Next Article in Journal
Patch-Transformer Network: A Wearable-Sensor-Based Fall Detection Method
Previous Article in Journal
BDS Dual-Frequency Carrier Phase Multipath Hemispherical Map Model and Its Application in Real-Time Deformation Monitoring
Previous Article in Special Issue
Monitoring and Analysis of the Collapse Process in Blasting Demolition of Tall Reinforced Concrete Chimneys
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Determination of Blast Vibration Safety Criteria for Buried Polyethylene Pipelines Adjacent to Blast Areas, Using Vibration Velocity and Strain Data

College of Science, Wuhan University of Science and Technology, Wuhan 430065, China
*
Author to whom correspondence should be addressed.
Submission received: 1 June 2023 / Revised: 30 June 2023 / Accepted: 11 July 2023 / Published: 13 July 2023

Abstract

:
In order to ensure the safe operation of buried polyethylene pipelines adjacent to blasting excavations, controlling the effects of blasting vibration loads on the pipelines is a key concern. Model tests on buried polyethylene pipelines under blasting loads were designed and implemented, the vibration velocity and dynamic strain response of the pipelines were obtained using a TC-4850 blast vibrometer and a UT-3408 dynamic strain tester, and the distribution characteristics of blast vibration velocity and dynamic strain were analyzed based on the experimental data. The results show that the blast load has the greatest effect on the circumferential strain of the polyethylene pipe, and the dynamic strain response is greatest at the section of the pipe nearest to the blast source. Pipe peak vibration velocity (PPVV), ground peak particle velocity (GPPV), and the peak dynamic strain of the pipe were highly positively correlated, which verifies the feasibility of using GPPV to characterize pipeline vibration and strain level. According to the failure criteria and relevant codes, combined with the analysis of experimental results, the safety threshold of additional circumferential stress on the pipeline is 1.52 MPa, and the safety control vibration speed of the ground surface is 21.6 cm/s.

1. Introduction

In recent years, with the continuous advancement of urban infrastructure construction, buried pipeline projects are intertwined and the environment is complex and changeable. Polyethylene material is widely used in underground pipeline gas transportation and water supply and drainage projects, due to its high strength, high temperature resistance, corrosion resistance, non-toxicity, wear resistance, and lower cost than ordinary iron pipes and steel pipes. At the same time, with the rapid development of urban transportation, a large number of underground construction projects, such as subways, have sprung up. These projects often run parallel to, intersect, and span existing underground pipelines. Hard rocks are often encountered in the excavation process of underground engineering. As an efficient excavation method, blasting has been widely used, but blasting construction often affects adjacent pipelines. Therefore, it is of engineering practical significance and theoretical research value to study the dynamic response of buried polyethylene pipelines under the action of blasting loads and analyze the controlled vibration velocity of the pipelines.
Currently, a large number of scholars have carried out research work on the effects of blast vibration loads on adjacent pipelines [1,2,3,4]. In terms of studying the deformation characteristics of pipelines using the method of indoor tests, Ha et al. [5] used centrifuge tests to study the deformation law of HDPE pipelines, and combined the stress–strain data to obtain the relationship between the lateral force and deformation of the pipeline. Abdoun et al. [6] used centrifuge tests to study the force performance of PE pipelines with different burial depths and pipe diameters. Wang et al. [7] conducted indoor similar model tests to study the vibration characteristics of rock and adjacent buried pipes, and the dynamic response law of pipes during the construction of underpass tunnel by drill-and-blast method. In addition, a large number of scholars have used numerical simulation to study the dynamic response of buried pipes [8,9,10]. Francini et al. [11] used blasting numerical calculations to study the vibration law of the adjacent buried pipes and the ground surface above them, and proposed corresponding safety criteria. Jiang et al. [12] used the field monitoring data of Beijing metro line 16 to establish a 3D numerical model, analyzed the effects of subway tunnel blasting, and studied the dynamic response characteristics of the pipeline and the surrounding soil. Zhang Zhen et al. [13] established numerical models by LS-DYNA through field inspection, and studied the vibration velocity of buried concrete pipe sections at different locations under the action of shallow bursting vibration. Zhu [14] proposed the dynamic response of a ductile iron gas pipeline under blasting vibration by a field test. Xia [15] studied the dynamic response characteristics of a socket concrete pipeline through field tests, and put forward the vibration velocity safety criterion of the pipeline. Zhong [16] obtained the dynamic response of a polyethylene pipeline under explosive load by using field model tests. At present, studies on the dynamic response of adjacent pre-buried pipes under blast vibration conditions mostly use numerical software and indoor model tests [17,18,19,20], and few studies have been conducted using field tests. However, the numerical model and indoor model tests deal with the internal conditions and the external environment of the pipeline in a simple way, which makes a big difference compared with the actual engineering situation. Further, most of the research objects are hard pipes, such as cast iron and concrete, but there are fewer studies on polyethylene pipes, which are widely used but have a soft texture.
In this study, blasting tests on buried polyethylene pipes were first designed and implemented, using a TC-4850 blast vibrometer and UT3408 dynamic strain tester to establish a monitoring system to test and record the vibration velocity and dynamic strain of the pipes under blast vibration loads, respectively. The test data was then used to analyze the response characteristics of the polyethylene pipes under blast vibration loads at different explosive loads. Finally, using the pipe stress yielding criterion, the safety performance of the pipeline was evaluated based on the additional annular stress and the ground safety control vibration velocity of the polyethylene pipeline in conjunction with the relevant codes. The results show that this approach is feasible and effective.

2. The Experimental Setup

2.1. Experimental Site Parameters and Piping Parameters

The test site is located in an empty site of a blasting test center. The soil in the site has a high water content, and the soil medium is mainly yellow clay. The water content and saturation of the soil increase with the soil depth, and the saturation is between 60% and 100%; at about 2.5 m deep, the soil is silt-like, and the soil parameters vary greatly at different depths. The SR-RCT acoustic logging tool (Wuhan Zhongyan Technology Co., Ltd., Wuhan, China) was used to test the variation in compressional wave velocity due to different water content at different depths in the test site. The test data are shown in Table 1.
The test results show that the water content increases with the depth of the soil layer, and the velocity of the longitudinal wave increases accordingly. The test results are consistent with the conclusions of study [21]: the overall trend of water content and P-wave velocity in cohesive soil is positively correlated. When the soil moisture content is high, the P-wave velocity increases with the increase of water content within a certain range.
The test object is a PE80 water pipe, which is commonly used for oil and gas transmission in urban construction, as shown in Figure 1. PE pipe material parameters and geometric parameters are shown in Table 2 [22]. The pipeline laying method is a direct burial type laying, using professional machinery to excavate the pipe trench, to carry out the burial work in situ, using the original site soil backfill. Rock emulsion explosive was used in the blasting test, which was made into a spherical package and used coupled charging method.
The parameters changed in this experiment include the internal pressure of the pipe, the burst center distance, the buried depth of the burst source, and the amount of explosive. The experiments were designed using the control variable method and further optimized according to the orthogonal method, the test parameters and control variables range as shown in Table 3.

2.2. Test Monitoring System

According to the test design plan, a dynamic tester was used to test buried pipe in the model test, and the relevant data were measured dynamically in real time during the blast test [14]. The main test items of the test included pipe dynamic strain, pipe vibration velocity, and ground surface vibration velocity above the pipe. The monitoring system of this experiment uses a TC-4850 blast vibrometer (China Chengdu Zhongke Measurement and Control Co., Ltd., Chengdu, China) and a UT-3408 dynamic strain tester (China Wuhan Youtai Electronic Technology Co., Ltd., Wuhan, China) to monitor the pipeline vibration and strain under the blast load in the test, and the monitoring system is shown in Figure 2.

2.2.1. Vibration Test Systems

In order to study the vibration velocity of the buried pipeline and the surface above the pipeline, the TC-4850 blast vibration tester selected for the test was set up with 2 vibration velocity monitoring points on the upper surface of the pipeline and the surface of the soil above the pipeline, as needed. The TC-4850 vibrometer instrument used in the test has been calibrated regularly by a domestic professional evaluation agency. The sensor converts the velocity of the seismic wave generated by the explosion into a voltage signal, which is converted into a digital signal through a converter, and recorded into the memory of the instrument. After the test is completed, the data line is transferred to a computer, where the signal is calculated and processed, and finally output in the form of a report to a printer or stored on a hard disk drive. The main parameters of the vibrometer are shown in Table 4.

2.2.2. Strain Testing Systems

The test strain is tested with a UT3408 dynamic strain tester; technical specifications are shown in Table 5, and professional components common in the BX120-3AA type resistance strain gauge (China Beijing Yiyang Vibration Testing Technology Co., Ltd., Beijing, China) and specific parameters are shown in Table 6.
In order to study the dynamic strain of the pipeline during blast vibration, the dynamic strain measurement points of the pipeline are arranged as shown in Figure 3. Five cross-sections are selected on the outer surface wall of the pipeline, and four measurement points are arranged at the center of the pipeline, i.e., 3rd section, on the blast surface, back blast surface, top surface, and bottom surface, and one blast surface measurement point is arranged on the other sections. The strain gauges used in the test are uniaxial 80 mm, 120 ω strain gauges, which are wired to the UT3408 dynamic strain tester, which is suitable for all types of field tests by collecting physical quantities, such as stress–strain, voltage, displacement, charge, and acceleration.

2.3. Test Monitoring System

The implementation process of this experiment is shown in Figure 4.

2.3.1. Pipe Sealing and Burial

Buried pipelines are mostly used for water, oil and gas transmission. In order to make the test results more realistic, this test simulates gas pipelines and pressurizes the PE pipes in the test. Therefore, it is necessary to add ends and valves at both ends of the pipe to connect air compressors to pressurize the inside of the pipe. At the thread contact surface of the pipe, pipe thread sealant was used to ensure sealing between the pipe ends and the valve. After it sets, close the valve on one side, pressurize it with an air compressor, and monitor its air tightness. If there is any air leakage, the above steps should be repeated until the pipe, end, and valve are all sealed. All thread contact surfaces are coated with pipe thread sealant to ensure the sealing of the entire structure.

2.3.2. Strain Gauge Arrangement

The test method of strain testing in a general atmospheric environment is more mature, and it has the advantages of relatively easy operation and reliable results. However, the experimental pipeline was buried in watery soil, and the strain gauges were working in a watery environment, which might affect the strain gauges to a certain extent, and even cause damage to the strain gauges. In order to prevent damage to the strain gauges by immersion in the wet environment, the strain gauges were fully dried and cured, and the wires were connected to the strain gauges, then fixed with insulating glue after they were completely dry, and coated with water glue as a protective layer. After the water glue is dry, the wound wire is taped and fixed to prevent damage to the strain gauge when the wire is pulled.
As shown in Figure 3, five cross-sections were selected on the pipe, with four measurement points at the center of the pipe, i.e., 3rd section, on the blast face, back blast face, top face, and bottom face, and one blast face measurement point on the other sections. Two mutually perpendicular strain gauges in the axial and circumferential directions are arranged at each measurement point, the cable is tied and fastened to the center of the pipe, and the ends of the cable are marked according to the number of the measurement point, e.g., 3-1, i.e., measurement point 1 of 3rd section.

2.3.3. Vibration Sensor Arrangement and Installation

Before installing the sensor, the ground and pipe surface are cleaned, and gypsum powder is used in the fastened ground and pipe to fix it, to ensure that the sensor and the ground and pipe between the connection to ensure the accuracy of the test. When installing the sensor on the pipe, the Y direction is parallel to the axial direction of the pipe, the X direction pointing to the source of the explosion, and the Z direction is vertically facing upward; when installing the sensor on the ground, the X direction is facing the source of the explosion and the Z direction vertically facing upward, while ensuring that the sensor is level. The sampling frequency selected for the experimental process testing are 8 KHz.

2.3.4. Detonation and Testing

Before each test, according to the established charge design, carry out charge blockage, and perform extensive protection and alerting of people, to prevent harmful effects such as flying stones during the blasting process, and connect the charge to the detonator. Connect the data testing instrument with the sensor, and the relevant test personnel enter the experimental building to conduct test and test operations. According to the test plan, single or multiple blastholes are detonated, and data such as strain and vibration velocity are collected. After the single blasting, check the blasting effect, backfill around the blast hole, process the data, debug the test equipment, then carry out the next blasting test. The above steps are repeated to achieve the purpose of the experiment.

3. Test Results and Analysis

3.1. Dynamic Strain Analysis

Due to unavoidable factors in the test process, resulting in damage to some strain gauges, some data were missing or abnormal; after eliminating incomplete data strain signals, data were obtained for the burst source buried H = 1.5 m, burst center distance R = 2.7 m, 3.2 m, and 3.75 m, Q = 50 g, 75 g, 100 g, 125 g, 150 g, 175 g, and 200 g blast test conditions at each measurement point of the circumferential (H) peak strain and axial (Z) peak strain. The peak tensile strain (PTS) and peak compressive strain (PCS) were obtained, and the peak strain data of some pipes are shown in Table 7, Table 8 and Table 9.
For the nearest burst source of pipe to the center, that is, 3rd section, selected burst source burial depth H = 1.5 m, burst center distance R = 2.7 m, and Q = 50 g, 75 g, 100 g, 125 g, 150 g, 175 g, and 200 g strain data under each blasting test condition, the peak tensile strain (PTS) and peak compressive strain (PCS) distribution in the circumferential and axial directions are as follows in Figure 5, Figure 6, Figure 7 and Figure 8.
According to the above graphical data analysis, the peak strain of each measurement point of the pipe are increased with the increase in the charge can be seen. For 3rd section of the PE pipe (which is closest to the source), the maximum circumferential compressive strain is much greater than the tensile strain on the face (point 3) and back (point 1). The axial tensile strain is slightly larger than the compressive strain on the face of the explosion (measurement point 3). At the top and bottom of the pipe (measurement point 2 and measurement point 4), the circumferential tensile strain is generally larger than the compressive strain, and the axial compressive strain is generally larger than the tensile strain. Analysis shows that the outer surface of the pipe can be approximated as a plane stress state, the circumferential and axial strain is the main strain. Under different blasting conditions, the peak tensile and compressive strains on the back blast surface are within 45% to 57% of the peak on the blast surface. In the small scale distance, the maximum circumferential strain is larger than the maximum axial strain at the same measurement point. This is due to the fact that the test site is highly saturated clay, which has a high water content, which is conducive to the propagation of blast wave energy; the local impact of flexible PE pipe will produce in the larger circumferential strain. Based on the damage characteristics of polyethylene pipes, it can be seen that the pipes are more susceptible to damage under blast seismic loading, due to excessive circumferential compressive stresses.

3.2. Analysis of Vibration Test Results

Taking the burst center distance R = 2.7 m from the test data, calculations for the PE pipe and the surface PPV data as shown in Table 10. Here, PPV synthesis is by x-, y-, and z-axis maximum synthesis although, in general, the maximum value of the three does not occur at the same time, but the time difference is very small; synthesis of the highest value is slightly larger than the true highest value. The average ratio of the two is 0.386%, although the ratio of the two fluctuates with the proportional distance, but the fluctuation is not large in the range of the test proportional distance.
The two decay curves with proportional distance are shown in Figure 9, R ¯ ( m kg 1 / 3 ) represents proportional distance, R ¯ = R Q 1 / 3 . The correlation between them is shown in Figure 10. PPVV and GPPV show a good power exponential function decay relationship with proportional distance, and the GPPV decay index is also larger than that in the related literature. There is a strong positive correlation between the pipeline and the inter-surface PPV, and the two have an approximately linear proportional relationship.

3.3. Peak Strain, GPPV, and PPVV Correlation Analyses

The results of the correlation between peak strain and PPV are shown in Figure 11. The peak strain at each measurement point is linearly correlated with the height of PPVV, and the PPPV is linearly correlated with the height of GPPV, which means that the peak strain is linearly correlated with the GPPV.

4. Safety Criterion for Bursting Vibration Power of Buried Pipelines

4.1. Pipe Stress Calculation

According to the strength calibration of the national standard pipeline, the axial and circumferential working stresses of the pipeline caused by the internal pressure and temperature changes at the maximum working pressure are calculated according to the following equation [23]:
σ h w = p D o u t 2 δ σ a w = μ p σ h w + E p α l ( t 1 t 2 )
where σhw is the circumferential working stress at working pressure, σαω is the axial working stress due to changes in working pressure and temperature, αl is the material linear expansion coefficient, t1 is the installation temperature, and t2 is the operation temperature.
In addition to the working stresses caused by the transport pressure, there are additional stresses caused by the blast load in the pipeline in service under the action of the blast wave. Additional stress and additional strain to perform conversion calculations can be considered the stress–strain principal structure relationship, to obtain appropriate simplification. According to the analysis of the test data, the strain in the 45 degree direction is small, and the circumferential and axial strains are the main strains, the pipeline vibration frequency is low, and the loading process can be treated as a quasi-static process. Ignoring the positive pressure on the surface of the pipe, the outer surface of the pipe can be simplified to a plane stress state, and the circumferential and axial stresses are the main stresses. The total circumferential and axial stresses on the surface of the pipe are calculated by the following formula:
σ h = σ h w + σ h σ a = σ a w + σ a
where σ h is additional circumferential stress and σ a is additional axial stress.
Since peak axial and circumferential strains do not always occur simultaneously, and both do not always have the same polarity (same tensile or same compressive), it is assumed that the stress–strain relationship follows a simplified generalized Hooke’s law in the inline elastic deformation range, as follows:
ε h = 1 μ p 2 E p σ h ε a = 1 μ p 2 E p σ a
where ε h is the additional circumferential strain and ε a is the additional axial strain;
The additional stress can be obtained from the experimental measured strain data by Equation (3).

4.2. Strength Conditions

The national standard for pipe strength calibration uses the maximum shear stress theory; however, the general plastic material is better to use the von Mises strength theory and engineering practice match. The strength theory is the distortion energy criterion; for PE pipes, the von Mises failure theory is used to calibrate the strength with the following calculation formula:
σ = 1 2 [ ( σ 1 σ 2 ) 2 + ( σ 2 σ 3 ) 2 + ( σ 3 σ 1 ) 2 ] σ j
where σ1, σ2, and σ3 are the first, second and third principal stresses of the three-way stress state, respectively, and σj is the material’s ultimate stress.
The pipeline under the action of the blast wave, the most dangerous point on the outer surface of the pipeline in the most dangerous section, is simplified to a two-way stress state, considered in the most unfavorable case: assuming that the first and second principal stresses have the same sign and the third principal stress is zero, the von Mises failure theory can be simplified to the following inequality:
σ 1 2 + σ 2 2 + σ 1 σ 2 σ j
Equation (5)’s various materials ultimate stress selection is different. For the PE material pipeline’s ultimate stress, considering the importance of natural gas pipeline and with reference to the design of PE pipeline, the maximum working pressure (MOP) is mainly determined by the minimum required strength (MRS) of the material, so it is recommended that the persistence index MRS should be used as the final ultimate stress value of PE material, not the strength limit of PE material. MRS is the minimum guaranteed value of circumferential tensile strength of PE pipe for 50 years of normal operation under rated working pressure at 20 °C. MRS is much lower than the yield limit of polyethylene material, and the pipe stress is within the linear elasticity of the material, so this value is taken with a large safety margin. The national standard stipulates that the overall design factor of oil and gas transmission pipeline should be more than 2, so the rated pressure of polyethylene pipe has more than 30% safety margin in material strength. If the total time of blasting load on the pipeline is not long and the frequency of construction is not high, the accumulated damage can be negligible.

4.3. PE Pipe Safety Calibration

The disadvantage of the PE pipeline is the lower mechanical strength in higher working pressures and impact loads, which occur easily under the action of toughness fracture. In-service gas pipelines under the action of blast wave safety verification, by the internal pressure and shock load triggered by the combined stress judgment, according to the stress state calculated evaluation indicators, should be within the safety threshold, with strength verification according to the following formula:
σ 1 2 + σ 2 2 + σ 1 σ 2 M R S
For the pipeline, additional annular and axial dynamic strain can be calculated according to the empirical formula fitted by field measurements, but also according to the practical calculation model of pipeline deformation established in this paper, with additional dynamic stress according to the Formula (3). In general, in the blast wave near the midfield pipeline annular stress and axial stress, (the first principal stress and the second principal stress, respectively), the plane stress state of the third principal stress is zero, Formula (2) brought into Formula (6) can obtain the following:
( σ h w + σ h ) 2 + ( σ a w + σ a ) 2 + ( σ h w + σ h ) ( σ a w + σ a ) M R S
In accordance with the PE pipe design regulations, the overall design factor CF must be greater than 2; here, a conservative value of CF equal to 2, the pressure reduction factor DF takes a value of 1, axial stress temporarily disregards the influence of temperature changes, and the joint vertical (5). Combining Formulas (6) and (7) to calculate the rated pressure of the pipe under the circumferential and axial working stress results in the following formula:
σ h w = M R S × D o u t 2 × δ × ( S D R 1 ) = M R S × S D R 2 ( S D R 1 ) M R S 2 σ a w = μ p σ h w μ p M R S 2
It can be seen that the circumferential working stress is about 50% MRS. Substituting Equation (8) into Equation (7) by trial calculation to obtain the maximum additional dynamic stress threshold under the rated working pressure of the pipeline PE pipe gives:
σ h 19 % M R S ; σ a 19 % M R S ; C F = 2
For the tested PE80 material pipe with MRS of 8 MPa, the test pipe was of the SDR17.6 series, with a maximum working pressure of 0.5 MPa and an annular working stress of 4 MPa. Because the relative stiffness coefficient of the pipe soil is relatively small, the annular stress, rather than the axial stress, becomes the main controlling factor. If the relative stiffness coefficient of pipe soil is larger, the additional axial stress may be the main controlling factor. The maximum value of additional dynamic stress for σ h should be 19% of MRS, which is about 1.5 MPa.
For conditions similar to this test, the peak strain of the pipe and the peak ground vibration velocity can be directly calculated using the fitted relationship equation. According to the recommended blasting safety guidelines, in this test site and test pipeline conditions, the PE pipeline pressurized to 0.5 MPa, according to the peak strain of the test data—the proportional distance fitting equation to calculate the maximum allowable explosives in the determination of the burst center distance. According to national regulations, natural gas pipelines within 5 m of blasting operations are prohibited, so take the burst core distance to be 5 m and the depth of burial of the package to be 1.5 m. For safety, monitoring of the maximum allowable GPPV can be fitted by peak strain and surface vibration speed relational equation, as shown in Figure 10; surface vibration speed and proportional distance relational equation is shown in Figure 11, the calculated parameters and results are shown in Table 11, and the fitted relational equations are as follows.
Cyclic peak strain versus GPPV:
ε h max = 31.2 v l max 87.53
GPPV versus scaled distance:
v l max = 1161.41 R ¯ 2.5178
The calculated maximum allowable GPPV of the PE pipe is 291 mm/s, which is much larger than the standard recommended in other literature. Under the test conditions, blast waves of this vibration amplitude did not pose a threat to the straight section of the PE pipe. After the completion of the test program plan, the final additional test, the pipeline pressurized to 0.6 MPa, greater than the maximum rated pressure of 0.5 MPa specified by the design. At a burst center distance of 2.2 m and a charge of 200 g, the peak surface vibration was greater than 291 mm/s, the maximum peak strain and fitting the results of the relationship between the calculation of a better match, the explosion did not occur after the pipe leakage and there was no pressure change in the pipe.

5. Conclusions

The bursting test of buried PE pipeline was carried out by using TC-4850 bursting vibrometer and UT-3408 dynamic strain tester to monitor the dynamic response of the pipeline. Combined with relevant theoretical analysis, the effect of blasting seismic load on a buried, pressured PE pipeline was studied. The primary conclusions are as follows:
(1)
Through the field test found that the PE pipeline is affected by blasting vibration, the pipeline vibration speed and peak strain are increased with the increase in the amount of explosive, and the peak strain at the nearest location of the pipeline from the blast source is the largest. Among them, the PE pipe is subjected to the largest circumferential compression strain, and circumferential compression damage is more likely to occur in the pipe;
(2)
According to the analysis of the test data, it can be seen that the peak vibration velocity of the pipeline, the peak surface vibration velocity, and the peak strain of the pipeline have a high linear correlation to the proportional distance of this test. The peak pipe strain and the peak surface vibration velocity satisfy the relationship ε h max = 31.2 v l max 87.53 . It shows that the use of surface vibration velocity as a technical means of buried pipeline field monitoring is more reliable and simple to operate, and is worth promoting;
(3)
Based on the test results, the safety evaluation of a buried, pressurized PE pipeline was carried out by combining the yield strength standard and relevant codes. The safety threshold of additional circumferential stress of pipeline in this experiment was 1.52 MPa, the safety control vibration speed of ground surface was 21.6 cm/s, the minimum value of safety proportional distance was 4.87 m kg−1/3, and the maximum allowable explosive quantity was 1.08 kg. The relevant conclusions can provide reference for the safety operation index of buried PE pipeline under similar working conditions.

Author Contributions

Conceptualization, S.T. and D.Z.; methods, L.L.; software, X.G.; validation, D.Z., H.T. and S.T.; formal analysis, S.T.; data collation, S.T.; writing—original manuscript preparation, S.T.; writing—review and editing, S.T. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Not applicable.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Wang, D.; He, L.C.; Wang, K. Field measurement and numerical simulation analysis for influence of blasting excavation on adjacent buried pipelines. China Civ. Eng. J. 2017, 50, 134–140. [Google Scholar] [CrossRef]
  2. Giannaros, E.; Kotzakolios, T.; Kostopoulos, V. Blast response of composite pipeline structure using finite element techniques. J. Compos. Mater. 2016, 50, 3459–3476. [Google Scholar] [CrossRef]
  3. Won, J.H.; Kim, M.K.; Kim, G.; Cho, S.H. Blast-induced dynamic response on the interface of a multilayered pipeline. Struct. Infrastruct. Eng. 2014, 10, 80–92. [Google Scholar] [CrossRef]
  4. Jeon, S.H.; Moon, H.D.; Sim, C.; Ahn, J.-H. Construction stage analysis of a precast concrete buried arch bridge with steel outrig-gers from full-scale field test. Structures 2021, 29, 1671–1689. [Google Scholar] [CrossRef]
  5. Ha, D.; Abdoun, T.H.; O’Rourke, M.J.; Symans, M.D.; O’Rourke, T.D.; Palmer, M.C.; Stewart, H.E. Centrifuge modeling of earthquake effects on buried high—Density polyethylene (HDPE)pipelines crossing fault zones. J. Geotech. Geoenviron. Eng. 2008, 134, 1501–1515. [Google Scholar] [CrossRef]
  6. Abdoun, T.H.; Ha, D.; O’rourke, M.J.; Symans, M.D.; O’rourke, T.D.; Palmer, M.C.; Stewart, H.E. Factors influencing the behavior of buried pipelines subjected to earthquake faulting. Soil Dyn. Earthq. Eng. 2009, 29, 415–427. [Google Scholar] [CrossRef]
  7. Wang, H.T.; Jin, H.; Jia, J.Q.; Chnag, S.T.; Yan, S. Model test study on the influence of subway tunnel drilling and blasting method on adjacent buried pipeline. Chin. J. Rock Mech. Eng. 2018, S1, 3332–3339. [Google Scholar] [CrossRef]
  8. Lee, S.-H.; Eum, K.-Y.; Le, T.H.M.; Park, D.-W. Evaluation on mechanical behavior of asphalt concrete trackbed with slab panel using full-scale static and dynamic load test, Construction and Building. Materials 2021, 276, 122207. [Google Scholar] [CrossRef]
  9. Sandhu, I.S.; Sharma, A.; Kala, M.B.; Singh, M.; Saroha, D.R.; Thangadurai, M. Comparison of Blast Pressure Mitigation in Rubber Foam in a Blast Wave Gen-erator and Field Test Setups. Combust. Explos. Shock. Waves 2020, 56, 116–123. [Google Scholar] [CrossRef]
  10. Lou, M.; Ming, H.Q. The dynamic response analysis of submarine suspended pipeline impacted by dropped objects based on LS-DYNA. Mar. Sci. Bull. 2015, 2015, 113–120. [Google Scholar] [CrossRef]
  11. Francini, R.B.; Baltz, W.N. Blasting and construction vibrations near existing pipelines: What are the appropriate levels? J. Pipeline Eng. 2009, 8, 519–531. [Google Scholar]
  12. Jiang, N.; Gao, T.; Zhou, C.B.; Luo, X. Effect of excavation blasting vibration on adjacent buried gas pipeline in a metro tunnel. Tunn. Undergr. Space Technol. 2018, 81, 590–601. [Google Scholar] [CrossRef]
  13. Zhang, Z.; Zhou, C.B.; Lu, S.W.; Jiang, N.; Wu, C. Dynamic response characteristic of adjacent buried concrete pipeline subjected to blasting vibration. J. Harbin Inst. Technol. 2017, 46, 79–84. [Google Scholar] [CrossRef]
  14. Zhu, B.; Jiang, N.; Jia, Y.S.; Zhou, C.; Luo, X.; Wu, T.-Y. Field experiment on blasting vibration effect of underpass gas pipeline. Chin. J. Rock Mech. Eng. 2019, 38, 2582–2592. [Google Scholar] [CrossRef]
  15. Xia, Y.Q.; Jiang, N.; Yao, Y.K.; Zhou, C.; Luo, X.; Wu, T.-Y. Dynamic responses of a concrete pipeline with bell—And-spigot joints buried in a silty clay layer to blasting seismic waves. Explos. Shock Waves 2020, 40, 70–80. [Google Scholar] [CrossRef]
  16. Zhong, D.W.; Lu, Z.; Huang, X.; Chen, C.; Si, J.F. Experimental Study on Buried PE Pipeline under Blasting Loads. Blasting 2018, 35, 89. [Google Scholar] [CrossRef]
  17. Zhang, J.; Zhang, L.; Liang, Z. Buckling failure of a buried pipeline subjected to ground explosions. Process Saf. Environ. Protection. Prot. 2018, 114, 36–47. [Google Scholar] [CrossRef]
  18. Parviz, M.; Aminnejad, B.; Fiouz, A. Numerical simulation of dynamic response of water in buried pipeline under explosion. KSCE J Civ. Eng. 2017, 21, 2798–2806. [Google Scholar] [CrossRef]
  19. Wu, K.; Zhang, H.; Liu, X.; Bolati, D.; Liu, G.; Chen, P.; Zhao, Y. Stress and strain analysis of buried PE pipelines subjected to mechanical excavation. Eng. Fail. Anal. 2019, 106, 104–171. [Google Scholar] [CrossRef]
  20. Xia, Y.; Jiang, N.; Zhou, C.; Luo, X. Safety assessment of upper water pipeline under the blasting vibration induced by Subway tunnel excavation. Eng. Fail. Anal. 2019, 104, 626–642. [Google Scholar] [CrossRef]
  21. Jose, T.; Vinbi, C.; Salim, F.; Mathew, J.; Raghavu, S. A study of variation in PPV through different types of soil using geophones during blast loading. Int. Res. J. Eng. Technol. 2018, 5, 2086–2088. [Google Scholar]
  22. Zhong, D.W.; Gong, X.C.; Tu, S.W.; Huang, X. Dynamic responses of PE pipes directly buried in high saturated clay to blast wave. Explos. Shock. 2019, 39, 033102. [Google Scholar] [CrossRef]
  23. Gong, X.C.; Zhong, D.W.; Si, J.F.; He, L. Dynamic responses of hollow steel pipes directly buried in high-saturated clay to blast waves. Explos. Shock. 2020, 40, 10–22. [Google Scholar] [CrossRef]
Figure 1. Test pipe diagram.
Figure 1. Test pipe diagram.
Sensors 23 06359 g001
Figure 2. Schematic diagram of the monitoring system.
Figure 2. Schematic diagram of the monitoring system.
Sensors 23 06359 g002
Figure 3. Pipeline strain and vibration test layout.
Figure 3. Pipeline strain and vibration test layout.
Sensors 23 06359 g003
Figure 4. Schematic diagram of the test procedure; (a) Excavating trenches; (b) Buried pipelines; (c) Installation of vibration sensors; (d) Mounting strain gauges; (e) Placing explosives; (f) Data collection.
Figure 4. Schematic diagram of the test procedure; (a) Excavating trenches; (b) Buried pipelines; (c) Installation of vibration sensors; (d) Mounting strain gauges; (e) Placing explosives; (f) Data collection.
Sensors 23 06359 g004
Figure 5. PE pipe 3rd section axial PTS distribution chart.
Figure 5. PE pipe 3rd section axial PTS distribution chart.
Sensors 23 06359 g005
Figure 6. PE pipe 3rd section axial PCS distribution diagram.
Figure 6. PE pipe 3rd section axial PCS distribution diagram.
Sensors 23 06359 g006
Figure 7. PE pipe 3rd section ring PTS distribution map.
Figure 7. PE pipe 3rd section ring PTS distribution map.
Sensors 23 06359 g007
Figure 8. PE pipe 3rd section ring PCS distribution diagram.
Figure 8. PE pipe 3rd section ring PCS distribution diagram.
Sensors 23 06359 g008
Figure 9. PPVV and GPPV decay with proportional distance.
Figure 9. PPVV and GPPV decay with proportional distance.
Sensors 23 06359 g009
Figure 10. PPVV and GPPV linear correlation.
Figure 10. PPVV and GPPV linear correlation.
Sensors 23 06359 g010
Figure 11. Peak strain is linearly related to PPPV (a) and GPPV (b) (R = 3.75 m, R = 2.7 m).
Figure 11. Peak strain is linearly related to PPPV (a) and GPPV (b) (R = 3.75 m, R = 2.7 m).
Sensors 23 06359 g011
Table 1. Velocities of longitudinal waves in different depths of soil.
Table 1. Velocities of longitudinal waves in different depths of soil.
Serial NumberSensor TypeBuried Depth/cmProbe Distance/mLongitudinal Sound Velocity/(m/s)
1Acoustic emission probe200.5853
2Aqueous medium coupling probe600.5891
3Aqueous medium coupling probe1000.5954
Table 2. PE pipe material parameters.
Table 2. PE pipe material parameters.
Outside Diameter
of Pipe
DN/mm
Inner Diameter
of Pipe
ds/mm
Wall Thickness
of Pipe
δP/mm
Pipe Length
LP/m
Young’s Modulus
EP/MPa
Poisson’s Ratio
μp
Strength Limit
σPb/MPa
Elongation Rate
ξp/%
31527818.44.8834.90.4031.6116
Table 3. Test parameters and range of control variables.
Table 3. Test parameters and range of control variables.
Experimental ParametersControl Variable Range
Explosive quantity (g)50, 75, 100, 125, 150, 175, 200
Depth of burial of explosion source (m)0.5, 1, 1.5, 2
Pipeline internal pressure (MPa)0, 0.2, 0.4, 0.6
Burst core distance (m)2.2, 2.7, 3.2
Table 4. Blast vibration tester parameters.
Table 4. Blast vibration tester parameters.
Instrument:TC-4850 Blast Vibrometer
Number of channelsParallel three-channel
Display methodFull Chinese LCD display
Sampling rate100 sps~100 Ksps, multi-grade adjustable
A/D resolution16 Bit
Frequency response range0~10 kHz
Recording methodContinuous trigger recording, can record 128~1000 times
Recording time1~160 s adjustable
Trigger modeInternal trigger, external trigger
Measurement rangeMaximum input value 10 V (35 cm/s)
Trigger Level0~10 V (0~35 cm/s) arbitrary adjustable
Storage Capacity1M SRAM, 128 M flash
Recording accuracy0.01 cm/s
Reading accuracy1‰
Battery duration≥60 h
Adaptation to the environment−10~75 °C, 0~95% RH
Size168 mm × 99 mm × 64 mm
Weight1 kg
Table 5. Dynamic strain tester parameters.
Table 5. Dynamic strain tester parameters.
Instrument:UT-3408 Dynamic Strain Tester (Strain Measurement)
Number of channels8/16, fully synchronized sampling
Maximum continuous sampling frequency128 KHz
Dynamic range120 dB
Input methodEach channel in the collector has built-in voltage, charge, IEPE (ICP), and strain input conditioning modules. Each channel can be independently programmed with voltage input, charge input (piezoelectric acceleration sensor), dual constant current source IEPE input (ICP acceleration sensor), and strain input, and each channel input mode can be programmed by software, and the indicator shows the setting status.
Programmable amplificationAutomatic range control and pre-conditioning amplification (1, 2, 5, 10, 20, 50, 10, 200, 500, 1000×)
Strain measurement range0~±100,000 με (2 V bridge voltage)
Bridge Circuit Resistor60~1000 Ω
Bridge supply voltage (DC)1, 2, 3, 6, 10, 12 V
Error differenceErrors ≤ ±0.2%
Current20 mA max
Sensitivity factork = 2.00
Anti-interference energyCan effectively resist 50 Hz interference
Table 6. Parameters of BX120-3AA type resistance strain gauge.
Table 6. Parameters of BX120-3AA type resistance strain gauge.
Resistance ValueSubstrate SizeWire Shed SizeStrain Rate CoefficientLead LengthRoom Temperature Limit
120 ± 1 Ω15 × 6 mm3 × 3 mm2.0 ± 1%4 cm20,000 UM/M
Table 7. PE pipe strain peak (R = 2.7 m).
Table 7. PE pipe strain peak (R = 2.7 m).
Strain GaugesPeak Strain/10−6
50 (g)75 (g)100 (g)125 (g)150 (g)175 (g)200 (g)
PTSPCSPTSPCSPTSPCSPTSPCSPTSPCSPTSPCSPTSPCS
321H46121861517316099239143318162340182356
321Z427956116689071109751197811476121
323H4015362826521094315129419115345177480
323Z13710313997141107200154256197178169292232
331H43109561156414487202122271136286158296
331Z95846279113109137171159216164235159254
332H1217024724716790263145341259371313442365
332Z8396216311107139131209193290248341296395
333H4120117433391279158403271554333614420657
333Z14195303295192125256180339224370243387256
334H749021118510597183105279152329202377274
334Z117113171220135145171202215243246260239283
Table 8. P3 tube strain peak (R = 3.2 m).
Table 8. P3 tube strain peak (R = 3.2 m).
Strain GaugesPeak Strain/10−6
50 (g)75 (g)100 (g)125 (g)150 (g)175 (g)200 (g)
PTSPCSPTSPCSPTSPCSPTSPCSPTSPCSPTSPCSPTSPCS
2-1H119162 83114 100121 117178198274154244178264
2-1Z109120 8099 86116 98135142176120162123173
2-3H8387 7080 7588 8390 92138 81128 90123
2-3Z112132 87129 113134 115140 180169 149135 170148
3-1H94104 7270 8776 10893 170182 147115 164143
3-1Z6987 5372 5877 6980 9599 7877 7987
3-2H185176 114105 151127 256183 477369 361224 442298
3-2Z148249 94159 106201 161306 326510 175399 254478
3-3H133284 70187 93205 163316 287502 210385 245436
3-3Z219228 139153 167187 243264 429397 300279 357328
3-4H119122 8371 10086 117128 198259 154179 178217
3-4Z109200 80152 86172 98199 142273 120201 123234
Table 9. P3 tube strain peak (R = 3.75 m).
Table 9. P3 tube strain peak (R = 3.75 m).
Strain GaugesPeak Strain/10−6
50 (g)75 (g)100 (g)125 (g)150 (g)175 (g)200 (g)
PTSPCSPTSPCSPTSPCSPTSPCSPTSPCSPTSPCSPTSPCS
2-1H21 21 23 24 25 27 39 67 51 128 51 141 68 181
2-1Z20 19 28 24 32 27 48 50 57 61 50 47 60 58
2-3H20 18 23 29 23 40 35 88 47 150 42 174 51 213
2-3Z22 29 28 38 34 43 62 68 96 92 107 78 130 104
3-1H20 20 24 26 26 28 41 53 52 102 49 120 66 147
3-1Z13 23 21 31 27 35 47 67 68 95 62 84 82 110
3-1X5 7 6 6 6 7 15 14 27 25 30 35 38 37
3-2H16 11 26 16 29 19 69 41 134 88 194 110 195 135
3-2Z18 24 24 37 24 41 42 76 65 104 76 122 88 122
3-3H29 23 34 31 28 37 44 96 71 199 99 289 115 309
3-3Z19 27 29 41 34 44 61 80 97 108 122 106 136 116
3-4H18 18 22 28 24 32 43 51 99 69 155 55 165 65
3-4Z19 30 26 41 30 43 51 84 82 121 88 114 103 139
Table 10. Comparison of GPPV and PE pipe PPVV (R = 2.7 m).
Table 10. Comparison of GPPV and PE pipe PPVV (R = 2.7 m).
ProjectsPPV (cm·s−1)
50 g75 g100 g125 g150 g175 g200 g
PPVV3.54.74.46.27.88.38.7
GPPV9.011.911.415.219.422.924.7
Ratio38.9%39.9%38.7%40.6%40.3%36.1%35.4%
Table 11. Fitting relational calculation parameters and results (p = 0.5 MPa).
Table 11. Fitting relational calculation parameters and results (p = 0.5 MPa).
PipeBurst Core Distance/mMaterial Ultimate Stress/MPaAdditional Circumferential Stress Threshold
/MPa
Additional Peak Circumferential Strain/10−6Surface Vibration Speed Threshold/(mm/s)Permissible Surface Vibration Speed/(mm/s)Minimum Safe Proportional Distance/(m kg−1/3)Maximum Allowable Explosive Quantity/kg
PE58 (MRS)1.52143543.221.64.871.08
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Tu, S.; Zhong, D.; Li, L.; Gong, X.; Tao, H. Determination of Blast Vibration Safety Criteria for Buried Polyethylene Pipelines Adjacent to Blast Areas, Using Vibration Velocity and Strain Data. Sensors 2023, 23, 6359. https://0-doi-org.brum.beds.ac.uk/10.3390/s23146359

AMA Style

Tu S, Zhong D, Li L, Gong X, Tao H. Determination of Blast Vibration Safety Criteria for Buried Polyethylene Pipelines Adjacent to Blast Areas, Using Vibration Velocity and Strain Data. Sensors. 2023; 23(14):6359. https://0-doi-org.brum.beds.ac.uk/10.3390/s23146359

Chicago/Turabian Style

Tu, Shengwu, Dongwang Zhong, Linna Li, Xiangchao Gong, and Haohao Tao. 2023. "Determination of Blast Vibration Safety Criteria for Buried Polyethylene Pipelines Adjacent to Blast Areas, Using Vibration Velocity and Strain Data" Sensors 23, no. 14: 6359. https://0-doi-org.brum.beds.ac.uk/10.3390/s23146359

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop