Next Article in Journal
ADMM-1DNet: Online Monitoring Method for Outdoor Mechanical Equipment Part Signals Based on Deep Learning and Compressed Sensing
Previous Article in Journal
Study on the Movement of Overlying Rock Strata and Surface Movement in Mine Goaf under Different Treatment Methods Based on PS-InSAR Technology
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Comprehensive Evaluation of NIMBY Phenomenon with Fuzzy Analytic Hierarchy Process and Radar Chart

1
State Key Laboratory of Electrical Insulation and Power Equipment, Xi’an Jiaotong University, Xi’an 710049, China
2
Shaanxi Electric Power Research Institute of State Grid Corporation of China, Xi’an 710000, China
*
Author to whom correspondence should be addressed.
Submission received: 4 February 2024 / Revised: 10 March 2024 / Accepted: 18 March 2024 / Published: 21 March 2024

Abstract

:
The risk level of the NIMBY (Not In My Back Yard) phenomenon is crucial for the safety and economy of transmission and transformation projects which is rarely studied, especially for site selection and the construction of transmission lines and substations. In order to effectively evaluate the risk level to solve the dilemma caused by the NIMBY phenomenon, an evaluation method for quantifying the level of the NIMBY phenomenon is proposed. In this paper, thirty-one evaluation criteria and a risk model are put forward according to relevant laws and regulations that should be followed in the transmission and transformation project in China, then the scores corresponding to these criteria are obtained by a questionnaire survey. The radar chart method and minimum area method are applied to determine the weights of the element and unit layers. Furthermore, the overall risk level is evaluated by the fuzzy comprehensive evaluation method. In addition, a transmission and transformation project in Xi’an City, China, is used as an example to verify the correction of the risk model and its evaluation method. The results show that the weaknesses in the transmission and transformation project are analyzed, and suggestions for decreasing the risk level are put forward to minimize losses due to the NIMBY phenomenon.

1. Introduction

Risk evaluation is critical to the development of various industries, particularly the electric power industry. The electric power industry is an important basic energy industry in the development of national economy. A safe and reliable power network promotes the development of the country’s economy and the well-being of its people. At present, countries all over the world are in a phase of such rapid development that the number and scale of power constructions required are increasing, and likewise, the capital and labor costs consumed are enormous. Therefore, reducing risk-assessment levels for the electric power industry helps to reduce construction costs, thereby contributing to the long-term growth and reliability of the business [1]. The risk evaluation of the electric power industry is, thus, of vital importance to people, power grid corporations, society, the economy and national security. A safe, reliable and sustainable electrical power system can provide people with a more convenient and comfortable life.
However, in order to ensure the reliability and quality of the power supply, the substation construction of the electrical power system must be deep in the load center, which is densely populated, and its land must be highly developed. In addition, the visual intrusion, noise and potential health risks of the electromagnetic fields emitted by electromagnetic devices are burdens [2]. There are two main sources of noise: one is the corona discharge of transmission lines, and the other is the vibration of transformer cores and windings due to the electromagnetic force generated by alternating magnetic fields [3]. Meanwhile, electric-power equipment generates electromagnetic radiation, which interferes with nearby radio equipment, televisions, telephones, etc., causing image distortion, sound noise or communication interruption. Therefore, the siting of power lines and substations has often been met with public opposition, leading to significant planning delays and financial losses. The construction of transmission and transformation projects in the large-scale urban core area has become a common problem plagued by the power-grid corporations. Such opposition due to the public’s misunderstanding of the effects of electric-power facilities is commonly labeled NIMBY, meaning the public exhibit a not-in-my-backyard behavior. It is defined interpreted by Dear in 1992 as “the protectionist attitudes and oppositional tactics of community groups in the face of unwelcome development in their neighborhoods [4]”. Initially, the NIMBY behavior is generally viewed as a negative, showing that people prioritize their personal interests over the interests of society [5]. As more and more siting events occur as a result of the NIMBY phenomenon, some academics have critiqued the NIMBY explanation as shortsighted, pointing out that canned explanations mask the real reasons why people support or oppose wind-farm development [6,7,8]. In addition, some scholars provide a detailed review of the work of their predecessors. Based on the thirty years of North American wind-energy acceptance research, Rand et al. [9] conclude that the socioeconomic impacts of wind development are strongly tied to acceptance and issues of fairness, participation and trust during the development process influence acceptance. In order to lay the necessary groundwork of the NIMBY phenomenon for synthesis attempts, Borell et al. [10] critically scrutinize and analyze the first wave of research, which is a series of attitudinal data, and contrast later approaches which reflect the real-life protests against the establishment of human services.
The NIMBY phenomenon refers to the fear of residents or local units that construction projects, such as transmission and transformation projects, waste-disposal plants, nuclear-power plants and funeral parlors, will bring about a number of negative impacts on physical health, environmental quality and asset value, thus stimulating people’s dislike of the complex and fostering the mentality of ‘do not build it in my backyard’, which means they will take a strongly collective opposition and even demonstrate resistance behavior [11,12,13].
Research on the NIMBY phenomenon in the world focuses on the construction of waste-disposal plants, nuclear power plants and funeral parlors, and seldom deals with the aspects of transmission and transformation projects. Moreover, the planning and construction of transmission and transformation projects are highly different from those mentioned above, which are mainly reflected in the planning of power grids, construction periods, line direction, substation-layout locations and social-demand levels. In addition, the little research on the NIMBY phenomenon of transmission and transformation projects are mostly approached from the aspects of project management, technological innovation and economic compensation, and seldom explores it from the direction of analyzing the existing cases, researching the relationship between the relevant stakeholders and establishing a risk model to solve the problem [14,15,16,17]. For example, Devine [18] discusses the factors affecting the siting problem of the 80 km 400 kV Lackenby–Picton–Shipton line in the northeast of England through questionnaires and hierarchical linear regression analysis. Bidwell [19] theoretically explored the impact of general values and beliefs on wind energy. Song et al. [20] proposed the genetic algorithms to minimize the total degree of NIMBY sentiments.
For the risk assessment of transmission and transformation projects, the impact variables are qualitative, not quantitative. Therefore, the use of fuzzy comprehensive evaluation is extremely appropriate. Meanwhile, the fuzzy comprehensive evaluation refers to the use of fuzzy mathematics methods to assess the possibility of evaluating fuzzy objects influenced by multiple factors based on certain evaluation criteria [21,22,23]. The method has been widely used in comprehensive evaluation in various fields and has achieved good results [24,25,26].
A risk assessment is carried out with reference to a number of evaluation indicators, which are assigned different weights depending on their level of importance. The weight calculation is generally divided into subjective and objective weights, because the evaluation indicators of the risk assessment are qualitative, so the subjective weights like the analytic hierarchy process (AHP) method is commonly used as a useful multiple-criteria decision-making tool or a weight-estimation technique in various areas of human needs and interests [27]. The conventional AHP is a simple and explicit method to acquire a judgement matrix by exact ratios or numbers. However, due to the complexity, vagueness and uncertainty involved in real-world decision-making problems, decision makers discuss how the fuzzy judgement is more practical than explicit comparisons [28]. Nowadays, the combination of the conventional AHP and fuzzy methods to form a fuzzy AHP has been widely used. The method, called the fuzzy analytic hierarchy process (FAHP), first introduced by Van Laarhoven and Pedrycz, is a powerful tool to treat uncertainty in the case of incomplete or vague information [29]. Patil et al. [30] proposed a fuzzy AHP-TOPSIS framework for ranking the solutions of knowledge-management adoption. Mosadeghi et al. [31] compared the fuzzy AHP and AHP in an urban land-use planning decision and proposed to choose different methods depending on the complexity of the planning. Jiang et al. [32] used the fuzzy comprehensive evaluation method to solve the problem of the resource evaluation of a port shoreline.
However, the above method can not enable visualization to reflect certain characteristics of high-dimensional data or the overall relationship between data. The radar chart method is a multi-variable analytical method for comprehensive evaluation that can visually reflect the relative strengths and weaknesses of the evaluation system on the trend of each indicator [33]. Wang et al. [34] combined the AHP and entropy weight method based on the radar chart method to solve the comprehensive evaluation problem of power transmission and transformation projects. Wang et al. [35] used the fuzzy analytic hierarchy process and improved radar method to comprehensively evaluate and rank the braking performance of three types of hydrodynamic retarders.
Therefore, in order to solve the dilemma caused by the NIMBY phenomenon of transmission and transformation projects, a fuzzy analytic hierarchy process method based on improved an radar chart is suggested. For this aim, six units and thirty-one elements are proposed for constructing a hierarchical structure of performance evaluation. Then, the expert evaluation method, the radar chart method and the minimum area method are used to determine the weights of the element and unit layers. Finally, a transmission and transformation project in Xi’an City, China, is used as an example to verify the correction of the risk model and its evaluation method. The detailed contributions and novelty of this paper are as follows:
(1)
Based on the laws and regulations that should be followed in the transmission and transformation project in China, a risk-evaluation index system of the NIMBY phenomenon that can accurately assess the risk model of transmission and transformation project is derived;
(2)
The fuzzy analytic hierarchy and radar chart methods are applied to calculate the weights of the evaluation criteria. The imprecise decision maker’s judgments are represented as fuzzy numbers rather than exact numerical values;
(3)
The proposed method is feasible and effective, which has been verified by the transmission and transformation project in Xi’an City. It further provides suggestions based on the research results for risk evaluation and serves as a reference for future research in this field.

2. Risk Evaluation System of NIMBY Phenomenon

2.1. Evaluation Process

The selection of evaluation indicators is a crucial step in the risk evaluation of the NIMBY phenomenon, as it directly affects the evaluation results. The risk evaluation indicators should follow the principles of systematicity, scientific quality, comparability and practicability [36,37,38]. In addition, each of these principles needs to be reflected in the evaluation results through a combination of qualitative and quantitative principles which allow for more specific and accurate evaluation results.
The risk model of the NIMBY phenomenon of transmission and transformation projects and the evaluation method are mainly carried out in the following steps: (1) Firstly, analyze and determine the major elements affecting the NIMBY phenomenon of transmission and transformation projects, and construct a three-level evaluation index system including the target layer, unit layer and element layer. Secondly, define the evaluation grade characteristics and evaluation value ranges. Finally, estimate the risk model of the NIMBY phenomenon of transmission and transformation projects. (2) Secondly, use the expert evaluation method and radar chart method to evaluate different elements of every layer. Then, use the minimum area method to calculate the risk level. Finally, use the fuzzy comprehensive evaluation method to calculate the overall risk level. The construction of the risk model and the flow of the evaluation method are shown in Figure 1.
A combination of multiple evaluation methods is adopted to evaluate the risk of the NIMBY phenomenon of transmission and transformation projects, making the results more accurate and reasonable. Meanwhile, a factor-analysis method is an objective and scientific mathematical method which can be used to select the main evaluation indexes of the NIMBY phenomenon and quantify the evaluation indexes through the Likert scale [39]. In addition, the expert evaluation method is scored with the help of experts, which is more professional and authoritative.

2.2. Evaluation Index System

The most important step of the risk model lies in the selection of evaluation indexes whose accuracy and comprehensiveness directly affect the reliability and scientificity of the evaluation results. By analyzing, extracting and summarizing the cases of transmission and transformation projects with the NIMBY phenomenon in Zhejiang Province, Chongqing Municipality, and Xi’an City, and following the laws on transmission and transformation projects formulated by China, the risk model of the NIMBY phenomenon is constructed as shown in Figure 2. Meanwhile, the risk-evaluation indexes include the power-grid corporation, the local residents, the ambiguity of relevant scientific standards and changes in national laws.
The risk model of the NIMBY phenomenon consists of six units and thirty-one elements, as shown Figure 2. In more detail, the six units identify the main risk of the NIMBY phenomenon, and thirty-one elements point to specific influences. The subject and impact aspects of each unit are listed below [40,41,42]. In this figure, U1 to U6 are the abbreviations of the units. A1 to A5, B1 to B6, C1 to C7, D1 to D6, E1 to E5 and F1 to F6 are the abbreviations of the elements.
U1: Anti-risk ability of the citizen. The units focus on the resident’s family situation, family income, children’s status, parental status and residential property, and these factors reflect the acceptability of financial compensation to residents.
U2: Residents’ understanding of transmission and transformation projects and whether they accept the construction of transmission and transformation projects.
U3: The impact of transmission and transformation projects on the lives and livelihoods of neighboring residents.
U4: Whether the location of transmission and transformation projects can reduce the probability of the NIMBY phenomenon.
U5: Whether the power-grid corporation’s promotion and communication are in place to facilitate public acceptance of the construction of transmission and transformation projects.
U6: Measuring the acceptance of local residents and the power-grid corporation in economic terms.
The above units and elements are not isolated from each other, but are closely related. In the specific practice process, the elements can be adjusted appropriately according to the actual transmission and transformation project. The thirty-one elements in these units can be used as the risk-evaluation indexes of the NIMBY phenomenon in transmission and transformation projects.

2.3. Evaluation Grade Characteristics and Evaluation Value Ranges

Combining the cases and the laws that should be followed in the transmission and transformation projects in China, the qualitative indicator system has been obtained. However, in order to quantitatively and comprehensively evaluate the risk of the NIMBY phenomenon in transmission and transformation projects, it is necessary to clearly define the evaluation criteria for each index.
According to the research of experts and the strict laws on noise and electromagnetic environment in China, each unit and element are divided into five levels (level 1 to level 5). In more detail, the five risk levels and the range of evaluation values are uniformly corresponded to each other one by one, in which 1 and 5 points correspond to the lowest and the highest evaluation values, respectively. The risk levels and their ranges of assessed values are, in descending order, essentially no risk (0.0, 2.0], low risk (2.0, 3.2], medium risk (3.2, 4.0], high risk (4.0, 4.6] and severe risk (4.6, 5.0], as shown in Table 1.
The key to the application of the risk-assessment results lies in the feedback on the implementation of project decisions. In the actual process of risk assessment, for projects with a medium-risk rating or higher, risk-prevention and -mitigation measures should be proposed for key risk elements, and the responsible parties and cooperation units for the measures should be clearly defined. Only after the risk of the measures has been reassessed and confirmed to be low risk can the project continue to be implemented.

3. Evaluation Method of the Risk Model

3.1. Risk Evaluation of the Unit and Element Layer

When the risk model of the NIMBY phenomenon is determined, it is crucial to conduct the risk assessment. By analyzing the flow of the risk-evaluation method, as shown in Figure 1, it was found that the relative weights among the elements are difficult to determine because their number is large and to some extent they are interconnected and influenced by each other. Therefore, the radar charts based on the minimum-area method are used to clearly and intuitively show the risk level of each element under each unit and their relationships with each other.

3.1.1. Evaluation of the Risk of the Element Layer

In order to obtain statistics, relevant personnel involved in the construction of transmission and transformation projects are invited to conduct a questionnaire survey on each element based on the definition of the five risk levels and their corresponding range of evaluation values. The evaluation value can be jointly assessed by the local government, the power-grid corporation and local residents, and then the linear weighting method is used to calculate the comprehensive evaluation results. For example, the A1 is scored, and after the comprehensive calculation of the three-party evaluation, the final evaluation results are shown in Table 2. Similarly, a comprehensive evaluation of the risk model can be obtained in the end.

3.1.2. Map the Radar Charts of the Units

By connecting the evaluation values calculated above by units in an N-sided shape, that N is the number of elements corresponding to the unit layer, and a radar map for each unit can be obtained [43].

3.1.3. Evaluate the Risk of the Units

According to the completed radar charts, the risk of the units can be written as follows [44]:
r = S 1 S 2 × 5
where r is the risk of the units, S1 is the area of the shaded area, which is the area of the graph where the elements of the same unit are connected end to end, and S2 is the area of the N-sided shape.
Since the different order of the evaluation values in the radar chart may result in different shaded areas, the risk level can be evaluated by the minimum-area-ranking method [44].
r = { [ c 1 × ( c 2 n + c 2 n 1 ) + i = 2 n 1 c i × ( c 2 n i + c 2 n + 2 i ) + c n × ( c n + 1 + c n + 2 ) ] / 2 n } 1 / 2 , N = 2 n { [ c 1 × ( c 2 n + c 2 n + 1 ) + i = 2 n c i × ( c 2 n + 1 i + c 2 n + 3 i ) + c n × ( c n + 1 + c n + 2 ) ] / 2 ( n + 1 ) } 1 / 2 , N = 2 n + 1
where c1, c2, c3, …, c2n, c2n+1 are in ascending order by assessed value, i refers to the number of elements within the unit, n represents an integer and N means the total number of elements, which is divided into odd and even cases.

3.2. Overall Risk Evaluation

Based on the weights of each unit relative to the overall calculated above, the fuzzy comprehensive evaluation method is used to obtain the overall risk evaluation of the project.

3.2.1. Evaluation the Risk of the Element Layer

Through the questionnaire from the local government, the power-grid corporation and local residents, the qualitative results can be obtained. Therefore, the analytic hierarchy process is used to obtain more intuitively and accurately the risk level of the NIMBY phenomenon.
(1)
Modeling the hierarchy
The hierarchy model for assessing the risk level of the NIMBY phenomenon is divided into three layers including the goal layer, the unit layer and the element layer from inside to outside.
(2)
Building the judgment matrices
Starting at the second level of the hierarchy model, the weights of all elements in this layer against an element in the previous layer are calculated, and this calculation process is obtained by a two-by-two comparison denoted as matrix A. Meanwhile, the scale of matrix elements is obtained as shown in Table 3.
(3)
Calculating the weight vectors
Through the eigen decomposition of the judgment matrix A, the maximum eigenvalue λmax and its corresponding eigenvector W can be obtained. In addition, the weights of these elements are acquired by normalizing W.
(4)
Checking the consistency
As the weighted values are obtained through scoring by different experts, there is a possibility of self-contradiction. Therefore, it is necessary to test the consistency of these scores. The test number CR of the consistency check can be described as follows [45]:
C R = λ max m ( m 1 ) × R I
where m is the number of units in the unit layer, which in this paper is 6, RI is the average stochastic consistency index corresponding to m, which in this paper is 1.24.
When the order is 1 and 2, the judgment matrix is always completely consistent. When the order is greater than 2, if CR < 0.1, the consistency of the judgment matrix is considered acceptable; otherwise, it is necessary to adjust the judgment matrix to cause it to have satisfactory consistency [46].
Table 3. Saaty’s scale for pairwise comparison [47].
Table 3. Saaty’s scale for pairwise comparison [47].
Saaty’s ScaleThe Relative Importance of the Two Sub-Elements
1Equally important
3Moderately important with one over another
5Strongly important
7Very strongly important
9Extremely important
2, 4, 6, 8Intermediate values

3.2.2. Comprehensive Evaluation Values of the Risk Model

Fuzzy comprehensive evaluation models are proposed by different synthetic operations between the weight vector A and the single-factor evaluation matrix R. Table 4 shows four basic methods of common fuzzy relation synthesis operations.
For the same object set, different mathematical models are used to calculate the sorting results that may be different. This is in line with objective reality, as observing and analyzing the same thing from different perspectives may lead to different conclusions. Model 1, Model 2 and Model 3 are rough, while Model 4 is more accurate and suitable for a comprehensive evaluation because it considers overall factors [48].
According to the radar charts of these units, the evaluation values R of the six units in the risk model can be acquired as R1, R2, R3, R4, R5 and R6. Therefore, the fuzzy comprehensive evaluation method can be used to calculate the risk level L as follows [49]:
L = W R T = ( W 1 , W 2 , W 3 , W 4 , W 5 , W 6 ) ( R 1 , R 2 , R 3 , R 4 , R 5 , R 6 ) T

4. Results

4.1. Fuzzy Analytic Hierarchy Process (FAHP) Based on the Radar Chart Method

A substation construction project in Xi’an City required risk calculations for the NIMBY phenomenon to maximize the absence of conflicts caused by the NIMBY phenomenon and enable the project to be delivered on time. In this paper, through the construction of the risk model and the assessment of the NIMBY phenomenon, and for the high-risk factors to take relevant measures, so that the risk level is reduced to a safe range, the final project can be successfully implemented. The specific steps are as follows [50,51,52,53,54]:
(1)
Determine the evaluation index system according to the factor-analysis method. The six units and thirty-one elements of Figure 1 are selected for the risk-evaluation index system;
(2)
Define the evaluation grade characteristics and evaluation value ranges according to the Likert scale;
(3)
Evaluate the risk of these elements according to the expert evaluation method and map the radar chart of these units according to the radar chart method. The local government, the power-grid corporation and the local residents are invited to conduct a questionnaire survey on each element based on the definition of the five risk levels. The statistics of the questionnaire survey including numbers and percentages for the interviews are shown in Table 5. The corresponding comprehensive scores for each element of the risk model are shown in Table 6, and the evaluation results of all elements of each unit are synthesized according to the radar chart method. For example, the linearly weighted evaluation of the seven elements from c1 to c7 of the unit U3 are 3.91, 3.22, 3.12, 3.54, 4.08, 3.26 and 3.09, respectively, and the risk evaluation of the unit U3 gives 3.42 according to Equation (2). Since the number of elements in the unit U6 is less than four, the risk evaluation of the unit U6 is acquired by a weighted average. Similarly, the risk evaluation of the unit from U1 to U6 are 4.11, 4.15, 3.42, 3.90, 4.12 and 2.91. The radar charts of the units are written as shown in Figure 3;
(4)
Calculate the overall risk evaluation of the transmission and transformation project according to the fuzzy comprehensive evaluation method as shown in Section 3.2. After obtaining the weights of each unit and element, the judgement matrix A can be acquired through expert scoring of the study of the NIMBY phenomenon in transmission and transformation projects. The judgement matrix A is written as follows:
A = 1 2 4 4 2 1 / 2 1 / 2 1 3 3 1 1 / 3 1 / 4 1 / 3 1 1 1 / 3 1 / 5 1 / 4 1 / 3 1 1 1 / 3 1 / 5 1 / 2 1 3 3 1 1 / 3 2 3 5 5 3 1
The maximum eigenvalue λmax is 6.074 and its corresponding normalized eigenvector W = [0.2349, 0.1425, 0.0564, 0.0564, 0.1425, 0.3675] is obtained. In addition, the test number CR is 0.012, which is less than 0.1, so the judgement matrix A is valid because it passes the consistency check.
Therefore, the risk evaluation of the NIMBY phenomenon obtained is 3.3530, proving that the risk level is medium risk according to Table 1.

4.2. Fuzzy Analytic Hierarchy Process (FAHP)

The method utilizes the four-step FAHP method to determine the weights of the criteria. Experts are required to provide their judgments on the basis of their expertise and to compare every factor pairwise in their corresponding section structured in the hierarchy. Then, these experts’ preferences are converted into a fuzzy number-evaluation matrix. The defuzzication is employed to transform the fuzzy scales into crisp scales for the computation of priority weights.
The judgement matrix A of units can be acquired using Equation (5) through the expert scoring of the study. Similarly, the judgement matrix A of elements can be calculated as follows:
U 1 = 1 1 / 2 1 / 3 1 / 5 1 / 2 2 1 1 / 2 1 / 4 1 3 2 1 1 / 2 2 5 4 2 1 3 2 1 1 / 2 1 / 3 1
U 2 = 1 3 2 3 5 4 1 / 3 1 1 / 3 1 / 2 3 2 1 / 2 3 1 2 4 3 1 / 3 2 1 / 2 1 3 2 1 / 5 1 / 3 1 / 4 1 3 2 1 / 4 1 / 2 1 / 3 1 / 2 2 1
U 3 = 1 1 1 1 / 2 1 1 / 2 1 / 2 1 1 1 2 1 1 / 2 1 / 2 1 1 1 2 1 1 / 2 1 / 2 2 1 / 2 1 / 2 1 1 / 2 1 / 3 1 / 3 1 1 1 2 1 1 / 2 1 / 2 2 2 2 3 2 1 1 2 2 2 3 2 1 1
U 4 = 1 1 / 4 1 / 2 1 / 3 1 / 4 1 / 5 4 1 3 2 1 1 / 2 2 1 / 3 1 1 / 2 1 / 3 1 / 4 3 1 / 2 2 1 1 / 2 1 / 3 4 1 3 2 1 1 / 2 5 2 4 3 2 1
U 5 = 1 2 1 2 3 1 / 2 1 1 / 2 1 2 1 2 1 2 3 1 / 2 1 1 / 2 1 2 1 / 3 1 / 2 1 / 3 1 / 2 1
U 6 = 1 3 1 / 3 1
The weights of the 31 indicators are W1 = [0.0734, 0.1259, 0.2365, 0.4309, 0.1332], W2 = [0.3578, 0.1166, 0.2429, 0.1512, 0.0513, 0.0802], W3 = [0.1030, 0.1188, 0.1188, 0.0863, 0.1188, 0.2271, 0.2271], W4 = [0.0496, 0.2054, 0.0762, 0.1226, 0.2054, 0.3409] and W5 = [0.2976, 0.1579, 0.2976, 0.1579, 0.0890], W6 = [0.7500, 0.2500].
The weights of the 31 evaluation indicators were calculated using the FAHP method. Based on the collected survey results, the weights of each indicator were calculated and are presented in Table 7. The risk evaluation of the NIMBY phenomenon obtained is 3.6555, proving that the risk level is medium risk according to Table 1.
The above methods obtain the same level of safety, but considering that the radar chart method considers more comprehensive factors, it is better to be comprehensive.

5. Discussion

Based on the experience of relevant transmission and substation projects, it is concluded that a medium risk is highly likely to have conflicts caused by the NIMBY phenomenon and that there is huge scope for the all-round enhancement of the project. Therefore, we need to analyze the risk level of each unit of the project. Through the analysis, we can establish that U1, U2 and U5 are at high risk, U3 and U4 are at medium risk and U6 is at low risk, which shows that the public’s ability to resist risk is weak, and the level of public acceptance and publicity is not in place in the location of the project, so the amount of compensation should be increased appropriately, increasing the publicity of the impact of transmission and transformation projects and public participation. In addition, the medium risk shows that there is also a risk of impact from the project facilities themselves, and based on onsite measurements, it was found that the noise and magnetic field strengths are indeed high. Therefore, treatment is needed to reduce the impact of the project itself, so that the risk index meets the requirements.
According to whether the evaluation value varies with the measures taken, units can be divided into two categories. The first type is U1 and U4. U1 reflects the standard of living of the residents, and it does not change with the situation of the site, nor with the measures taken. U4 represents the characteristics of the power transmission and transformation project itself, which changes with the scale of the project.
The second type is U2, U3, U5 and U6. U2 reports the level of citizens’ awareness of science and the NIMBY phenomenon. When hearings and discussion meetings are held to make residents fully aware of the huge benefits and overestimated disadvantages of power transmission and transformation projects, the assessment value of the unit will be greatly reduced. U3 reflects the impact of power transmission and transformation projects, which is not only physical but also psychological. In response to noise and other physical impacts, relevant departments should listen to public opinions and take measures promptly. Meanwhile, scientific lectures should be held to enhance the public’s correct understanding of risks and reduce their psychological impact. U5 reports whether the publicity of the government and power-grid corporation is in place. If the evaluation value of this unit is too high, it is necessary to rectify the publicity department. U6 reflects the conflict point between the public and power-grid corporations. When the public’s living conditions are poor, the compensation amount can be appropriately increased. After receiving scientific learning, the public will also reduce their hostility towards the NIMBY phenomenon. Therefore, there are certain lower limits to the risk evaluation in different regions. In addition, the purpose of this paper is to take measures for high-risk units and minimize the overall risk.
After taking the above measures, a second questionnaire survey was conducted on previous interviewers. Meanwhile, the content of this questionnaire was the same as that of the first one, but some of the interviewers were unable to accept the invitation. Therefore, the corresponding number of investigators was supplemented, as shown in Table 5. The corresponding comprehensive scores for each element of the risk model are shown in Table 8.
Through the use of the radar chart method based on the minimum-area method, the risk evaluations of the unit from U1 to U6 are 4.23, 2.78, 2.51, 3.74, 2.32 and 2.37. By comparing the statistics before and after taking measures, two conclusions can be drawn which are also in line with the fact. On the one hand, the risk evaluation of U1 and U4 remains basically unchanged because the living conditions and location of the residents have not changed significantly. On the other hand, the evaluation values of other units have shown varying degrees of decrease, because through holding hearings and discussion meetings, the public has a clearer understanding of the advantages of power transmission and transformation projects, which greatly reduces the evaluation of units and the risk of the NIMBY phenomenon.
In addition, the corresponding normalized eigenvector W remains unchanged and the risk evaluation of the NIMBY phenomenon obtained is reduced to 2.93 according to Equation (5), which already meets the construction requirements, and finally the project is successfully implemented in Shaanxi Province without generating conflicts caused by the NIMBY phenomenon.
It is essential to calculate the risk evaluation of the NIMBY phenomenon, which we insist must be assessed before the construction of the transmission station project, causing the risk level of the NIMBY phenomenon to be reduced to low-risk, or else a huge amount of time and money will be wasted.

6. Conclusions

In this paper, a risk evaluation model of the NIMBY phenomenon was established using the fuzzy comprehensive evaluation method, the radar chart method and the minimum-area method. Combining the cases and the laws that should be followed in the transmission and transformation projects in China, a total of 31 parameters were selected as evaluation indicators, forming a risk-evaluation system and model of the NIMBY phenomenon. In addition, the scores corresponding to these criteria are obtained by questionnaire surveys. The radar chart method and the minimum area method are applied to determine the weights of the element and unit layers. Furthermore, the overall risk level is evaluated by the fuzzy comprehensive evaluation method. Finally, a transmission and transformation project in Xi’an City, China, is used as an example to verify the correction of the risk model and its evaluation method. The results show that based on the risk model and fuzzy comprehensive evaluation method, the limitations of the signal evaluation method on the risk of the NIMBY phenomenon can be avoided, and the results shows that the proposed method is feasible and effective.
The contribution of this paper is to propose a risk-evaluation model that assesses the risk level of the NIMBY phenomenon before the construction of power transmission and transformation projects. By using this evaluation model to assess the risk level, the weakness can be analyzed and suggestions for decreasing the risk level are put forward to minimize losses due to the NIMBY phenomenon.
However, some limitations can be expected. The risk evaluation of the NIMBY phenomenon is an extremely time-consuming and complex task that involves a wide range of knowledge. The proposed method does not consider all possible criteria that can be added to the risk model which includes human factors such as differences among different interviewers. In addition, the risk level may change if a new criterion is added.
For future work, we intend to explore more cases and conduct more empirical studies to further validate the usefulness of the research.

Author Contributions

J.W. proposed the topic of the review. Z.W. surveyed the literature and composed the manuscript. Z.W. conducted the literature review. N.D., J.W. and X.B. discussed and revised the manuscript. N.D. and J.W. supervised this project. J.W. and Z.W. contributed equally to this work. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded in part by the National Natural Science Foundation of China under Grant 52077161.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

The original contributions presented in the study are included in the article, further inquiries can be directed to the corresponding author.

Conflicts of Interest

Authors Jian Wu and Xiaochun Bai were employed by the company Shaanxi Electric Power Research Institute of State Grid Corporation of China. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

References

  1. Ma, L.; Cong, X.H. Social stability risk assessment of NIMBY major projects by OWA, matter-element, and cloud model. J. Intell. Fuzzy Syst. 2019, 36, 2545–2556. [Google Scholar] [CrossRef]
  2. Porsius, J.T.; Claassen, L.; Smid, T.; Woudenberg, F.; Timmermans, D.R.M. Health responses to a new high-voltage power line route: Design of a quasi-experimental prospective field study in the Netherlands. BMC Public Health 2014, 14, 237. [Google Scholar] [CrossRef] [PubMed]
  3. Doukas, H.; Karakosta, C.; Flamos, A.; Psarras, J. Electric power transmission: An overview of associated burdens. Int. J. Energy Res. 2011, 35, 979–988. [Google Scholar] [CrossRef]
  4. Dear, M. Understanding and overcoming the NIMBY syndrome. J. Am. Plan. Assoc. 1992, 58, 288–300. [Google Scholar] [CrossRef]
  5. Wolsink, M. Wind power implementation: The nature of public attitudes: Equity and fairness instead of ‘backyard motives’. Renew. Sustain. Energy Rev. 2007, 11, 1188–1207. [Google Scholar] [CrossRef]
  6. Horst, D.V.D. NIMBY or not? Exploring the relevance of location and the politics of voiced opinions in renewable energy siting controversies. Energy Policy 2007, 35, 2705–2714. [Google Scholar] [CrossRef]
  7. Devine-Wright, P. Rethinking NIMBYism: The role of place attachment and place identity in explaining place-protective action. J. Community Appl. Soc. Psychol. 2009, 19, 426–441. [Google Scholar] [CrossRef]
  8. Swofford, J.; Slattery, M. Public attitudes of wind energy in Texas: Local communities in close proximity to wind farms and their effect on decision-making. Energy Policy 2010, 38, 2508–2519. [Google Scholar] [CrossRef]
  9. Rand, J.; Hoen, B. Thirty years of North American wind energy acceptance research: What have we learned? Energy Res. Soc. Sci. 2017, 29, 135–148. [Google Scholar] [CrossRef]
  10. Borell, K.; Westermark, A. Siting of human services facilities and the not in my back yard phenomenon: A critical research review. Community Dev. J. 2018, 53, 246–262. [Google Scholar] [CrossRef]
  11. Dpkshin, F.A.; Buday, A. Not in Your Backyard! Organizational Structure, Partisanship, and the Mobilization of Nonbeneficiary Constituents against “Fracking” in Illinois, 2013–2014. Socius 2018, 4, 237802311878347. [Google Scholar] [CrossRef]
  12. Chen, S. Environmental disputes in China: A case study of media coverage of the 2012 Ningbo anti-PX protest. Glob. Media China 2017, 2, 303–316. [Google Scholar] [CrossRef]
  13. Horiuchi, Y.; Ono, Y. Susceptibility to threatening information and attitudes toward refugee resettlement: The case of Japan. J. Peace Res. 2023, 60, 459–473. [Google Scholar] [CrossRef]
  14. Wu, S.; Han, S.Y. System Evaluation of Artificial Intelligence and Virtual Reality Technology in the Interactive Design of Interior Decoration. Appl. Sci. 2023, 13, 6272. [Google Scholar] [CrossRef]
  15. David, F.; Joseph, W. The NIMBY problem. J. Theor. Probab. 2022, 34, 145–172. [Google Scholar]
  16. Wen, X.Y.; Lian, X.N.; Wang, K.H. Multi-layer collaborative optimization method for solving fuzzy multi-objective integrated process planning and scheduling. Meas. Control 2020, 53, 1883–1901. [Google Scholar] [CrossRef]
  17. Holm, R.H.; Chuanga, B.A.; Mallory, A. A Qualitative Study of NIMBYism for Waste in Smaller Urban Areas of a Low-Income Country, Mzuzu, Malawi. Environ. Health Insights 2021, 15, 1–11. [Google Scholar] [CrossRef]
  18. Devine-Wright, P. Explaining “NIMBY” objections to a power line: The role of personal, place attachment and project-related factors. Environ. Behav. 2013, 45, 761–781. [Google Scholar] [CrossRef]
  19. Bidwell, D. The role of values in public beliefs and attitudes towards commercial wind energy. Energy Policy 2013, 58, 189–199. [Google Scholar] [CrossRef]
  20. Song, B.D.; Morrison, J.R.; Ko, Y.D. Efficient location and allocation strategies for undesirable facilities considering their fundamental properties. Comput. Ind. Eng. 2013, 65, 475–484. [Google Scholar] [CrossRef]
  21. Li, Y.; Sun, Z.; Han, L.; Mei, N. Fuzzy comprehensive evaluation method for energy management systems based on an internet of things. IEEE Access 2017, 5, 21312–21322. [Google Scholar] [CrossRef]
  22. Zadeh, L.A. Quantitative fuzzy semantics. Inf. Sci. 1971, 3, 159–176. [Google Scholar] [CrossRef]
  23. Zadeh, L.A. Fuzzy logic = computing with words. IEEE Trans. Fuzzy Syst. 1996, 4, 103–111. [Google Scholar] [CrossRef]
  24. Chen, J.F.; Hsieh, H.N.; Do, Q.H. Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach. Appl. Soft. Comput. 2015, 28, 100–108. [Google Scholar] [CrossRef]
  25. Zhao, Y.; Zhang, C.; Wang, Y.; Lin, H. Shear-related roughness classification and strength model of natural rock joint based on fuzzy comprehensive evaluation. Int. J. Rock Mech. Min. Sci. 2021, 137, 1365–1609. [Google Scholar] [CrossRef]
  26. Zhu, Z.; Wu, Y.; Han, J. A Prediction Method of Coal Burst Based on Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation. Front. Earth Sci. 2022, 9, 834958. [Google Scholar] [CrossRef]
  27. Saaty, T.L. The Analytic Hierarchy Process; McGraw-Hill: New York, NY, USA, 1980. [Google Scholar]
  28. Wang, Y.M.; Luo, Y.; Hua, Z.S. On the extent analysis method for fuzzy AHP and its applications. Eur. J. Oper. Res. 2008, 186, 735–747. [Google Scholar] [CrossRef]
  29. Van Laarhoven, P.J.M.; Pedrycz, W. A fuzzy extension of Saaty’s priority theory. Fuzzy Set. Syst. 1983, 11, 229–241. [Google Scholar] [CrossRef]
  30. Patil, S.K.; Kant, R. A fuzzy AHP-TOPSIS framework for ranking the solutions of knowledge management adoption in supply chain to overcome its barriers. Expert Syst. Appl. 2014, 41, 679–693. [Google Scholar] [CrossRef]
  31. Mosadeghi, R.; Warnken, J.; Tomlinson, R.; Mirfenderesk, H. Comparison of Fuzzy-AHP and AHP in a spatial multi-criteria decision making model for urban land-use planning. Comput. Environ. Urban Syst. 2015, 49, 54–65. [Google Scholar] [CrossRef]
  32. Jiang, L.; Tao, T.; Zhang, C.; Jiang, H.; Wang, J. Summary of the port shoreline resource evaluation based on triangular fuzzy analytic hierarchy process. Pol. Marit. Res. 2017, 24, 16–22. [Google Scholar] [CrossRef]
  33. Shaojie, W.; Liang, H.; Lee, J.; Xiangjian, B. Evaluating wheel loader operating conditions based on radar chart. Autom. Constr. 2017, 84, 42–49. [Google Scholar]
  34. Wang, Y.L.; Li, Y.J. Comprehensive Evaluation of Power Transmission and Transformation Project Based on Improved Radar Chart. Adv. Mater. Res. 2011, 354–355, 1068–1072. [Google Scholar] [CrossRef]
  35. Wang, Z.; Wei, W.; Chen, X.; Langari, R.; Yan, Q. Comprehensive Evaluation of Hydrodynamic Retarders with Fuzzy Analytic Hierarchy Process and Improved Radar Chart. Machines 2023, 11, 849. [Google Scholar] [CrossRef]
  36. Li, Y.H.; Zeng, S.S. Modeling and analysis of football players’ specific physical ability based on training evaluation index. Secur. Commun. Netw. 2021, 2021, 1446971. [Google Scholar] [CrossRef]
  37. Fang, X.P.; Cao, C.; Chen, Z.Y. Using mixed methods to design service quality evaluation indicator system of railway container multimodal transport. Sci. Prog. 2019, 103, 1–27. [Google Scholar] [CrossRef] [PubMed]
  38. Chen, H.Y.; Cheng, Z.H.; Kong, D.Z. Evaluation of mining capacity of mines using the combination weighting approach: A case study in Shenmu Mining Area in Shaanxi Province, China. Sci. Prog. 2021, 104, 1–18. [Google Scholar] [CrossRef] [PubMed]
  39. Schreiber, J.B. Issues and recommendations for exploratory factor analysis and principal component analysis. Res. Social Adm. Pharm. 2021, 17, 1004–1011. [Google Scholar] [CrossRef]
  40. Bell, D.; Gray, T.; Haggett, C.; Swaffield, J. Revisiting the ‘social gap’: Public opinion and relations of power in the local politics of wind energy. Environ. Politics 2013, 22, 115–135. [Google Scholar] [CrossRef]
  41. Sun, C.; Yuan, X.; Yao, X. Social acceptance towards the air pollution in China: Evidence from public’s willingness to pay for smog mitigation. Energy Policy 2016, 92, 313–324. [Google Scholar] [CrossRef]
  42. Batel, S. Research on the social acceptance of renewable energy technologies: Past, present and future. Energy Res. Soc. Sci. 2020, 68, 101544. [Google Scholar] [CrossRef]
  43. Aruga, Y.; Saito, A.; Aoki, Y. Nursing care using KT (Kuchi-kara Taberu) index radar chart enabling elderly patients with dysphagia to live like human beings after initiating gastrostomy feeding. Proc. Singap. Healthc. 2018, 27, 136–138. [Google Scholar] [CrossRef]
  44. Li, Z.H. Research on Cost Management Maturity Model of Highway Construction Project. Master’s Thesis, Chongqing Jiaotong University, Chongqing, China, 2012. [Google Scholar]
  45. Saaty, T.L.; Kearns, K.P. Analytical Planning: The Organization of System; Elsevier: New York, NY, USA, 2014; Volume 7, p. 34. [Google Scholar]
  46. Chen, Y.C.; Dai, J.Y.; Xie, D. Comprehensive evaluation of mine ventilation system based on combined weighting cloud model. Syst. Eng. 2020, 38, 39–46. [Google Scholar]
  47. Saaty, T.L.; Vargas, L.G. Models, Methods, Concepts & Applications of the Analytic Hierarchy Process; Springer Science & Business Media: New York, NY, USA, 2012; Volume 175, p. 6. [Google Scholar]
  48. Li, X.L.; Chen, D.Y.; Fu, J.H.; Liu, S.M.; Geng, X.S. Construction and Application of Fuzzy Comprehensive Evaluation Model for Rockburst Based on Microseismic Monitoring. Appl. Sci. 2023, 13, 12013. [Google Scholar] [CrossRef]
  49. Leśniak, A.; Kubek, D.; Plebankiewicz, E.; Zima, K.; Belniak, S. Fuzzy AHP Application for Supporting Contractors’ Bidding Decision. Symmetry 2018, 10, 642. [Google Scholar] [CrossRef]
  50. Xue, W.Y.; Li, X.; Huang, B.Q. Health diagnosis of nuclear power plant. Int. J. Adv. Robot. Syst. 2019, 1, 1–8. [Google Scholar] [CrossRef]
  51. Lu, J.; Steinhardt, H.C. Alliance Building among Environmental Nongovernmental Organizations in China: The Emergence and Evolution of the Zero Waste Alliance. Mod. China 2020, 48, 105–133. [Google Scholar] [CrossRef]
  52. Qejavanaj, G. New Trends in Sustainable Environmental Governance in Mainland China. The Zhejiang Case. SAGE Open 2021, 11, 215824402110231. [Google Scholar] [CrossRef]
  53. Li, G.; Wang, H.B.; Pan, T.; Liu, H.B.; Si, H.Q. Fuzzy Comprehensive Evaluation of Pilot Cadets’ Flight Performance Based on G1 Method. Appl. Sci. 2023, 13, 12058. [Google Scholar] [CrossRef]
  54. Zhang, R.J.; Tian, D.; Wang, H.W.; Kang, X.Y.; Wang, G.; Xu, L.M. Risk Assessment of Compound Dynamic Disaster Based on AHP-EWM. Appl. Sci. 2023, 13, 10137. [Google Scholar] [CrossRef]
Figure 1. Risk model and the flow of the risk evaluation method.
Figure 1. Risk model and the flow of the risk evaluation method.
Applsci 14 02654 g001
Figure 2. Risk model of NIMBY phenomenon.
Figure 2. Risk model of NIMBY phenomenon.
Applsci 14 02654 g002
Figure 3. Radar charts of the units from U1 to U5.
Figure 3. Radar charts of the units from U1 to U5.
Applsci 14 02654 g003
Table 1. Definition of risk level.
Table 1. Definition of risk level.
Risk LevelLevel DefinitionRange of Assessed Values/Points
Essentially no riskProjects have little impact on residents and are of greater benefit(0.0, 2.0]
Low riskProjects have a small impact on residents and are acceptable to most people(2.0, 3.2]
Medium riskSome aspects of projects are unreasonable and cause resistance from a small number of residents(3.2, 4.0]
High riskMost aspects of projects are unreasonable and cause resistance from most residents(4.0, 4.6]
Severe riskThere is a fundamental problem with the development of projects and it needs to be planned(4.6, 5.0]
Table 2. Comprehensive evaluation results of A1.
Table 2. Comprehensive evaluation results of A1.
InvestigatorRange of Assessed Values/PointsWeight
Local government4.40.4
Power-grid corporation4.60.3
Local residents4.00.3
Weighted average = 4.4 × 0.4 + 4.6 × 0.3 + 4.0 × 0.3 = 4.34
Table 4. Mathematical model of the fuzzy comprehensive evaluation.
Table 4. Mathematical model of the fuzzy comprehensive evaluation.
Serial NumberTypeThe Relative
1Principal determinant type M
(∧, ∨)
∧ means taking a small operation, ∨ means
taking a large operation
2The main factor is highlighted
as I type M (·, ∨)
· stands for an ordinary multiplication
Operation, ∨ means taking a large operation
3The main factor is highlighted
as II type M (∧, ⊕)
∧ means taking a small operation, ⊕ means
sum with an upper limit of one, namely:
x⊕y = min(1, x + y)
4Weighted mean type M
(·, +)
· is a normal multiplication, and + is a
normal addition
Table 5. The statistics of the questionnaire survey.
Table 5. The statistics of the questionnaire survey.
InvestigatorNumberPercentage
Local government3321.7%
Power-grid corporation4831.6%
Local residents7146.7%
Total152100%
Table 6. Comprehensive score for each element of the risk model.
Table 6. Comprehensive score for each element of the risk model.
UnitsElementsComprehensive Score
U1: Anti-risk ability of citizensA1: Low income4.47
A2: Raise children4.16
A3: Permanent residence4.02
A4: Poor infrastructure4.06
A5: Support the elderly3.92
U2: Recognition level of citizensB1: Lack of understanding about risk factors4.04
B2: Low level of education4.11
B3: Difficult to access information4.06
B4: Low level of scientific awareness3.96
B5: Low trust in the corporations4.49
B6: Low credibility of the government4.23
U3: Effects of transmission and transformation projectsC1: High level of noise3.91
C2: High level of radio interference3.22
C3: High inductive current3.12
C4: Severe environmental pollution3.54
C5: High magnetic field4.08
C6: Risk of falling tower3.26
C7: Risk of spontaneous combustion3.09
U4: Location of transmission and transformation projectsD1: High population density4.17
D2: Long span3.49
D3: Near the city center3.69
D4: Away from load centers3.87
D5: Large equipment footprint4.12
D6: Inconvenient transportation4.09
U5: Promotion and communicationE1: Low public participation4.36
E2: Low public satisfaction3.94
E3: Low information disclosure4.45
E4: Low information accuracy3.87
E5: Negative media orientation4.19
U6: Compensation levelF1: Residents do not accept compensation3.09
F2: Compensation is not paid by corporation2.73
Table 7. The weights of each indicator.
Table 7. The weights of each indicator.
Target LayerPrimary IndexwiSecondary IndexwiwijRanking
The risk evaluationU1: Anti-risk ability of citizens0.2349A1: Low income0.07340.017215
A2: Raise children0.12590.029610
A3: Permanent residence0.23650.05564
A4: Poor infrastructure0.43090.10122
A5: Support the elderly0.13320.03139
U2: Recognition level of citizens0.1425B1: Lack of understanding about risk factors0.35780.05105
B2: Low level of education0.11660.016616
B3: Difficult to access information0.24290.03468
B4: Low level of scientific awareness0.15120.021513
B5: Low trust in the corporations0.05130.007323
B6: Low credibility of the government0.08020.011422
U3: Effects of transmission and transformation projects0.0564C1: High level of noise0.10300.005828
C2: High level of radio interference0.11880.006725
C3: High inductive current0.11880.006725
C4: Severe environmental pollution0.08630.004929
C5: High magnetic field0.11880.006725
C6: Risk of falling tower0.22710.012817
C7: Risk of spontaneous combustion0.22710.012817
U4: Location of transmission and transformation projects0.0564D1: High population density0.04960.002831
D2: Long span0.20540.011620
D3: Near the city center0.07620.004330
D4: Away from load centers0.12260.006924
D5: Large equipment footprint0.20540.011620
D6: Inconvenient transportation0.34090.019214
U5: Promotion and communication0.1425E1: Low public participation0.29760.04246
E2: Low public satisfaction0.15790.022511
E3: Low information disclosure0.29760.04246
E4: Low information accuracy0.15790.022511
E5: Negative media orientation0.08900.012719
U6: Compensation level0.3675F1: Residents do not accept compensation0.75000.27561
F2: Compensation is not paid by corporation0.25000.09193
Table 8. Comprehensive score after taking measures for each element of the risk model.
Table 8. Comprehensive score after taking measures for each element of the risk model.
UnitsElementsComprehensive Score
U1: Anti-risk ability of citizensA1: Low income4.42
A2: Raise children4.46
A3: Permanent residence4.35
A4: Poor infrastructure4.05
A5: Support the elderly4.07
U2: Recognition level of citizensB1: Lack of understanding about risk factors2.84
B2: Low level of education4.05
B3: Difficult to access information2.43
B4: Low level of scientific awareness2.50
B5: Low trust in the corporations2.51
B6: Low credibility of the government2.47
U3: Effects of transmission and transformation projectsC1: High level of noise2.97
C2: High level of radio interference2.34
C3: High inductive current2.52
C4: Severe environmental pollution2.71
C5: High magnetic field2.44
C6: Risk of falling tower2.24
C7: Risk of spontaneous combustion2.35
U4: Location of transmission and transformation projectsD1: High population density4.11
D2: Long span3.52
D3: Near the city center3.51
D4: Away from load centers3.74
D5: Large equipment footprint3.67
D6: Inconvenient transportation3.91
U5: Promotion and communicationE1: Low public participation2.23
E2: Low public satisfaction2.25
E3: Low information disclosure2.74
E4: Low information accuracy2.36
E5: Negative media orientation2.17
U6: Compensation levelF1: Residents do not accept compensation2.23
F2: Compensation is not paid by corporation2.51
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Wu, J.; Wang, Z.; Bai, X.; Duan, N. Comprehensive Evaluation of NIMBY Phenomenon with Fuzzy Analytic Hierarchy Process and Radar Chart. Appl. Sci. 2024, 14, 2654. https://0-doi-org.brum.beds.ac.uk/10.3390/app14062654

AMA Style

Wu J, Wang Z, Bai X, Duan N. Comprehensive Evaluation of NIMBY Phenomenon with Fuzzy Analytic Hierarchy Process and Radar Chart. Applied Sciences. 2024; 14(6):2654. https://0-doi-org.brum.beds.ac.uk/10.3390/app14062654

Chicago/Turabian Style

Wu, Jian, Ziyu Wang, Xiaochun Bai, and Nana Duan. 2024. "Comprehensive Evaluation of NIMBY Phenomenon with Fuzzy Analytic Hierarchy Process and Radar Chart" Applied Sciences 14, no. 6: 2654. https://0-doi-org.brum.beds.ac.uk/10.3390/app14062654

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop