stands. In addition to winching, the authors also recorded driving the loaded tractor (C Holder 870 F) to the landing site and the driving of the unloaded tractor along the skid trails which could explain the differences. Moreover, unsettled weather conditions with rain and snow hampered the tractor. Other productivity studies [39,48,49,50,51,52] reporting on wood extraction operations are not comparable with this study as (i) longer skidding and extraction distances were reported, (ii) the operation included loaded travel on skid trails to landing site, and (iii) landing operations were mostly performed. Another study separated the winching operation from the extraction so that productivities of winching were reported. For example, for a broadleaved mixed stand in Romania, a net production rate of 25.31 m3/h was reported for winching 9 m [39]. This high value is hardly comparable with a study like this on MFCs for different reasons: (i) less or no waiting time was observed because after the winching operation the skidder immediately extracted the timber to the landing site; (ii) there were higher load volumes, and (iii) winching was completed on shorter distances.

4.2. Costs

Operator costs (9.20 €/m3) largely exceed fixed (1.12 €/m3) and variable (2.48 €/m3) costs. These high operator costs are due to high social charges in Germany and because both forestry workers were considered (the feller and the MFC operator). The study from ForstBW (2016) about MFC estimated mean net costs for winching with a two-person team to be 6.29 €/m3 with values ranging from 4.52 to 13.83 €/m3 [9], compared to 12.80 €/m3 in this study. The difference in costs was probably related to a different stand structure and management (e.g., final felling).
Total system costs were evaluated at 30.31 €/m3 compared to 22.26 €/m3 for a conventional harvester-forwarder system. To the best of author’s knowledge, system costs of 30.31 €/m3 are still cost-covering, and thus economically feasible. But, as a consequence, profit margins will be lowered. The forest owner needs to tradeoff between lower off-road traffic area and a higher profit margins, unless production costs decrease or monetary compensations are paid out. The application of a multi-criteria analysis, which has been richly taken up as a decision-support tool in forest management planning and practice, might help to compare alternative management operations on a cumulative preference scale [53].
The differences between the costs of timber harvesting system with MFC and the conventional one can be mainly explained by increased man power for the system with MFC. Nevertheless, harvester and forwarder costs are higher in the conventional system: 8.58 to 10.90 €/m3 and 7.80 to 11.71 €/m3, respectively.
Winching and bunching felled trees next to the skid trail may increase the productivity of harvesters and forwarders. A higher productivity of forwarders was also observed by Mederski et al. [54,55] when bigger piles of wood were created next to the skid trails. Further research on winching should compare following whole timber harvesting systems: the one-harvester-pass and the two-harvester-pass systems as described by Mederski et al. [54,55] with lateral winching.

4.3. Environmental Impacts

Most of the forest-related LCA studies are based on direct process energy inputs and neglect the upstream processes related for instance to machine manufacturing [56]. Nevertheless few studies focused on manufacture of forest machines. The findings of this study are in line with other findings which report that highest environmental impacts are caused by the use of the machine, mainly due to the consumption of fossil fuels, lubricants and hydraulic oils [29,57].
Fossil energy inputs were 15.8 MJ/m3 which are comparable to other studies. For the fully mechanized system “harvester-forwarder”, Athanassiadis [58] reported inputs of 82 MJ/m3. Other studies reported values of 52.7 MJ/m3 for a forwarder [29], 59.72 MJ/m3 for a forestry fitted tractor or 17.5 to 31.9 MJ/m3 for chainsaw work [17]. The estimates of this study are smaller as machine diesel consumption is lower than forwarder diesel consumption (e.g., 0.57 L/m3 [59]) and diesel consumption during machine use is the most impacting regarding fossil energy input.
The LCA showed that potential environmental impacts were quite low for all studied impact categories. Although GWP is one of the most discussed and analyzed impact category, the comparison between studies is often difficult [20]. GWP of MFC for the winching operation to skid trail was 0.321 kg CO2-eq./m3. As a comparison, in a review, Klein et al. [20], estimated a mean GWP for the whole timber harvesting from site preparation to forest road at 14.3 kg CO2-eq./m3. For Bavaria (south east Germany) more detailed results showed that biomass felling emitted 3.0 kg CO2-eq./m3 and biomass forwarding 2.0 kg CO2-eq./m3 [60]. The differences are likely due to the lighter machine which consumed less diesel and lubricants than a forwarder. Another study evaluated GHG emissions from fuel consumption in forest operations. For forest with a “close-to-nature” management, mean emissions were estimated at 0.62 and 6.64 kg CO2-eq./m3 for semi-mechanized and fully-mechanized systems [61], these estimates being in line with the results of this research.
Further research should include the whole timber supply chain, including the chainsaw, harvester and forwarder. Carbon storage in trees should also be included as more productive forest area is available when skid trail distances are wider.

5. Conclusions

Productivity of winching was affected by volume, number of trees and distance whereas tree species and slope were found to be non-significant. The analysis showed that the use of MFC was a suitable option for winching in terms of time consumption. Nevertheless, when considering the whole system (i.e., harvester processing and forwarder included), overall costs increase. Within the given circumstances (distances between skid trails, volume per tree, etc.) the system costs might be acceptable in a German context, especially for high profit timber assortments. The environmental analysis indicated reduced environmental impacts and energy inputs with low fuel and lubricant consumption on different impact categories.
Winching the tree to the skid trail with an MFC may lead to increased productivity of harvester and forwarder due to higher timber concentrations next to the skid road as the distance between them was enlarged. As a result, lower environmental impacts could be expected since the environmental impacts of harvester and forwarder are high compared to those of the MFC. Moreover, wide skid trail intervals offer extra forest area which could be used for biomass production, and thus, act as a carbon sink.
Further field work and research on MFC, especially considering the whole wood supply chain, may highlight how to improve the sustainability of such harvesting systems. To this end, comparing timber harvesting systems with skid trail distances of 20 and 40 m should include carbon storage in biomass and revenue from timber. Only then a thorough comparison of costs and environmental impacts between forest operations in stands with larger distance between skid trails (and lateral winching) and a fully mechanized system could be achieved.

Author Contributions

F.B., J.S., and C.S. conceived, designed and performed the experiments; F.B., J.S., and M.F. analyzed the data; F.B. and J.S. wrote the paper with contributions from M.F.

Funding

This study was undertaken in the framework of the project “SOLVE” (Timber harvesting and transportation systems adapted to altered forest structures due to climate change), which is funded by the Federal Ministry of Food and Agriculture (BMEL) and the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) in the frame of the “Förderrichtlinie Waldklimafond” (Förderkennzeichen 28W-B-3-048-01). J.S. is supported by the European Social Fund and by the Ministry of Science, Research and Arts Baden-Württemberg. The article processing charge was funded by the German Research Foundation (DFG) and the University of Freiburg through the funding program Open Access Publishing.

Acknowledgments

We acknowledge ForstBW (in particular the Maschinenbetrieb Schrofel and Rainer Mohrlok); Peter Forstbetrieb und Transporte; as well as Fernando Rossi and Uwe Uhlich for supporting the data collection.

Conflicts of Interest

“The authors declare no conflict of interest” and “The funders had no role in the design of the study; in the collection, analyses, or interpretation of data; in the writing of the manuscript, and in the decision to publish the results”.

