Next Article in Journal
A Conceptual Model for Selecting Early Contractor Involvement (ECI) for a Project
Next Article in Special Issue
Comparative Analysis of Dynamic Response of Damaged Wharf Frame Structure under the Combined Action of Ship Collision Load and Other Static Loads
Previous Article in Journal
Comparison of the Influence of Double-Limb Double-Plate Joint on the Stability Bearing Capacity of Triangular and Quadrilateral Transmission Tower Structures
Previous Article in Special Issue
Experimental and Analytical Investigation of Bond Behavior of Deformed Steel Bar and Ultra-High Performance Concrete
 
 
Article

Article Versions Notes

Action Date Notes Link
article pdf uploaded. 8 June 2022 13:20 CEST Version of Record https://0-www-mdpi-com.brum.beds.ac.uk/2075-5309/12/6/785/pdf-vor
article xml file uploaded 9 June 2022 10:20 CEST Original file -
article xml uploaded. 9 June 2022 10:20 CEST Update https://0-www-mdpi-com.brum.beds.ac.uk/2075-5309/12/6/785/xml
article pdf uploaded. 9 June 2022 10:20 CEST Updated version of record https://0-www-mdpi-com.brum.beds.ac.uk/2075-5309/12/6/785/pdf
article html file updated 9 June 2022 10:22 CEST Original file -
article html file updated 3 August 2022 04:05 CEST Update https://0-www-mdpi-com.brum.beds.ac.uk/2075-5309/12/6/785/html
Back to TopTop