Empirical Study of Foundry Efficiency Improvement Based on Data-Driven Techniques

Department of Industrial Engineering and Management, Ming Chi University of Technology, New Taipei City 243303, Taiwan
*
Author to whom correspondence should be addressed.
Submission received: 13 May 2021 / Revised: 4 June 2021 / Accepted: 19 June 2021 / Published: 22 June 2021
(This article belongs to the Section Manufacturing Processes and Systems)

Abstract

:
In this paper, a data-driven approach was applied to improve a furnace zone of a foundry in Taiwan. Improvements are based on the historical production records, order-scheduling, and labor-scheduling data. To resolve the bottleneck provided by the company, historical data were analyzed, and the existence of large variance in the process was found. Statistical analysis was performed to identify the primal factors causing the variance, and suggestions were made and implemented to the production line. As a result, daily production increased steadily to more than 30 pots of molten metal, while the original production was 20–30 pots of molten metal and are not controllable. Such significant improvement was mainly made by standardizing the input and reducing the variance of processes. The average cycle time of each pot of molten metal was reduced from 219 min to 135 min. Our suggested improvements also reduced the foundry’s electricity consumption cost by almost $240,000NT per month. In summary, data analysis can help traditional industries in identifying the main factors causing the bottleneck.

1. Introduction

Casting is the process of injecting the molten metal solution into a pre-made mold (such as a sand mold, ceramic mold, or metal mold) and waiting for it to cool and solidify before the cast is removed. The raw material of the foundry industry in Taiwan is import-based; the castings produced in Taiwanese foundries produce tools, automobiles, aircraft, and biomedicines. According to an official survey by ITIS [1], currently, there are more than 800 foundries in Taiwan; these are mainly small and medium-sized enterprises, and 39% of these enterprises are concentrated in the central region of Taiwan. The main casting products are automobile parts (35%), large line tool castings (25%), water hardware (20%), and cast-iron pipes (3%). These enterprises employ approximately 18,000 people and have an annual output of approximately 1.4 million tons. This NT$90-billion industry ranks 12th in the world. Relative to the unit area and population, the foundry industry ranks first and third globally, respectively.
This research proposes solutions for the furnace zone’s inefficiency. The manufacturer under consideration is currently the largest supplier of milling materials in Taiwan. The main products of this firm are automobile parts, mechanical parts, and compressor parts. In a typical casting process, the furnace area is the beginning of the manufacturing process; therefore, a long cycle time and machine delays in this area will affect the subsequent processes. This is the reason we started the project from the furnace area: to establish a transparent input flow along the whole process chain of this foundry.
Although trial and error methods are still practical in the production field, people have made many efforts proposing various strategies to improve the foundry’s production. From different points of view, such as six sigma, lean production, and simulation, these studies are all proven successful—for example, the six sigma and Lean six sigma methods to improve quality, predictions, and productivity [2,3,4,5,6,7,8]. There is a review of the analysis of foundry defects for sand casting quality improvement [9]. Another study for quality improvement of the casting process in identifying the main course defects can be found in [10]. In addition, in detecting the defects in cast iron foundry, DMAIC of lean six sigma is applied to work on the rejection rate [11]. Another research study using DMAIC in the sand-casting industry enhances productivity [12]. Some research utilized Lean Production tools such as the value stream for production efficiency improvement [13,14]. Reduction of waste also raised researchers’ attention, and statistical tools are used to optimize mechanical reclamation systems in cast iron foundry [15]. Computer simulation is another tool for the performance and improvement of the production line [16]. Machine learning technologies are also applied to improve foundry production quality [17,18], using decision trees, Bayesian Networks, and K-Nearest Neighbors algorithms. The design of experiments and analysis of variance are also popular; a recent related review can be found in [19]. To be more specific, researchers also proved that the experiment and analysis of variance are applicable in foundry production improvement [20]. A most recent review about improving sand casting foundries can be found in a conference paper [21]. In summary, to improve production efficiency, statistical analysis cannot be neglected.
In this project, we streamlined the production process in the furnace zone based on data-driven technology. Using the furnace zone’s past production records, we calculated the output efficiency of the furnace zone. We also analyzed the data on the staff member’s work style, order scheduling, personnel scheduling, and improving the furnace zone’s production efficiency and work hour optimization. Finally, we reduced unreasonable waste in the furnace zone. Improvements with statistically significant differences are described below.
The highlight of the study was the completion of three specific key performance indicators (KPIs) with the industry–academia research partners; the KPIs included increasing the daily production to over 28 pots of melting metal, reducing the average molten metal making time to 62 min per pot, and decreasing the average cycle time in the furnace zone from 219 to 135 min. In terms of corporate management, the executives were profoundly aware of the importance of building a corporate digital culture.

2. Investigation of Process Bottlenecks

Casting involves pouring molten liquid metal into a pre-made mold at an appropriate temperature range and under specific conditions. After the liquid metal is cooled and solidified, it is taken out of the mold. The required casting process is performed after proper cleaning and processing. The casting method can be divided into two depending on the casting material: the sand-casting and special casting methods. Casting is a repetitive process; the finished casting must be designed, and the model developed. The mold can be made when the model is developed. The old sand, water, binder, and new sand are mixed to form the mold and mix in the process. After the raw materials are melted into a molten metal, the casting is poured into the mold for cooling; the cast can be completed after cleaning off remaining sand, mechanical processing, heat treatment, and inspection. The process is shown in Figure 1.
According to the production process in the furnace area, the pre-feeding operation was performed first. Depending on the composition requirements of different products, sampling analysis was performed in the preparation area to determine the required raw materials. The scene in the preparation area is shown in Figure 2a. The crown block-type suction cup was used to move the returned material to the feeding cart when feeding. The vibration mode was then used to push the materials on the cart into the furnace (as shown in Figure 2b); this process was repeated until the production demand was achieved. While waiting for the melting process, different materials were added depending on the final product. After all the materials were melted, a separation operation was performed to check the quality of the raw materials in the furnace and evaluate whether they met the product specifications.
If the ingredients did not meet the specifications, the mixing and tempering of the ingredients in the furnace needed to be performed in accordance with the standard operating procedure (SOP), and the subsequent manufacturing process could only be performed after the ingredients in the furnace reached the target. The above action is called thermal refining. There could be non-metallic materials in the return stock; therefore, the stock needed to be cleaned with a slag remover before it was removed from the oven. At this point, the slag rose to the surface, and the operator removed it (as shown in Figure 3a). We call this action “removing dross” for the later content.
With the dross removed, the molten metal was ready. When the molten metal came out, it was poured into a hanging pot (as shown in Figure 3b), and the potted molten metal from the hanging pot was sent to the molding machine for pouring (as shown in Figure 4).
When making the molten metal, attention needed to be paid to the temperature and the speed at which the molding machine poured it. After the pouring process was complete, the overall process in the furnace area was complete.
At this stage, the main bottleneck of the foundry production was the furnace process. The production was divided into the furnace area and the sanding area. There were four electric furnaces in the furnace area—Furnace No. 1 and Furnace No. 2 were for one group and Furnace No. 3 and Furnace No.4 were for another group. The melting process had a maximum electricity consumption of 7000 kWh. In the plant, electricity production is divided into three main sectors: Small power (200 kWh), median power (1500–2000 kWh), and massive power (more than 3000 kWh). Two cranes were used in the process; however, they can operate only one at a time. A basin was hung on the crane to move the molten metal to the molding machine. There were two molding machine production lines in the sand mold area. The company differentiated the production lines according to the mold sizes. The larger molds are produced on the 270-production line and the smaller ones on the 230-production line.
Currently, relevant data were input by the operators, checked, and modified by senior operators while the senior operators report to the supervisor. They also record data to the electric furnace information system.

3. Analysis and Improvement

As the furnace process was identified as the bottleneck by the production manager, based on the low utilization of other workstations and idle workers, an analysis of the furnace process seems to be desired. The analysis starts from investigating the overall process in the furnace zone, followed by the investigation of scheduling, analysis of process time statistics, and so on, as stated in the following sections. We applied statistical methods to identify the source of variation and distinguish the factors with a significant difference using Analysis of Variance (ANOVA) and Least-Significant Difference (LSD) analysis. As for improving the process and scheduling, we implemented concepts from lean production, quality management, and facility layout, utilized methods such as standardization of input and operations, waste reduction, re-arrange layout, and increased productivity and decrease of cost.

3.1. Reducing the Size of Material Fed

We studied and improved the feeding stage by reducing the size of the material fed. The financial constraints often force companies to use low-cost remanufactured materials rather than ferrosilicon or silicon steel sheets. Such low-cost materials are often in different sizes and shapes, which may delay the preparation time. In other words, with a small furnace (diameter about 1 m), larger recycled metal with various shapes would make it difficult to feed the raw material to the furnace at one time using the crane-type battery suction cups (as shown in Figure 5a). Therefore, the initial preparation stage frequently takes a long time. Defining the preparation time before adding raw material to the furnace, we called it “the preparation stage.”
Another problem generated by such irregular raw material is the safety issue. When the volume of the raw material is larger, or the length of it is greater than the depth of the furnace, the dissolution time will increase, and, most importantly, a possible bridging phenomenon may occur. The bridging phenomenon occurs when the material gets stuck in the furnace. When the material underneath is melted, a distance will be created between the stove and the stock. If the operator manually pushes the material into the furnace at this time (as shown in Figure 5b), a splash of hot molten metal may hurt the operator. Therefore, before feeding the raw material, it is suggested to cut or reduce the raw materials’ volume to fit the diameter of the furnace at the preparation stage.

3.2. Improvement of Production Process at the Preparation Stage

The original data used in this study were obtained in the form of daily records either in paper form or an Excel file by a senior operator in the field. However, the wrong records can still be found frequently and verified by the production manager at the end of the shift or the second day before their daily seminar in the morning. In the seminar, the summary data will be reported, challenged, and modified if necessary. The analyzed data in this research were transformed from the paper forms and Excel files.
By investigating the actual production schedule of the electric furnaces, we found that the average cycle time of generating a pot of molten metal can be reduced by better scheduling at the preparation stage. To explain this, we take one production record (13:12~13:46) with four furnaces working simultaneously as an example, as shown in Table 1. In Table 1, the actions are pouring the molten metal (to the moldings), heating the furnace, adding raw material, sampling, thermal refining, removing the dross, preparing raw material, and stopping heating. Most of the action can only follow its precedent process closely, but not raw material preparation. It can be observed from Table 1 that the material preparation for Furnace No. 3 could be advanced to 13:15 (i.e., 15 min earlier) or earlier because the furnace operations would not be affected by the material preparation. Thermal refining of furnace No. 3 cannot start right after adding raw material (13:30) because government regulation limits electricity usage (up to 6000 W). Before 13:30, Furnace No.1 uses 3000 W, and No.4 uses 2500 W, making no room for other operations. Confined by the aforementioned limitation, only 15 min can be saved in this period. The firm’s power consumption is up to 6000 KWh for the electric furnace but usually keeps it under 5500 KWh. Some records with similar findings were found. Hence, we proposed to prepare the raw material whenever an operator is available. The allocation of electricity is then re-scheduled and resulted in some power consumption savings. The current workforce is sufficient to execute the action.

3.3. Statistical Analysis of Processing Times in the Furnace Zone

Another issue was raised when we were scheduling, and we analyzed the relation between the process times in the furnace zccone versus 11 types of material using analysis of variance (ANOVA) in the melting phase. For better understanding, we call it “molten metal making time,” which includes all the operations in the furnace zone, starting from adding raw material and ending when the molten metal is ready to be transported. We use 1932 sets of data during 2018/1~2018/7, and the 11 types of materials are Grey Cast Iron 1~ Grey Cast Iron 4, Nodular Cast Iron 1~ Nodular Cast Iron 4, Nodular Cast Iron 6, Nodular Cast Iron 6A, and Nodular Cast Iron 8. Grey Cast Irons are named FCs, and Nodular Cast Irons are named FCDs in the firm, shown as levels in Figure 6. During this period, 14 operators worked in the furnace area.
By observing the mean and variance of collected data, we suppose that some significant variance may exist. To clarify if the molten-metal-making times differ from different materials, we performed the hypothesis test.
  • Null Hypothesis: All molten-metal-making times are equal with different materials.
We apply JMP® Software from SAS to perform Analysis of Variance (ANOVA). Figure 7 shows that the average molten metal making time is 75.68 min, and there was no significant difference (p-value = 0.4104 > 0.05) in the average molten metal making time when using different materials. Therefore, another test was performed to attack the problem. The full names of notations in the following analysis are briefly introduced below.
Adj Rsquare: Adjusted R2, where R2 is the coefficient of determination.
C. Total: Corrected Total, means Total variation.
DF: Degree of freedom
p-value: A p-value is a measure of the probability that an observed difference could have occurred by chance. The higher the p-value, the smaller the statistical significance of the observed difference.
  • Null Hypothesis: All molten metal-making times are equal with different operators.
With the suspicion that operators may cause the difference, we performed this ANOVA. The result is shown in Figure 7 and shows that, with a p-value < 0.05, we reject the null hypothesis and conclude that not all molten-metal-making times are the same for different operators. In other words, some operators took significantly different times in the melting process.
The manager agreed with the above conclusion since the furnace operators have different levels of skills. To pinpoint who is taking longer in molten-metal-making times, we proposed the Least-Significant Difference (LSD) analysis of operation times, and the result is in Table 2. In Table 2, we can divide the operators into three groups: With the letter A only, with letters A and B, and with the letter B only. Operators with both A and B led to no significant differences in molten-metal-making times. It can be observed from Table 2 that operators with only the letter A took a longer time (>81 min) than operators with the only the letter B (~60 min) to melt the raw material. In short, operator I, operator J, and operator C took longer, and operator E took less time than others to finish the process. Taking operator J and operator E as an example, there is a significant difference between their average melting times (Figure 8). The conclusion is made in accordance with no overlapping between their 95% confidence intervals in molten-metal-making times. Ensuring that the product’s quality would not be affected by reducing the melting time, which the company verifies, we proposed controlling the melting time to around 60 min for all operators. The judgment that “the product quality will not be affected by the length of molten-metal-making times” can also be reasonably inferred since no quality issue was raised from these 1932 observations, where a large variance in molten-metal-making times existed. The firm then requested all operators to follow the standard operating procedure (SOP) to ensure the molten-metal-making time was about 60 min.
As the initial production cost, electricity consumption is an essential issue to the company. However, the usage of power is controlled by the operators who make the decision according to their own experiences, which causes difficulty in controlling the electricity consumption. By standardizing the melting process, the coordination of electricity consumption becomes possible. As a result, the company saved an average of $240,000NT each month (2018/8~2018/11).

3.4. Improvement of Thermal Refining

Next, we attempt to improve the process in the furnace zone. By observing the production records in Table 1, we noticed that the thermal refining operation takes place only once in many productions, whereas sometimes it happens 2–4 times. Table 3 shows a record of Furnace No. 4 operations with Nodular Cast Iron 2 material (called FCD2), where the red squares represent the occurrence of thermal refining. A general procedure of melting metal in a furnace consists of heating up the furnace, verifying the ingredients by spectral inspection, adjusting the ingredients by adding Si, Fe, etc., as a supplement, spectral inspection again, and removing dross. Adjusting the ingredients is called thermal refining, and ingredients need to be adjusted repeatedly until the spectral inspection is passed. One additional thermal refining takes 10 more minutes before finishing the melting process. Such a failure would delay the production schedule and increase the electricity cost for maintaining the temperature. Therefore, to reduce the cycle time of generating each pot of molten metal to enhance productivity, it is desirable to lower the frequency of thermal refining and reduce the thermal refining time.
To lower the frequency, it is necessary to know the ingredients of raw materials in the preparation stage. The raw materials from different suppliers with various ingredients used to be orderless, making it difficult to know exactly which ingredients were in the preparation stage. Now, the raw materials are classified while purchasing, and the proper materials will be selected to fit the product formular. To reduce the thermal refining time, we shortened the time taken for adding supplement ingredients by re-arranging and fixing the location of ingredients bins so the operators can easily fetch what is needed without searching. The most frequently used ingredient Si is located closer to the operators and the number of bins are increased from 2 to 4, one bin for one furnace.
As the result in 2018/8~2018/11, 95% of the process needs no thermal refining, 4.5% needs it once, and 0.5% took more than once.

3.5. Statistical Analysis of Molten Metal Consuming Times

As described in chapter 2, when the molten metal is ready, it will be poured into a hanging pot and transported to the molding machine for pouring into the molds. It often takes several instances of pouring for the molding machine to consume all molten metal. With defining the time between “start to pour molten metal into a hanging pot” and “consume all molten metal” as the “transportation time,” the average transportation time of 1932 transportations was 49.70445 min, as shown in Figure 9. We discovered that there exist large variations in transportation time, and we test the following hypothesis to verify whether the materials make a difference (Figure 9).
  • Null Hypothesis: All transportation times are equal with different materials.
From Figure 9, we can conclude that not all transportation times are the same with different materials (p-value = 0.01333 < 0.05). To pinpoint which materials make a difference, an LSD analysis is performed and the result is as shown in Table 4.
From Table 4, we can observe that the transportation of FCD2 (~55.1 min) is much longer than FCD8 (~40.5 min). However, theoretically, the material should not make a difference. We further discussed this with the engineer and found that the transportation time is related to the size of the molds. The suggestion to the firm is to consider the mold sizes when scheduling.

4. Discussion

After discussing the results of the study with the manufacturer, the recommendations and improvements are summarized below.
  • Reducing the size of material fed at the preparation stage.
Improvement: Speed up the melting process and reduce the risk of injury.
  • Prepare materials in advance as early as possible during the production process at the preparation stage.
Improvement: Reduced cycle time of molten metal making and some power consumption saving.
  • Ask operators to follow SOP to standardize the molten-metal-making times.
Improvement: Reduced cycle time of molten metal made from 72.3(2018/1~7) to 62.1 min (2018/8-11), and the standard deviation decreased from 16.6 to 14.9 min.
  • Control ingredients of raw materials and re-allocate material storage in the field for thermal refining
Improvement: Lower the frequency of thermal refining and reduce the processing time. The processing time is reduced.
From January to July in 2018, the average electric power consumption per ton was 665 KWh. From August to November, the average electric power consumption per ton was 634 KWh. Adopting our proposals, the electric power consumption per ton was reduced, and the firm can save NT$240,000 per month. The variations of the processes ranging from feeding, melting, tempering, and delivery times were reduced. The average cycle time of producing a pot of molten metal was improved from 219 min to 135 min. The daily production was uncontrollable, ranging from 20 to 30 pots of molten metal, and it is now more than 28 pots of molten metal every day.

5. Conclusions

Data analysis is becoming more and more important, and our project is an example of organization in the process of automation. We started improvement from the bottleneck, standardized the input and procedure of operations, performed basic statistical analysis to identify the source of variation, eliminated waste (waiting time), and maintained a smooth flow.
Based on our suggestions, the firm improved its production schedules and processes, used statistical methodologies for data analysis, reduced the production cycle times, decreased the power consumption, and eventually decreased the production cost. Another important contribution of this project is to promote the executives the importance of data analysis.
The research limitation was that some historical data were missing or mistaken, which cost us much time to collect the desired data. Another problem is that some operators signed other operator’s names instead of their own names, which caused the mismatch of data.
Our future study will focus on the line balancing of all workstations using system simulation tools, as the input flow of the first station has been stabilized. Another goal will be further reducing the power consumption since it is the primal cost for the plant.

Author Contributions

Conceptualization, C.-C.W. and K.C.; methodology, C.-C.W.; validation, C.-C.W., K.C., and C.-H.K.; formal analysis, C.-C.W. and C.-H.K.; data curation, C.-H.K.; writing—original draft preparation, C.-C.W. writing—review and editing, K.C. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Generated during the study.

Acknowledgments

The authors would like to thanks Vice President Cao of CMP Group and Senior Manager Jimmy Liu, they helped in data collection and professional knowledge.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Yang, R.W. Analysis of the Current Situation of Taiwan’s Foundry Industry, Public Website of Metal Industries Research & Development Centre. 2016. Available online: https://www2.itis.org.tw/netreport/NetReport_Detail.aspx?rpno=888669795 (accessed on 19 June 2021). (In Chinese).
  2. Patil, S.D.; Ganganallimath, M.M.; Math, R.B.; Karigar, Y. Application of Six Sigma method to reduce defects in green sand-casting process: A case study. Int. J. Recent Technol. Mech. Electr. Eng. 2015, 2, 37–42. [Google Scholar]
  3. Sarkar, B.N. Capability enhancement of a metal casting process in a small steel foundry through Six Sigma: A case study. Int. J. Six Sigma Compet. Advant. 2007, 3, 56–71. [Google Scholar] [CrossRef]
  4. Wang, C.C.; Chun-Ting, L. An Empirical Study of the Machine Assembly Efficiency Improvement Based on Lean Six Sigma Technique. TEM J. 2019, 8, 471–476. [Google Scholar]
  5. Mishra, N.; Rane, S.B. Prediction and improvement of iron casting quality through analytics and Six Sigma approach. Int. J. Lean Six Sigma 2019, 10, 189–210. [Google Scholar] [CrossRef]
  6. Kumar, S.; Satsangi, P.S.; Prajapati, D.R. Improvement of Sigma level of a foundry: A case study. TQM J. 2013, 25, 2943. [Google Scholar] [CrossRef]
  7. Ghosh, S.; Maiti, J. Data mining driven DMAIC framework for improving foundry quality-a case study. Prod. Plan. Control. 2014, 25, 478–493. [Google Scholar] [CrossRef]
  8. Kumar, S.; Prajapati, D.R.; Satsangi, P.S. Design for Six Sigma to optimise the process parameters of a foundry. Int. J. Product. Qual. Manag. 2011, 8, 333–355. [Google Scholar] [CrossRef]
  9. Chaudhari, S.; Thakkar, H. Review on analysis of foundry defects for quality improvement of sand casting. Int. J. Eng. Res. Appl. 2014, 4, 615–618. [Google Scholar]
  10. Siekanski, K.; Borkowski, S. Analysis of foundry defects and preventive activities for quality improvement of castings. METALURGIJA 2003, 42, 57–60. [Google Scholar]
  11. Barot, R.S.; Patel, J.; Sharma, B.; Rathod, B.; Solanki, H.; Patel, Y. Lean six sigma feasibility and implementation aspect in cast iron foundry. Mater. Today Proc. 2020, 28, 1084–1091. [Google Scholar] [CrossRef]
  12. Solanki, M.; Desai, D. Competitive advantage through Six Sigma in sand casting industry to improve overall first-pass yield: A case study of SSE. Int. J. Lean Six Sigma 2020. [Google Scholar] [CrossRef]
  13. Parthanadee, P.; Buddhakulsomsiri, J. Production efficiency improvement in batch production system using value stream mapping and simulation: A case study of the roasted and ground coffee industry. Prod. Plan. Control 2012, 25, 425–446. [Google Scholar] [CrossRef]
  14. Pude, G.C.; Naik, G.R.; Naik, P.G. Application of value stream mapping tools for process improvement a case study in foundry. IOSR J. Mech. Civ. Eng. 2012, 3, 7–12. [Google Scholar]
  15. Vijayakumar, S.; Srinivasan, M.V.; Govindaraju, M. Reduction of waste in furan molding process from cast iron foundry. Mater. Today Proc. 2020. [Google Scholar] [CrossRef]
  16. Saidabad, A.A.; Taghizadeh, H. Performance and improvement of production line function using computer simulation (case study: An iron foundry). Am. J. Comput. Math. 2015, 5, 431. [Google Scholar] [CrossRef] [Green Version]
  17. Perzyk, M.; Soroczyski, A.; Biernacki, R. Possibilities of decision trees applications for improvement of quality and economics of foundry production. Arch. Foundry Eng. 2008, 8, 261–268. [Google Scholar]
  18. Santos, I.; Nieves, J.; Penya, Y.K.; Bringas, P.G. Optimising machine-learning- based fault prediction in foundry production. In International Work-Conference on Artificial Neural Networks; Springer: Berlin/Heidelberg, Germany, 2009; pp. 554–561. [Google Scholar]
  19. Modi, V.K.; Desai, D.A. Review of TAGUCHI method, design of experiment (DOE) & analysis of variance (anova) for quality improvements through optimization in foundry. J. Emerg. Technol. Innov. Res. 2018, 5, 184–195. [Google Scholar]
  20. Mohiuddin, M.V.; Krishnaiah, A.; Hussainy, S.F. Influence of Sand Molding Process Parameters on Product Quality of Al-Si Alloy Casting-An ANOVA Approach. Int. J. Adv. Res. Sci. Eng. 2015, 4, 1751–1760. [Google Scholar]
  21. Sithole, C.; Nyembwe, K.; Olubambi, P. Process knowledge for improving quality in sand casting foundries: A literature review. Procedia Manuf. 2019, 35, 356–360. [Google Scholar] [CrossRef]
Figure 1. The process flow of casting.
Figure 1. The process flow of casting.
Processes 09 01083 g001
Figure 2. (a) The scene in the preparation area. (b) The process of feeding materials into the furnace.
Figure 2. (a) The scene in the preparation area. (b) The process of feeding materials into the furnace.
Processes 09 01083 g002
Figure 3. (a) Removing dross manually; (b) the molten metal is poured into the hanging pot.
Figure 3. (a) Removing dross manually; (b) the molten metal is poured into the hanging pot.
Processes 09 01083 g003
Figure 4. The hanging pot moves to the moldings.
Figure 4. The hanging pot moves to the moldings.
Processes 09 01083 g004
Figure 5. (a) The manual slag removal action; (b) the raw material is manually pushed into the furnace.
Figure 5. (a) The manual slag removal action; (b) the raw material is manually pushed into the furnace.
Processes 09 01083 g005
Figure 6. ANOVA: Molten-metal-making times versus 11 materials.
Figure 6. ANOVA: Molten-metal-making times versus 11 materials.
Processes 09 01083 g006
Figure 7. ANOVA: Molten-metal-making times versus 14 furnace operators. * indicates that the statistical test result is significant.
Figure 7. ANOVA: Molten-metal-making times versus 14 furnace operators. * indicates that the statistical test result is significant.
Processes 09 01083 g007
Figure 8. Comparison of the differences between the two operators.
Figure 8. Comparison of the differences between the two operators.
Processes 09 01083 g008
Figure 9. ANOVA of transportation time versus 11 materials. * indicates that the statistical test result is significant.
Figure 9. ANOVA of transportation time versus 11 materials. * indicates that the statistical test result is significant.
Processes 09 01083 g009
Table 1. An example of actions of four furnaces with electricity settings.
Table 1. An example of actions of four furnaces with electricity settings.
Processes 09 01083 i001
Table 2. The results of grouping operators.
Table 2. The results of grouping operators.
Connecting Letters Report
Level Mean
OP IA 84.980583
OP JA 82.819188
OP CA 81.092920
OP HAB80.757143
OP LAB77.562500
OP AAB75.256757
OP BAB75.041667
OP GAB73.207031
OP KAB70.290850
OP NAB69.600000
OP MAB61.000000
OP E B60.238095
OP FAB56.000000
OP DAB55.000000
Note: Levels not connected by same letter are significantly different and mean operation times are in minutes.
Table 3. FCD2 thermal refining actions in furnace No.4.
Table 3. FCD2 thermal refining actions in furnace No.4.
Furnace No.4TimeActionElectricity
FCD213:39Unloading200
13:21Power on2000
13:27Hoisting material 340 kg200
13:28Hoisting material 410 kg200
13:30Unloading200
13:49Unloading truck moves backward200
13:50Turn the electricity to maximum200
13:51Hoisting material 386 kg3500
13:53Hoisting material 374 kg3500
13:55Hoisting material 420 kg3500
13:57Unloading3500
13:06Unloading truck moves backward3500
14:07Solving brid ging3500
14:12Eliminate brid ging3500
14:15Measuring CE and first spectroscopic3500
14:21Hoisting FCD 520 kg3500
14:23Unloading and thermal refining3500
14:24Unloading3500
14:25Unloading truck moves backward3500
14:27Second spectroscopic3500
14:30Measuring temperature3500
14:32Power off200
14:34Mix in Si-Fe 3 kg and thermal refining200
14:35Drossing200
14:37Out of soup 936 kg to crane no.2200
14:48Crane no.2 right chift200
14:49Measuring temperature200
14:50Drossing200
14:52Crane No.3 moves to the front of the furnace200
14:53Out of soup 800 kg to 270 proudction line200
14:55Hoisting iron sheet 520 kg200
15:01Unloading200
15:03Power on2500
15:08Mix in 18 kg of Cu2500
15:10Mix in 8 kg of ferro-manganese2500
15:13Third spectroscopic2500
15:16Drossing2500
15:30Mix in FCD 250kg2500
15:32Unloading2500
15:37Tum the electricity to maximum3500
15:38Measuring temperature3500
15:39Drossing3500
15:41Power off200
Table 4. LSD analysis of transportation time versus 11 materials.
Table 4. LSD analysis of transportation time versus 11 materials.
Connecting Letters Report
Level Mean
FC1AB57.941176
FCD2A 55.097983
FCD6AAB52.444444
FCD1AB50.358209
FC4AB49.718605
FCD6AB49.060000
FC3AB48.100840
FCD4AB47.981308
FCD3AB46.324561
FC2AB45.329114
FCD8 B40.545455
Note: Levels not connected by same letter are significantly different.
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Chen, K.; Wang, C.-C.; Kuo, C.-H. Empirical Study of Foundry Efficiency Improvement Based on Data-Driven Techniques. Processes 2021, 9, 1083. https://0-doi-org.brum.beds.ac.uk/10.3390/pr9071083

AMA Style

Chen K, Wang C-C, Kuo C-H. Empirical Study of Foundry Efficiency Improvement Based on Data-Driven Techniques. Processes. 2021; 9(7):1083. https://0-doi-org.brum.beds.ac.uk/10.3390/pr9071083

Chicago/Turabian Style

Chen, Kuentai, Chien-Chih Wang, and Chi-Hung Kuo. 2021. "Empirical Study of Foundry Efficiency Improvement Based on Data-Driven Techniques" Processes 9, no. 7: 1083. https://0-doi-org.brum.beds.ac.uk/10.3390/pr9071083