References

  1. Cambi, M.; Certini, G.; Neri, F.; Marchi, E. The impact of heavy traffic on forest soils: A review. For. Ecol. Manag. 2015, 338, 124–138. [Google Scholar] [CrossRef] [Green Version]
  2. Enache, A.; Kühmaier, M.; Visser, R.; Stampfer, K. Forestry operations in the European mountains: A study of current practices and efficiency gaps. Scand. J. For. Res. 2016, 31, 412–427. [Google Scholar] [CrossRef]
  3. Goutal, N.; Renault, P.; Cousin, I.; Bonnaud, P.; Gelhaye, D.; Nourisson, G.; Ranger, J. Impact of forest soil compaction on soil atmosphere composition. In Proceedings of the 19th World Congress of Soil Science, Soil Solutions for a Changing World, Brisbane, Australia, 1–6 August 2010; pp. 63–66. [Google Scholar]
  4. Labelle, E.R.; Jaeger, D. Soil Compaction Caused by Cut-to-Length Forest Operations and Possible Short-Term Natural Rehabilitation of Soil Density. Soil Sci. Soc. Am. J. 2011, 75, 2314. [Google Scholar] [CrossRef] [Green Version]
  5. FVA-BW. Richtlinie zur Feinerschliessung; Forstliche Versuchs- und Forschungsanstalt Baden-Württemberg: Freiburg, Germany, 2003. [Google Scholar]
  6. FSC. Deutscher FSC-Standard. Version 3-0; FSC Deutschland: Freiburg, Germany, 2018. [Google Scholar]
  7. Wippel, B.; Kastenholz, E.; Bacher-Winterhalter, M.; Storz, S.; Ebertsch, J. Praxisnahe Anhaltswerte für die mechanisierte Holzernte: Abschlussbericht. Available online: http://www.cluster-forstholz-bw.de/fileadmin/cluster/cluster_pdf/2015-10-20%20Bericht%20Praxisnahe%20Anhaltswerte.pdf (accessed on 23 February 2017).
  8. Tschannen, W. Der 1-Maschinen-Forstunternehmer. Wald und Holz 2013, 8, 51–53. [Google Scholar]
  9. Forst, B.W. Forstlicher Maschinenbetrieb St. Peter. Vorkenzentration der Vollbäume mit Vorrückeraupe an der Seiltrasse: Holzbringung mit Gebirgsharvester; Einsatz des Endmastbaggers. In Tagungsführer zur 17. KWF-Tagung 2016 Roding/Bayern; Kuratorium für Waldarbeit und Forsttechnik e.V., Allgemeine Forst Zeitschfrift: Groß-Umstadt, Germany, 2016; pp. 102–107. [Google Scholar]
  10. Hartkopf, A. Ein Helfer für viele Gelegenheiten: KRUMA 3.0. Forst & Technik 2016, 28, 68–71. [Google Scholar]
  11. Hartkopf, A. Welche Forstraupe für welche Arbeit? Forst & Technik 2016, 8, 22–25. [Google Scholar]
  12. Waas, S.; Wolf, M.; Schuster, S. KWF-Tagung überzeugt mit innovativer Technik: Weltgrößßte Forstdemo-Messe bioetet Einblicke in die Praxis. LWF Aktuell 2016, 4, 52–55. [Google Scholar]
  13. Aggeler, AG. Forstraupe A2100. Available online: http://www.unusuallocomotion.com/medias/files/forstraupe-a2100.pdf (accessed on 21 September 2018).
  14. Christian Achter Forstmaschinen. Rückeraupe KRUMA 3.0: für den Profi im Forst. Available online: https://www.rueckeraupe.de/datenblatt/ (accessed on 5 March 2018).
  15. F. Müller Fahrzeugbau GmbH & Co KG. Rückeraupe MRR. Available online: http://www.mueller-forsttechnik.de/upload/6___Rueckeraupe_MRR1104_276.pdf (accessed on 5 March 2018).
  16. Wicki Forst, AG. Wicki Forst Raupe 50.6A. Available online: http://www.wickiforst.ch/_v1/pdf/Forst%20Raupe.pdf (accessed on 5 March 2018).
  17. Pandur, Z.; Šušnjar, M.; Zorić, M.; Nevečerel, H.; Horvat, D. Energy Return on Investment (EROI) of Different Wood Products. In Precious Forests: Precious Earth; Zlatić, M., Ed.; InTech: London, UK, 2015. [Google Scholar] [Green Version]
  18. Deleuze, C.; Morneau, F.; Renaud, J.P.; Vivien, Y.; Rivoire, M.; Santenoise, P.; Longuetaud, F.; Mothe, F.; Hervé, J.C.; Vallet, P. Estimer le volume total d’un arbre, quelles que soient l’essence, la taille, la sylviculture, la station. RDV Tech. ONF 2014, 44, 22–32. [Google Scholar]
  19. KWF. Funktiogrammmatrix: Microsoft Powerpoint Datei “Funktiogrammvorlagen” zum Download. Available online: https://www.kwf-online.de/index.php/forschungsprojekte/replan/306-funktiogramme-erstellen (accessed on 21 September 2018).
  20. Klein, D.; Wolf, C.; Schulz, C.; Weber-Blaschke, G. 20 years of life cycle assessment (LCA) in the forestry sector: State of the art and a methodical proposal for the LCA of forest production. Int. J. Life Cycle Assess. 2015, 20, 556–575. [Google Scholar] [CrossRef]
  21. Berg, S. Terrain Classification System for Forestry Work; Forestry Research Institute of Sweden: Uppsala, Sweden, 1992. [Google Scholar]
  22. Ackerman, P.; Belbo, H.; Eliasson, L.; de Jong, A.; Lazdins, A.; Lyons, J. The COST model for calculation of forest operations costs. Int. J. For. Eng. 2014, 25, 75–81. [Google Scholar] [CrossRef]
  23. ForstBW; Daten Raupe, Freiburg, Germany. Personal communication, 2018.
  24. Forbrig, A.; Steinfath, M. Tagungsführer zur 17. KWF-Tagung 2016 Roding/Bayern; Kuratorium für Waldarbeit und Forsttechnik e.V. (KWF e.V.); AFZ-DerWald: Groß-Umstadt, Germany; Stuttgart, Germany, 2016. [Google Scholar]
  25. KWF. Fäll- und Rückeraupe Pfanzelt Moritz Fr50 mit Eintrommelwinde; Prüfbericht KWF-Püf Nr.: 7718: Groß-Umstadt, Germany, 2018. [Google Scholar]
  26. HeProMo. Eidgenössische Forschungsanstalt WSL: Birmensdorf, Switzerland, 2016. Available online: https://www.wsl.ch/de/services-und-produkte/software-websites-und-apps/hepromo.html#tabelement1-tab1 (accessed on 21 September 2018).
  27. Umberto; Institut für Umweltinformatik: Hamburg, Germany, 2011.
  28. ISO 14040. Environmental Management—Life Cycle Assessment—Principles and framwork; British Standards Institution: London, UK, 2006. [Google Scholar]
  29. Klvač, R.; Ward, S.; Owende, P.M.O.; Lyons, J. Energy Audit of Wood Harvesting Systems. Scand. J. For. Res. 2003, 18, 176–183. [Google Scholar] [CrossRef]
  30. Ecoinvent. Swiss Center for Life Cycle Inventories: St. Gallen, Switzerland, 2010. Available online: http://www.ecoinvent.org/ (accessed on 1 October 2014).
  31. Athanassiadis, D.; Lidestav, G.; Nordfjell, T. Energy use and emissions due to the manufacture of a forwarder. Resour. Conserv. Recycl. 2002, 34, 149–160. [Google Scholar] [CrossRef]
  32. Knechtle, N. Materialprofile von Holzerntesystemen—Analyse ausgewählter Beispiele als Grundlage für ein forsttechnisches Ökoinventar; Diplomarbeit, ETH Zürich: Zürich, Switzerland, 1997. [Google Scholar]
  33. Ekwaru, J.P.; Veugelers, P.J. The Overlooked Importance of Constants Added in Log Transformation of Independent Variables with Zero Values: A Proposed Approach for Determining an Optimal Constant. Stat. Biopharm. Res. 2017, 10, 26–29. [Google Scholar] [CrossRef]
  34. Duan, N. Smearing Estimate: A Nonparametric Retransformation Method. J. Am. Stat. Assoc. 1983, 78, 605–610. [Google Scholar] [CrossRef]
