Next Article in Journal
Comparative Efficacy of Whole-Brain Radiotherapy with and without Elemene Liposomes in Patients with Multiple Brain Metastases from Non-Small-Cell Lung Carcinoma
Previous Article in Journal
Prognostic Value of Pretreatment Circulating Neutrophils, Monocytes, and Lymphocytes on Outcomes in Lung Stereotactic Body Radiotherapy
 
 
Current Oncology is published by MDPI from Volume 28 Issue 1 (2021). Previous articles were published by another publisher in Open Access under a CC-BY (or CC-BY-NC-ND) licence, and they are hosted by MDPI on mdpi.com as a courtesy and upon agreement with Multimed Inc..
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Making Molehills out of a Mountain: Experience with a New Scheduling Strategy to Diminish Workload Variations in Response to Increased Treatment Demands

1
Université de Montréal, Montreal, QC, Canada
2
Centre Intégré de Cancérologie de Laval, Laval, QC, Canada
3
Intelligent Improvement Consultants I2C, University of Toronto, Toronto, ON, Canada
4
Polytechnique Montréal, Montreal, QC, Canada
*
Author to whom correspondence should be addressed.
Curr. Oncol. 2016, 23(4), 369-376; https://0-doi-org.brum.beds.ac.uk/10.3747/co.23.3090
Submission received: 10 May 2016 / Revised: 10 June 2016 / Accepted: 2 July 2016 / Published: 1 August 2016

Abstract

Purpose: A new scheduling strategy was implemented. Before implementation, treatments and planning computed tomography (ct) imaging were both scheduled at the same time. Maximal wait times for treatment are defined by the Quebec Ministry of Health’s plan of action according to treatment aim and site. After implementation, patients requiring rapid treatment (priorities 0–3) continued to have their treatments scheduled at the same time as their planning ct; treatments for priority 4 (P4) patients were scheduled only after the treatment plan was approved. That approach aims to compensate for unexpected increases in planning workload by relocating less delay-sensitive cases to other time slots. We evaluated the impact on the patient experience, workload in various sectors, the care team’s perception of care delivery, access to care, and the department’s efficiency in terms of hours worked per treatment delivered. Methods: Three periods were defined for analysis: the pre-transitional phase, for baseline evaluation; the transitional phase, during which there was an overlap in the way patients were being scheduled; and the post-transitional phase. Wait times were calculated from the date that patients were ready to treat to the date of their first treatment. Surveys were distributed to pre- and post-transitional phase patients. Care team members were asked to complete a survey evaluating their perception of how the change affected workload and patient care. Operational data were analyzed. Results: We observed a 24% increase in the number of treatments delivered in the post-transitional phase. Before implementation, priority 0–3 patients waited a mean of 7.9 days to begin treatments (n = 241); afterward, they waited 6.3 days (n = 340, p = 0.006). Before implementation, P4 patients waited a mean 15.1 days (n = 233); after implementation, they waited 16.1 days (n = 368, p = 0.22). Surveys showed that patients felt that the time it took to inform them of treatment appointments was acceptable in both phases. No significant change in overtime hours occurred in dosimetry (p = 0.7476) or globally (p = 0.4285) despite the increased number of treatments. However, departmental efficiency improved by 16% (p = 0.0001). Conclusions: This new scheduling strategy for P4 cases resulted in improved access to care for priority 0–3 patients. Departmental efficiency was improved, and overtime hours did not increase. Patient satisfaction remained high.
Keywords: scheduling; treatments; efficiency; satisfaction; workflow; optimization; delays scheduling; treatments; efficiency; satisfaction; workflow; optimization; delays

Share and Cite

MDPI and ACS Style

Waters, A.; Alizadeh, M.; Filion, C.; Ashbury, F.; Pun, J.; Chagnon, M.P.; Legrain, A.; Fortin, M.A. Making Molehills out of a Mountain: Experience with a New Scheduling Strategy to Diminish Workload Variations in Response to Increased Treatment Demands. Curr. Oncol. 2016, 23, 369-376. https://0-doi-org.brum.beds.ac.uk/10.3747/co.23.3090

AMA Style

Waters A, Alizadeh M, Filion C, Ashbury F, Pun J, Chagnon MP, Legrain A, Fortin MA. Making Molehills out of a Mountain: Experience with a New Scheduling Strategy to Diminish Workload Variations in Response to Increased Treatment Demands. Current Oncology. 2016; 23(4):369-376. https://0-doi-org.brum.beds.ac.uk/10.3747/co.23.3090

Chicago/Turabian Style

Waters, A., M. Alizadeh, C. Filion, F. Ashbury, J. Pun, M.P. Chagnon, A. Legrain, and M.A. Fortin. 2016. "Making Molehills out of a Mountain: Experience with a New Scheduling Strategy to Diminish Workload Variations in Response to Increased Treatment Demands" Current Oncology 23, no. 4: 369-376. https://0-doi-org.brum.beds.ac.uk/10.3747/co.23.3090

Article Metrics

Back to TopTop