  35. Végiard, S.; Ung, C.-H. Statistical inference problems related to the logarithmic transformation in regression; another method for interval estimation. Can. J. For. Res. 1993, 23, 871–872. [Google Scholar] [CrossRef]
  36. Pinheiro, J.C.; Bates, D.M. Mixed-Effects Models in S and S-PLUS; Springer: New York, NY, USA, 2001. [Google Scholar]
  37. Spinelli, R.; Visser, R. Analyzing and Estimating Delays in Harvester Operations. Int. J. For. Eng. 2008, 19, 36–41. [Google Scholar] [CrossRef]
  38. Hiesl, P.; Waring, T.M.; Benjamin, J.G. The effect of hardwood component on grapple skidder and stroke delimber idle time and productivity—An agent based model. Comput. Electron. Agric. 2015, 118, 270–280. [Google Scholar] [CrossRef]
  39. Borz, S.A.; Ignea, G.; Popa, B.; Spârchez, G.; Iordache, E. Estimating Time Consumption and Productivity of Roundwood Skidding in Group Shelterwood System—A Case Study in a Broadleaved Mixed Stand Located in Reduced Accessibility Conditions. Croat. J. For. Eng. 2015, 36, 137–146. [Google Scholar]
  40. Ghaffariyan, M.R. Review of European biomass harvesting technologies. Silva Balc. 2010, 11, 5–20. [Google Scholar]
  41. Heinimann, H.R. Forest operations engineering and management—The ways behind and ahead of a scientific discipline. Croat. J. For. Eng. 2007, 28, 107–121. [Google Scholar]
  42. Labelle, E.R.; Soucy, M.; Cyr, A.; Pelletier, G. Effect of Tree Form on the Productivity of a Cut-to-Length Harvester in a Hardwood Dominated Stand. Croat. J. For. Eng. 2016, 37, 175–183. [Google Scholar]
  43. Dietz, P. Dichte und Rindengehalt von Industrieholz. Holz als Roh- und Werkstoff 1975, 33, 135–141. [Google Scholar] [CrossRef]
  44. Borz, S.A.; Ignea, G.; Popa, B. Modelling and comparing timber winching performance in windthrow and uniform selective cuttings for two Romanian skidders. J. For. Res. 2014, 19, 473–482. [Google Scholar] [CrossRef]
  45. Pandur, Z.; Horvat, D.; Šušnjar, M.; Zorić, M.; Hat, Z. Forces Required for Pulling Out a Winch Steel Cable and Physical Load of Chocker-Man. In Proceedings of the 45th International Symposium on Forestry Mechanisation: “Forest engineering: Concern, Knowledge and Accountability in Today’s Environment’’, Dubrovnik, Croatia, 8–12 October 2012. [Google Scholar]
  46. Wirth, J.; Wolff, D. Vergleich von Pferde- und Seilschleppereinsatz beim Vorliefern von Vollbäumen. AFZ DerWald 2008, 63, 968–971. [Google Scholar]
  47. Zečić, Ž.; Krpan, A.P.B.; Vukušić, S. Productivity of C Holder 870 F tractor with double drum winch Igland 4002 in thinning beech stands. Croat. J. For. Eng. 2005, 26, 49–57. [Google Scholar]
  48. Spinelli, R.; Magagnotti, N.; Laina Relaño, R. An alternative skidding technology to the current use of crawler tractors in Alpine logging operations. J. Clean. Prod. 2012, 31, 73–79. [Google Scholar] [CrossRef]
  49. Vusić, D.; Šušnjar, M.; Marchi, E.; Spina, R.; Zečić, Ž.; Picchio, R. Skidding operations in thinning and shelterwood cut of mixed stands – Work productivity, energy inputs and emissions. Ecol. Eng. 2013, 61, 216–223. [Google Scholar] [CrossRef]
  50. Proto, A.R.; Macrì, G.; Visser, R.; Russo, D.; Zimbalatti, G. Comparison of Timber Extraction Productivity between Winch and Grapple Skidding: A Case Study in Southern Italian Forests. Forests 2018, 9, 61. [Google Scholar] [CrossRef]
  51. Magagnotti, N.; Spinelli, R. Integrating Animal and Mechanical operations in protected Areas. Croat. J. For. Eng. 2011, 32, 489–499. [Google Scholar]
  52. Mousavi, R. Time consumption, productivity, and cost analysis of skidding in the Hyrcanian forest in Iran. J. For. Res. 2012, 23, 691–697. [Google Scholar] [CrossRef]
  53. Ghaffariyan, M.R.; Brown, M. Selecting the efficient harvesting method using multiple-criteria analysis: A case study in south-west Western Australia. J. For. Sci. 2013, 59, 479–486. [Google Scholar] [CrossRef] [Green Version]
  54. Mederski, P.S.; Venanzi, R.; Bembenek, M.; Karaszewski, Z.; Rosińska, M.; Pilarek, Z.; Luchenti, I.; Surus, M. Designing Thinning Operations in 2nd Age Class Pine Stands—Economic and Environmental Implications. Forests 2018, 9, 335. [Google Scholar] [CrossRef]
  55. Mederski, P.S. A comparison of harvesting productivity and costs in thinning operations with and without midfield. For. Ecol. Manag. 2006, 224, 286–296. [Google Scholar] [CrossRef]
  56. Heinimann, H.R. Life Cycle Assessment (LCA) in Forestry: State and Perspective. Croat. J. For. Eng. 2012, 33, 357–372. [Google Scholar]
  57. Engel, A.-M.; Wegener, J.; Lange, M. Greenhouse gas emissions of two mechanised wood harvesting methods in comparison with the use of draft horses for logging. Eur. J. For. Res. 2012, 131, 1139–1149. [Google Scholar] [CrossRef]
  58. Athanassiadis, D. Energy consumption and exhaust emissions in mechanized timber harvesting operations in Sweden. Sci. Total Environ. 2000, 255, 135–143. [Google Scholar] [CrossRef]
  59. Lijewski, P.; Merkisz, J.; Fuć, P.; Ziółkowski, A.; Rymaniak, Ł.; Kusiak, W. Fuel consumption and exhaust emissions in the process of mechanized timber extraction and transport. Eur. J. For. Res. 2017, 136, 153–160. [Google Scholar] [CrossRef]
  60. Klein, D.; Wolf, C.; Schulz, C.; Weber-Blaschke, G. Environmental impacts of various biomass supply chains for the provision of raw wood in Bavaria, Germany, with focus on climate change. Sci. Total Environ. 2016, 539, 45–60. [Google Scholar] [CrossRef] [PubMed]
  61. Cosola, G.; Grigolato, S.; Ackerman, P.; Monterotti, S.; Cavalli, R. Carbon Footprint of Forest Operations under Different Management Regimes. Croat. J. For. Eng. 2016, 37, 201–217. [Google Scholar]
Figure 1. Remote-controlled mini forestry crawler (MFC) tested in this study.
Figure 1. Remote-controlled mini forestry crawler (MFC) tested in this study.
Forests 09 00591 g001
Figure 2. Representation of the wood harvesting and extraction operation.
Figure 2. Representation of the wood harvesting and extraction operation.
Forests 09 00591 g002
Figure 3. Potential environmental impacts in the categories human toxicity (HTP), eutrophication (EP), acidification (AP) and global warming (GWP), and divided in (i) maintenance and machine use (in green), (ii) energy consumption for machine manufacture (in red), and (iii) materials for machine manufacture and maintenance (in blue), in %.
Figure 3. Potential environmental impacts in the categories human toxicity (HTP), eutrophication (EP), acidification (AP) and global warming (GWP), and divided in (i) maintenance and machine use (in green), (ii) energy consumption for machine manufacture (in red), and (iii) materials for machine manufacture and maintenance (in blue), in %.
Forests 09 00591 g003
Figure 4. Global warming potential of the manufacture and use of an MFC in kgCO2-eq for 1 m3 of winched timber.
Figure 4. Global warming potential of the manufacture and use of an MFC in kgCO2-eq for 1 m3 of winched timber.
Forests 09 00591 g004
Table 1. Costing: assumptions, cost items and total.
Table 1. Costing: assumptions, cost items and total.
CharacteristicUnitMFC
Initial investment a63,000
Salvage value (as % of purchase price) b%10
Service life cyears8
Annual use ch/year1000
Fuel consumption eL/PMH152
Interest%4
Insurance c€/year700
Diesel d€/L1.60
Lube (as % of fuel cost) b%10
Repair & Maintenance c€/h2
Labor d€/h1350
Social charges (%) d%125
a [11], b [22], c personal communication from machine user, d [24], e [25].
Table 2. Input data regarding the machine production of one MFC.
Table 2. Input data regarding the machine production of one MFC.
MaterialMass (in %)Mass (in kg)
Steel52.0989
Cast iron22.3424
Crawler tracks7.4141
Plastics/PVC3.159
Electronic cables0.736
Hydraulic pipe1.914
Motor11.2212
Battery1.325
Table 3. Input data regarding energy source for machine manufacture and machine assembling in MJ per kg of machine, adapted from Athanassiadis et al. [31].
Table 3. Input data regarding energy source for machine manufacture and machine assembling in MJ per kg of machine, adapted from Athanassiadis et al. [31].
Energy SourceManufacture
(in MJ/kgmachine)
Assembling
(in MJ/kgmachine)
Electricity6.01.9
Oil0.7-
Coal0.4-
Natural gas0.7-
Liquefied petroleum gas0.4-
District heat1.42.2
Diesel0.70.7
Table 4. Characteristics of the winching operations.
Table 4. Characteristics of the winching operations.
CharacteristicValue
Total SMH (h)22.95
Total PMH0 (h)19.35
Work cycles241
Mean pulling distance (m ± SD)17.5 ± 10.1
Share of beech (%)69.1
Share of conifers (%)30.9
Total volume (m3)150.3
Productivity (m3/SMH)6.55
Productivity (m3/PMH0)7.77
Mean volume/cycle (±SD)0.62 ± 0.54
Mean trees/cycle (±SD)1.33 ± 0.68
Table 5. Mean (±standard deviation) net time consumption of the work elements.
Table 5. Mean (±standard deviation) net time consumption of the work elements.
Work ElementMean ± SD
(in 1/100 min)
%
(of Cycle Time)
Mandatory tasks
Pulling0.62 ± 0.4613.0
Chocking0.35 ± 0.457.3
Winching1.31 ± 1.2127.2
Unchocking0.35 ± 0.337.2
Optional tasks
Positioning0.57 ± 0.8911.8
Rechocking0.35 ± 0.837.4
Other tasks1.26 ± 1.7726.2

Share and Cite

MDPI and ACS Style

Berendt, F.; Fortin, M.; Suchomel, C.; Schweier, J. Productivity, Costs, and Selected Environmental Impacts of Remote-Controlled Mini Forestry Crawlers. Forests 2018, 9, 591. https://0-doi-org.brum.beds.ac.uk/10.3390/f9100591

AMA Style

Berendt F, Fortin M, Suchomel C, Schweier J. Productivity, Costs, and Selected Environmental Impacts of Remote-Controlled Mini Forestry Crawlers. Forests. 2018; 9(10):591. https://0-doi-org.brum.beds.ac.uk/10.3390/f9100591

Chicago/Turabian Style

Berendt, Ferréol, Mathieu Fortin, Christian Suchomel, and Janine Schweier. 2018. "Productivity, Costs, and Selected Environmental Impacts of Remote-Controlled Mini Forestry Crawlers" Forests 9, no. 10: 591. https://0-doi-org.brum.beds.ac.uk/10.3390/f9100591

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop